vault backup: 2026-03-25 16:47:08
This commit is contained in:
+13
-1
@@ -3,7 +3,10 @@
|
||||
"snippetVariables": "{\n\t\"${GREEK}\": \"alpha|beta|gamma|Gamma|delta|Delta|epsilon|varepsilon|zeta|eta|theta|vartheta|Theta|iota|kappa|lambda|Lambda|mu|nu|xi|omicron|pi|rho|varrho|sigma|Sigma|tau|upsilon|Upsilon|phi|varphi|Phi|chi|psi|omega|Omega\",\n\t\"${SYMBOL}\": \"parallel|perp|partial|nabla|hbar|ell|infty|oplus|ominus|otimes|oslash|square|star|dagger|vee|wedge|subseteq|subset|supseteq|supset|emptyset|exists|nexists|forall|implies|impliedby|iff|setminus|neg|lor|land|bigcup|bigcap|cdot|times|simeq|approx\",\n\t\"${MORE_SYMBOLS}\": \"leq|geq|neq|gg|ll|equiv|sim|propto|rightarrow|leftarrow|Rightarrow|Leftarrow|leftrightarrow|to|mapsto|cap|cup|in|sum|prod|exp|ln|log|det|dots|vdots|ddots|pm|mp|int|iint|iiint|oint\"\n}\n",
|
||||
"snippetsEnabled": true,
|
||||
"snippetsTrigger": "Tab",
|
||||
"snippetNextTabstopTrigger": "Tab",
|
||||
"snippetPreviousTabstopTrigger": "Shift-Tab",
|
||||
"suppressSnippetTriggerOnIME": true,
|
||||
"suppressIMEWarning": false,
|
||||
"removeSnippetWhitespace": true,
|
||||
"autoDelete$": true,
|
||||
"loadSnippetsFromFile": false,
|
||||
@@ -16,15 +19,24 @@
|
||||
"highlightCursorBracketsEnabled": true,
|
||||
"mathPreviewEnabled": true,
|
||||
"mathPreviewPositionIsAbove": true,
|
||||
"mathPreviewCursor": "▶",
|
||||
"mathPreviewBracketHighlighting": false,
|
||||
"autofractionEnabled": true,
|
||||
"autofractionSymbol": "\\frac",
|
||||
"autofractionBreakingChars": "+-=\t",
|
||||
"matrixShortcutsEnabled": false,
|
||||
"taboutEnabled": true,
|
||||
"taboutTrigger": "Tab",
|
||||
"autoEnlargeBrackets": true,
|
||||
"wordDelimiters": "., +-\\n\t:;!?\\/{}[]()=~$",
|
||||
"autofractionExcludedEnvs": "[\n\t\t[\"^{\", \"}\"],\n\t\t[\"\\\\pu{\", \"}\"]\n\t]",
|
||||
"matrixShortcutsEnvNames": "pmatrix, cases, align, gather, bmatrix, Bmatrix, vmatrix, Vmatrix, array, matrix",
|
||||
"taboutClosingSymbols": "), ], \\rbrack, \\}, \\rbrace, \\rangle, \\rvert, \\rVert, \\rfloor, \\rceil, \\urcorner, }",
|
||||
"autoEnlargeBracketsTriggers": "sum, int, frac, prod, bigcup, bigcap",
|
||||
"forceMathLanguages": "math"
|
||||
"forceMathLanguages": "math",
|
||||
"snippetDebug": "off",
|
||||
"vimEnabled": false,
|
||||
"vimSelectMode": "<C-g>",
|
||||
"vimVisualMode": "<C-g>",
|
||||
"vimMatrixEnter": "o"
|
||||
}
|
||||
@@ -13,6 +13,8 @@ dg-publish: true
|
||||
# ConEst Pre-Takeoff Email Template
|
||||
|
||||
%%
|
||||
Email template for use in [[pdi-pre-takeoff-confirmation]].
|
||||
|
||||
This template effectively replicates the official template,
|
||||
originally written in Microsoft Word.
