Files
zmVault/pdi-accubid-quoted-material.md
T

1015 B

id, aliases, title, tags, dg-publish
id aliases title tags dg-publish
PDI Accubid Closeout: Quoted Material
authorship/original
destiny/permanent
occupational/closeout
status/incomplete
type/guide
true

PDI Accubid Closeout: Quoted Material

Important

Quoted material costs must be ==pre-tax==.

Fixtures

  • Vendor <- "PDR - {Quote Type}" (e.g. "PDR - Spec/Equal", "PDR - VE")
  • Quote <- Per PDI Systems proposal
  • Notes <- Quote date

Tip

PDR fixture quotes are usually broken out by area type. It is not necessary to preserve these breakdowns in the estimate. Use the sum total cost in a single Quoted Materials line item.

Switchgear

  • Vendor <- Per quote (or "PDI BUDGET" if not available)
  • Quote <- Per quote (or Bid Sheet Budget if not available)
  • Notes <- Quote Date

Generator

  • Vendor <- Per quote (or "PDI BUDGET" if not available)
  • Quote <- Per quote (or Bid Sheet Budget if not available)
  • Notes <- Quantity, Size in kW, Quote Date