875 B
875 B
id, aliases, tags
| id | aliases | tags | ||
|---|---|---|---|---|
|
Low Voltage
Info
- Security/Intrusion Detection
- Access Control
- CCTV
- Audio-Visual
- Wi-Fi
Not to be confused with telecom.
Routing
Exposed Ceilings
EMT to accessible space? PVC to MDF?
Devices
Daisy Chaining
how many devices (if any)
Sequence
1. Estimate preparation
- Locate Proposal/Scope of Work. Determine ownership and takeoff responsibility:
- Cabling
- Conduit & Pathways
- Sleeving
- In the drawings, locate:
- Floor plans where LV scope is shown
- LV Details
- Read about the project specifications and construction type
- Fill out OneNote
2. Takeoff
- Takeoff devices as shown throughout the building
- Takeoff riser conduit as needed
3. Extension (Review and Checking)
- Sleeving for riser