|
||||
|
||||
|
||||
+3
-3
@@ -18,9 +18,9 @@ dg-publish: true
|
||||
|
||||
## Prerequisites
|
||||
|
||||
1. [[pdi-conest-project-setup]]
|
||||
2. [[pre-takeoff-research]]
|
||||
3. [[pdi-pre-takeoff-confirmation]]
|
||||
1. [[pre-takeoff-research]]
|
||||
2. [[pdi-pre-takeoff-confirmation]]
|
||||
3. [[pdi-conest-project-setup]]
|
||||
|
||||
## Sequence
|
||||
|
||||
|
||||
@@ -17,52 +17,30 @@ is to address potential discrepancies
|
||||
between the requirements of the project documents
|
||||
and the scope included in the bid team's proposed price.
|
||||
|
||||
> [!important]
|
||||
> Complete [[pre-takeoff-research]]
|
||||
> before sending the confirmation.
|
||||
## Procedure
|
||||
|
||||
> [!example] Example provided by Joel Jansen 2025-09-18, edited
|
||||
> Good morning,
|
||||
>
|
||||
> Please see below and confirm the documents we plan to use
|
||||
> while we takeoff Alta Watkins are correct.
|
||||
>
|
||||
> * Plans & Specs,
|
||||
> * Drawings: GMP, 2025-09-11
|
||||
> * Project Manual: GMP Specifications, 2025-09-11
|
||||
> * Proposal: 2025-07-03
|
||||
> * Takeoff Stage: **Full Take Off**
|
||||
>
|
||||
> Also, please confirm:
|
||||
>
|
||||
> 1. Are there any variations from the drawings that we need to include in our takeoff?
|
||||
> 2. Any accepted/pending alternates?
|
||||
>
|
||||
> Feeders:
|
||||
> * Size per Schedule on drawings (AL +100 A).
|
||||
> * PVC UG, EMT OH.
|
||||
>
|
||||
> Subfeeds:
|
||||
> * MC for metal stud units, SER all other units
|
||||
>
|
||||
> Voltage Drop: As shown for subfeeds, 2% Feeders
|
||||
>
|
||||
> Units:
|
||||
> * Devices: Standard Duplex/Toggle
|
||||
> * USB Rec's: As shown, plus 1 per bedroom (Type A & C).
|
||||
> * Studs: Metal in M units, Wood all other locations.
|
||||
> * Telecom: 30" UDP, CAT6. (use 28" in takeoff)
|
||||
> * Smoke Detection: 120V
|
||||
>
|
||||
> Fire Alarm:
|
||||
> * Pathways: Free Air
|
||||
> * 2-Way: Included
|
||||
>
|
||||
> Electrical:
|
||||
> * Devices: Decora Amenities, Duplex/Toggle BOH
|
||||
>
|
||||
> Fixtures:
|
||||
> * Cable: LV in Amenity Areas
|
||||
> * Occupancy Sensors: Local
|
||||
>
|
||||
> Thank you,
|
||||
### Complete the Template
|
||||
|
||||
Complete [[conest-pre-takeoff-email-template|the template]]
|
||||
for the project.
|
||||
Direction is included in comments.
|
||||
|
||||
### Send the Email
|
||||
|
||||
Paste the completed template content to the body of a new email.
|
||||
|
||||
**Subject:** "Pre-Takeoff Confirmation - ..."
|
||||
|
||||
**To:**
|
||||
* Preconstruction Manager %% Brian %%
|
||||
* Senior Bid Estimator %% Christian %%
|
||||
* Bid Estimator or Associate Estimator (if applicable)
|
||||
|
||||
**CC:**
|
||||
* Senior Construction Estimator %% Joel %%
|
||||
* ConEst Manager (Josh Ford)
|
||||
* Director of Estimating (Corwin Fluit)
|
||||
* Jessalyn Williams
|
||||
* Other ConEst Estimators (if applicable)
|
||||
|
||||
[^1]: [[2026-03-20_09-11-09#Pre-Takeoff Email Process]]
|
||||
|
||||
@@ -32,5 +32,5 @@ are potentially very different.
