Files
zmVault/three-point-estimation.md
T

645 B

title, tags
title tags
Three-Point Estimation
topic/estimating
topic/risk

Three-Point Estimation

  • best-case or optimistic
  • worst-case or pessimistic
  • most-likely

Wikipedia

PMI

A risk-neutral party would set selling price at the most likely. The difference between the pessimistic estimate and selling price is the value-at-risk.

Three-point estimating is considered the bare minimum in most industries.