Statistical Modeling for Construction Estimating
Cross-topic of statistical-modeling and construction-estimating.
Bayesian Takeoff
User Story
Frank is estimating a 20-story high rise and notices that their are roughly, but not exactly, the same number of receptacles in the corridors of levels 2 to 19. Frank starts a new takeoff for duplex receptacles, typical of levels 2 to 19. He counts and inputs quantities for 3 levels, each adjusts the prior to calculate the expected quantity for all 18 levels.
Stochastic Branch Takeoff
generate a BOM from point loads distributed in a space.
- x: 302.84
y: 2364.47
kW: 5.3
voltage: 277
phases: 1
...
determine relative impact of factors
- allowable voltage drop
Methods
[!cite] Reddit u/mightofmerchants !spatial-sampling.gif
- Poisson disc sampling
- Delunay triangulation
- Voronoi diagrams
%% TODO: link paper on procedural generation of single family homes %%
Average Distance Given Area
Holding area constant, average taxicab distance between points varies greatly with the aspect ratio of the space. Weighted by a probability distribution an average length and confidence could be given for any known area.
Maximum area per floor is sometimes capped by ibc-construction-types or ibc-occupancy-classifications, either directly (see ibc_ch05, ibc_ch09), or by maximum travel distance (see ibc_ch10). Stairwells are expensive. There are usually only 2 or 3.