|
||||
|
||||
## See Also
|
||||
|
||||
* [[2025-12-03_15-54-22]]
|
||||
* [[2025-11-06_18-12-00]]
|
||||
* [[2025-12-03_15-54-22#Excluding Vs. Ignoring Project Requirements]]
|
||||
* [[2025-11-06_18-12-00#"Bad Bid Practice"]]
|
||||
|
||||
@@ -7,6 +7,7 @@ tags:
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/timestamped
|
||||
- topic/estimating
|
||||
daily: "[[2026-03-13]]"
|
||||
date-created: 2026-03-13T09:47:42-04:00
|
||||
dg-publish: true
|
||||
@@ -38,4 +39,6 @@ a program could be made to draw the paths
|
||||
with colors by cable type
|
||||
and a legend with counts and total lengths,
|
||||
writing the markup to PDF or TIFF
|
||||
which could be uploaded
|
||||
which could be uploaded to Trimble Connect
|
||||
and used as the `Drawing`
|
||||
for takeoffs with lot **Length** and **Count**.
|
||||
|
||||
@@ -7,6 +7,7 @@ tags:
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/timestamped
|
||||
- topic/hobbies/cooking
|
||||
daily: "[[2026-03-14]]"
|
||||
date-created: 2026-03-14T23:17:58-04:00
|
||||
dg-publish: true
|
||||
|
||||
@@ -7,6 +7,7 @@ tags:
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/timestamped
|
||||
- occupational/takeoff
|
||||
dg-publish: true
|
||||
date-created: 2026-03-18T11:31:07-04:00
|
||||
daily: "[[2026-03-18]]"
|
||||
|
||||
@@ -7,6 +7,8 @@ tags:
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/timestamped
|
||||
- occupational
|
||||
- type/minutes
|
||||
dg-publish: true
|
||||
date-created: 2026-03-19T09:00:43-04:00
|
||||
daily: "[[2026-03-19]]"
|
||||
|
||||
@@ -7,6 +7,7 @@ tags:
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/timestamped
|
||||
- occupational
|
||||
daily: "[[2026-03-20]]"
|
||||
date-created: 2026-03-20T09:11:09-04:00
|
||||
dg-publish: true
|
||||
@@ -17,7 +18,9 @@ yearly: "[[2026]]"
|
||||
---
|
||||
# 2026-03-20 09:11:09
|
||||
|
||||
follow-up to [[2026-03-19_09-00-43]]
|
||||
## Pre-Takeoff Email Process
|
||||
|
||||
Follow-up to [[2026-03-19_09-00-43]]
|
||||
|
||||
> [!quote] Josh Ford @ 2026-03-20 09:10 via Outlook
|
||||
> Good Morning, Team,
|
||||
@@ -48,4 +51,4 @@ follow-up to [[2026-03-19_09-00-43]]
|
||||
>
|
||||
> Thanks everyone!
|
||||
|
||||
BPM Task Review scheduled for [[2026-03-25]]
|
||||
BPM Task Review scheduled for [[2026-03-25]]
|
||||
|
||||
@@ -7,6 +7,7 @@ tags:
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/timestamped
|
||||
- topic/estimating
|
||||
dg-publish: true
|
||||
date-created: 2026-03-20T11:05:34-04:00
|
||||
daily: "[[2026-03-20]]"
|
||||
|
||||
@@ -21,7 +21,7 @@ yearly: "[[2026]]"
|
||||
|
||||
[Causal notation](https://en.wikipedia.org/wiki/Causal_notation)
|
||||
may be helpful in illustrating the relationships
|
||||
between the quantities listed in
|
||||
between the quantities listed in:
|
||||
* [[alternating-current]]
|
||||
* [[voltage-drop]]
|
||||
* [[conductor-sizing]]
|
||||
|
||||
@@ -7,6 +7,7 @@ tags:
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/timestamped
|
||||
- topic/hobbies/homelab
|
||||
dg-publish: true
|
||||
date-created: 2026-03-20T13:18:50-04:00
|
||||
daily: "[[2026-03-20]]"
|
||||
|
||||
@@ -8,6 +8,7 @@ tags:
|
||||
- status/draft
|
||||
- type/periodic/timestamped
|
||||
- topic/risk
|
||||
- topic/estimating
|
||||
dg-publish: true
|
||||
date-created: 2026-03-20T13:27:12-04:00
|
||||
daily: "[[2026-03-20]]"
|
||||
|
||||
@@ -7,6 +7,7 @@ tags:
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/timestamped
|
||||
- occupational/takeoff
|
||||
dg-publish: true
|
||||
date-created: 2026-03-20T13:44:59-04:00
|
||||
daily: "[[2026-03-20]]"
|
||||
|
||||
@@ -33,7 +33,6 @@ which can be quite abstract.
