## Wire Material Selection
|
||||
|
||||
[[pdi-estimating]] preference is to use aluminum conductors
|
||||
|
||||
If [[pdi-bid-estimating|Bid]]'s proposal sells aluminum 100A and larger
|
||||
use aluminum for grounds, even if the feeder schedule uses copper.[^1]
|
||||
|
||||
[^1]: [[2026-05-06_14-00-10]]
|
||||
|
||||