## Pre-Takeoff Email Template Meeting
|
||||
|
||||
### Scratch
|
||||
|
||||
Meeting lead by Josh Ford
|
||||
to discuss acceptable use of [[conest-pre-takeoff-email-template]]
|
||||
to discuss acceptable use of [[conest-pre-takeoff-email-template]].
|
||||
|
||||
***
|
||||
### Topics
|
||||
|
||||
#### Purpose
|
||||
|
||||
Reiterated intent to replace OneNote,
|
||||
however stated that OneNote might (even should)
|
||||
be used to track
|
||||
|
||||
Template should be pasted into the email body,
|
||||
not sent as attachment.
|
||||
To be revisited in audit meeting [[2026-W13|next week]].
|
||||
|
||||
Intent is too provide information to the bid team
|
||||
potentially to be qualified in future bids.
|
||||
|
||||
***
|
||||
|
||||
> [!example] [[sunset-amphitheater]]
|
||||
> Cummins generator was spec'd, quoted,
|
||||
> but not used in estimate because it was not cheapest.
|
||||
|
||||
Josh, Corwin, Procurement
|
||||
to provide a list of "typical PDI manufactures"
|
||||
for Wire, Generator, Switchgear
|
||||
rather than include entire list from specs.
|
||||
|
||||
> Wire:
|
||||
> * Encore
|
||||
> * Okonite
|
||||
> * Southwire
|
||||
|
||||
***
|
||||
|
||||
[[conest-pre-takeoff-email-template#Project Drawing/Detail Callouts]]
|
||||
|
||||
High-cost impact items
|
||||
not mentioned in proposal
|
||||
not shown in Bid Sheet.
|
||||
|
||||
* dimming in units
|
||||
* balcony pedestals
|
||||
|
||||
***
|
||||
|
||||
[[conest-pre-takeoff-email-template#Lighting Control]]
|
||||
|
||||
Intent is to provoke conversation ahead of takeoff
|
||||
to prevent rework
|
||||
|
||||
not necessary to list all areas
|
||||
if not applicable to project
|
||||
(code minimum)
|
||||
|
||||
***
|
||||
|
||||
[[conest-pre-takeoff-email-template#Tasks/Quotes Needed for WBS]]
|
||||
|
||||
> BPM has both
|
||||
> tasks within bid round and
|
||||
> tasks outside of bid round.
|
||||
|
||||
to be revisited in dedicated meeting
|
||||
|
||||
***
|
||||
|
||||
cc: Josh Ford, Corwin Fluitt, Jessalyn
|
||||
|
||||
***
|
||||
|
||||
Response from Bid is necessary within three days.
|
||||
|
||||
"See proposal" is unacceptable response.
|
||||
Escalate issue.
|
||||
|
||||
***
|
||||
|
||||
> 1. ConEst deviates from specs based on direction from Bid.
|
||||
> 2. Awarded contract does not include respect for the direction
|
||||
> 3. Ops, not aware of direction, believes ConEst takeoff was in error.
|
||||
@@ -109,22 +44,6 @@ an area the OneNote is poor in.
|
||||
|
||||
***
|
||||
|
||||
Only when we're touching a job for the first time,
|
||||
not revisions.
|
||||
|
||||
***
|
||||
|
||||
Other media were considered,
|
||||
but email text was determined to be optimal
|
||||
to prevent lost attachments and broken links.
|
||||
|
||||
***
|
||||
|
||||
Consistency in formatting is prioritized
|
||||
ConEst resources to be allocated by availability, not region.
|
||||
|
||||
***
|
||||
|
||||
Direction from Aaron to improve turnaround
|
||||
while maintaining standards
|
||||
including presentability of information;
|
||||
@@ -158,8 +77,79 @@ but ConEst's role is to prevent PDI _from making bad deals_
|
||||
> Similar could be said by Ops about ConEst.
|
||||
> ~~They have more time than us~~
|
||||
|
||||
#### Use
|
||||
|
||||
Only when we're touching a job for the first time,
|
||||
not revisions.
|
||||
|
||||
Template should be pasted into the email body,
|
||||
not sent as attachment.
|
||||
To be revisited in audit meeting [[2026-W13|next week]].
|
||||
|
||||
cc: Josh Ford, Corwin Fluitt, Jessalyn
|
||||
|
||||
Other media were considered,
|
||||
but email text was determined to be optimal
|
||||
to prevent lost attachments and broken links.
|
||||
|
||||
Consistency in formatting is prioritized
|
||||
ConEst resources to be allocated by availability, not region.
|
||||
|
||||
Response from Bid is necessary within three days.
|
||||
|
||||
"See proposal" is unacceptable response.
|
||||
Escalate issue.
|
||||
|
||||
#### Acceptable Manufacturers
|
||||
|
||||
> [!example] [[sunset-amphitheater]]
|
||||
> Cummins generator was spec'd, quoted,
|
||||
> but not used in estimate because it was not cheapest.
|
||||
|
||||
Josh, Corwin, Procurement
|
||||
to provide a list of "typical PDI manufactures"
|
||||
for Wire, Generator, Switchgear
|
||||
rather than include entire list from specs.
|
||||
|
||||
> Wire:
|
||||
> * Encore
|
||||
> * Okonite
|
||||
> * Southwire
|
||||
|
||||
#### Project Drawing/Detail Callouts
|
||||
|
||||
[[conest-pre-takeoff-email-template#Project Drawing/Detail Callouts]]
|
||||
|
||||
High-cost impact items
|
||||
not mentioned in proposal
|
||||
not shown in Bid Sheet.
|
||||
|
||||
* dimming in units
|
||||
* balcony pedestals
|
||||
|
||||
#### Lighting Control
|
||||
|
||||
[[conest-pre-takeoff-email-template#Lighting Control]]
|
||||
|
||||
Intent is to provoke conversation ahead of takeoff
|
||||
to prevent rework
|
||||
|
||||
not necessary to list all areas
|
||||
if not applicable to project
|
||||
(code minimum)
|
||||
|
||||
#### Tasks/Quotes Needed for WBS
|
||||
|
||||
[[conest-pre-takeoff-email-template#Tasks/Quotes Needed for WBS]]
|
||||
|
||||
> BPM has both
|
||||
> tasks within bid round and
|
||||
> tasks outside of bid round.
|
||||
|
||||
To be revisited in [[[[2026-03-25_13-17-35#BPM Tasks Meeting|dedicated meeting]]
|
||||
|
||||
### Meetings to Follow
|
||||
|
||||
* ConEst Audit Scorecard --- [[2026-03-25]]
|
||||
* BPM --- TBD
|
||||
* BPM Tasks Meeting --- TBD
|
||||
* ConEst Town Hall --- TBD
|
||||
|
||||