|
||||
|
||||
I found the PE's receptivity
|
||||
a pleasant surprise.
|
||||
|
||||
In my experience training estimating,
|
||||
both at Ace and PDI,
|
||||
I have to be _very_ careful with my words
|
||||
|
||||
@@ -7,6 +7,7 @@ tags:
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/timestamped
|
||||
- topic/construction
|
||||
dg-publish: true
|
||||
date-created: 2026-03-24T09:51:24-04:00
|
||||
daily: "[[2026-03-24]]"
|
||||
|
||||
@@ -7,6 +7,7 @@ tags:
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/timestamped
|
||||
- occupational/takeoff
|
||||
dg-publish: true
|
||||
date-created: 2026-03-25T08:14:59-04:00
|
||||
daily: "[[2026-03-25]]"
|
||||
|
||||
@@ -7,6 +7,7 @@ tags:
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/timestamped
|
||||
- occupational
|
||||
dg-publish: true
|
||||
date-created: 2026-03-25T08:55:46-04:00
|
||||
daily: "[[2026-03-25]]"
|
||||
|
||||
@@ -7,6 +7,7 @@ tags:
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/timestamped
|
||||
- topic/estimating
|
||||
dg-publish: true
|
||||
date-created: 2026-03-25T12:53:30-04:00
|
||||
daily: "[[2026-03-25]]"
|
||||
|
||||
@@ -7,6 +7,8 @@ tags:
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/timestamped
|
||||
- occupational
|
||||
- type/minutes
|
||||
dg-publish: true
|
||||
date-created: 2026-03-25T13:00:49-04:00
|
||||
daily: "[[2026-03-25]]"
|
||||
@@ -29,7 +31,8 @@ estimator and senior tasks.
|
||||
|
||||
#### 1. Pre-Takeoff Email
|
||||
|
||||
[[conest-pre-takeoff-email-template]] used correctly.
|
||||
[[conest-pre-takeoff-email-template]] used correctly:
|
||||
[[pdi-pre-takeoff-confirmation]] executed correctly.
|
||||
|
||||
#### 2. Accubid Extension Pricing
|
||||
|
||||
|
||||
@@ -7,6 +7,8 @@ tags:
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/timestamped
|
||||
- occupational
|
||||
- type/minutes
|
||||
dg-publish: true
|
||||
date-created: 2026-03-25T13:17:35-04:00
|
||||
daily: "[[2026-03-25]]"
|
||||
@@ -19,7 +21,8 @@ yearly: "[[2026]]"
|
||||
|
||||
## BPM Tasks Meeting
|
||||
|
||||
Regarding [[conest-pre-takeoff-email-template#Tasks/Quotes Needed for WBS]]:
|
||||
Regarding [[conest-pre-takeoff-email-template#Tasks/Quotes Needed for WBS]]
|
||||
for [[pdi-pre-takeoff-confirmation]]:
|
||||
|
||||
Intent is to reduce WBS turnaround,
|
||||
reduce time spent sitting on WBS's completed
|
||||
|
||||
@@ -20,7 +20,7 @@ to gain access to information prior to making a decision.
|
||||
|
||||
## Example
|
||||
|
||||
Suppose information $I$ is available to a decision maker.
|
||||
Suppose a decision maker has the opportunity to purchase information $I$.
|
||||
Consider these two scenarios:
|
||||
|
||||
1. the decision maker does not purchase the information
|
||||
|
||||
Reference in New Issue
Block a user