Pre-Takeoff Confirmation |
Pre-Takeoff Confirmation
The purpose of the pre-takeoff confirmation is to address potential discrepancies between the requirements of the project documents and the scope included in the bid team's proposed price.
Before sending the confirmation, see pre-takeoff-research for common issues.
[!example] Example provided by Joel Jansen 2025-09-18, edited Good morning,
Please see below and confirm the documents we plan to use while we takeoff Alta Watkins are correct.
- Plans & Specs,
- Drawings: GMP, 2025-09-11
- Project Manual: GMP Specifications, 2025-09-11
- Proposal: 2025-07-03
- Takeoff Stage: Full Take Off
Also, please confirm:
- Are there any variations from the drawings that we need to include in our takeoff?
- Any accepted/pending alternates?
Feeders:
- Size per Schedule on drawings (AL +100 A).
- PVC UG, EMT OH.
Subfeeds:
- MC for metal stud units, SER all other units
Voltage Drop: As shown for subfeeds, 2% Feeders
Units:
- Devices: Standard Duplex/Toggle
- USB Rec's: As shown, plus 1 per bedroom (Type A & C).
- Studs: Metal in M units, Wood all other locations.
- Telecom: 30" UDP, CAT6. (use 28" in takeoff)
- Smoke Detection: 120V
Fire Alarm:
- Pathways: Free Air
- 2-Way: Included
Electrical:
- Devices: Decora Amenities, Duplex/Toggle BOH
Fixtures:
- Cable: LV in Amenity Areas
- Occupancy Sensors: Local
Thank you,