474 B
474 B
id, aliases, tags
| id | aliases | tags | |
|---|---|---|---|
|
Traditional Estimating Methods
Also "single-point estimation" as opposed to the standard three-point.
"Traditional estimating methods" as referenced frequently in this notebook are those construction-estimating methods that produce:
- an exhaustive and specific bill of material
- a single, definitive final price for each bid item
Such methods lack the ability to intelligently express uncertainty.