Subfeeds

Sequence

1. Estimate preparation

  1. Read about the project specifications and construction type
  • Delivery Method: (Plans & Specs, Design Build, Design Assist, Preliminary Budget)
  • Deck Thickness
  • Corridor Ceiling type
  1. In the drawings, locate:
  • Unit Panel Schedules
  • Unit Load Calculations
  • Riser Diagram
  • Subfeed schedule (if present)

2. Takeoff

  1. Determine wiring method

    Construction Type Wiring Method Subfeed Options
    1,2 MC Cable MC, PVC, EMT
    3,4,5 NM Cable SER, EMT

    %% TODO: Create flow chart for wiring methods. Some cases to mention:

    • Deck thickness (minimum 3x conduit outer diameter)
    • Renovations (may not be able to run in slab) %%
  2. Route subfeeds to the Meter Centers using appropriate adder lengths

    Tip

    Identify if and where typicals can be used

  3. Assign material to lengths and apply Voltage drop if applicable

  4. Pigtails and Wireway Troughs if applicable

3. Extension (Review and Checking)

  1. Use the extension tab to determine the Correct Quantity