vault backup: 2026-03-25

This commit is contained in:
2026-03-25 15:26:47 -04:00
parent cd0c597a7a
commit 1a8d438ec6
27 changed files with 714 additions and 34 deletions
+2 -2
View File
@@ -8,7 +8,7 @@
"enabled": true
},
"weekly": {
"format": "",
"format": "gggg-[w]ww",
"template": "templates/weekly.md",
"folder": "",
"enabled": true
@@ -20,7 +20,7 @@
"enabled": true
},
"quarterly": {
"format": "",
"format": "YYYY-[q]Q",
"template": "templates/quarterly.md",
"folder": "",
"enabled": true
+2
View File
@@ -6,3 +6,5 @@ tags:
- occupational/project
---
# Charlotte South End Hotel
[[2026-03-09_15-50-49|Pre-Takeoff Confirmation]]
+6 -2
View File
@@ -107,11 +107,15 @@ Please confirm you have received this email and respond with any questions or co
### Tasks/Quotes Needed for WBS
%% Delete any completed %%
<!--
Delete any tasks completed.
If all necessary tasks are open or completed:
"No tasks missing."
-->
* Electrical Constructability Review
* Electrical VDC
* Coordination Study
* Coordination Study %% _Design Build:_ Not needed. %%
* DAS Public Safety Raceway Design
<!--
+17
View File
@@ -0,0 +1,17 @@
---
id: 2026-03-25
aliases: []
title: 2026-03-25
tags:
- authorship/original
- destiny/permanent
- status/draft
- type/periodic/daily
dg-publish: true
date-created: 2026-03-25T14:19:40-04:00
weekly: "[[2026-W13]]"
monthly: "[[2026-03]]"
quarterly: "[[2026-Q1]]"
yearly: "[[2026]]"
---
# 2026-03-25
+11 -11
View File
@@ -12,19 +12,19 @@ dg-publish: true
---
# IBC Construction Types
International Building Code (IBC) Section 602: Construction Classification
[[ibc_s0602|IBC Section 602: Construction Classification]]
lists 5 major construction types based on fire ratings/materials.
## 5-Over-1 Construction
"5-over-1" construction denotes a building
with levels of combustible construction
above levels of non-combustible construction.
buildings with two non-combustible levels (5-over-2)
and Type III upper floors (3-over-1)
are also common,
though "5-over-1" denotes the general practice.
> [!info] 5-Over-1 Construction ^5-over-1
>
> "5-over-1" construction denotes a building
> with levels of combustible construction
> above levels of non-combustible construction.
>
> buildings with two non-combustible levels (5-over-2)
> and Type III upper floors (3-over-1)
> are also common,
> though "5-over-1" denotes the general practice.
## Type I: Fire Resistive Non-Combustible
+441
View File
@@ -14,51 +14,492 @@ dg-publish: false
# International Building Code
* [[ibc_ch01|Chapter 1: Scope and Administration]]
* [[ibc_s0101|Section 101: General]]
* [[ibc_s0102|Section 102: Applicability]]
* [[ibc_s0103|Section 103: Department of Building Safety]]
* [[ibc_s0104|Section 104: Duties and Powers of Building Official]]
* [[ibc_s0105|Section 105: Permits]]
* [[ibc_s0106|Section 106: Floor and Roof Design Loads]]
* [[ibc_s0107|Section 107: Submittal Documents]]
* [[ibc_s0108|Section 108: Temporary Structures and Uses]]
* [[ibc_s0109|Section 109: Fees]]
* [[ibc_s0110|Section 110: Inspections]]
* [[ibc_s0111|Section 111: Certificate of Occupancy]]
* [[ibc_s0112|Section 112: Service Utilities]]
* [[ibc_s0113|Section 113: Board of Appeals]]
* [[ibc_s0114|Section 114: Violations]]
* [[ibc_s0115|Section 115: Stop Work Order]]
* [[ibc_s0116|Section 116: Unsafe Structures and Equipment]]
* [[ibc_ch02|Chapter 2: Definitions]]
* [[ibc_s0201|Section 201: General]]
* [[ibc_s0202|Section 202: Definitions]]
* [[ibc_ch03|Chapter 3: Occupancy Classification and Use]]
* [[ibc_s0301|Section 301: Scope]]
* [[ibc_s0302|Section 302: Occupancy Classification and Use Designation]]
* [[ibc_s0303|Section 303: Assembly Group A]]
* [[ibc_s0304|Section 304: Business Group B]]
* [[ibc_s0305|Section 305: Educational Group E]]
* [[ibc_s0306|Section 306: Factory Group F]]
* [[ibc_s0307|Section 307: High-Hazard Group H]]
* [[ibc_s0308|Section 308: Institutional Group I]]
* [[ibc_s0309|Section 309: Mercantile Group M]]
* [[ibc_s0310|Section 310: Residential Group R]]
* [[ibc_s0311|Section 311: Storage Group S]]
* [[ibc_s0312|Section 312: Utility and Miscellaneous Group U]]
* [[ibc_ch04|Chapter 4: Special Detailed Requirements Based on Occupancy and Use]]
* [[ibc_s0401|Section 401: Scope]]
* [[ibc_s0402|Section 402: Covered Mall and Open Mall Buildings]]
* [[ibc_s0403|Section 403: High-Rise Buildings]]
* [[ibc_s0404|Section 404: Atriums]]
* [[ibc_s0405|Section 405: Underground Buildings]]
* [[ibc_s0406|Section 406: Motor-Vehicle-Related Occupancies]]
* [[ibc_s0407|Section 407: Group I-2]]
* [[ibc_s0408|Section 408: Group I-3]]
* [[ibc_s0409|Section 409: Motion Picture Projection Rooms]]
* [[ibc_s0410|Section 410: Stages, Platforms and Technical Production Areas]]
* [[ibc_s0411|Section 411: Special Amusement Buildings]]
* [[ibc_s0412|Section 412: Aircraft-Related Occupancies]]
* [[ibc_s0413|Section 413: Combustible Storage]]
* [[ibc_s0414|Section 414: Hazardous Materials]]
* [[ibc_s0415|Section 415: Groups H-1, H-2, H-3, H-4 and H-5]]
* [[ibc_s0416|Section 416: Spray Application of Flammable Finishes]]
* [[ibc_s0417|Section 417: Drying Rooms]]
* [[ibc_s0418|Section 418: Organic Coatings]]
* [[ibc_s0419|Section 419: Live/Work Units]]
* [[ibc_s0420|Section 420: Groups I-1, R-1, R-2, R-3 and R-4]]
* [[ibc_s0421|Section 421: Hydrogen Fuel Gas Rooms]]
* [[ibc_s0422|Section 422: Ambulatory Care Faciilities]]
* [[ibc_s0423|Section 423: Storm Shelters]]
* [[ibc_s0424|Section 424: Childrens Play Structures]]
* [[ibc_s0425|Section 425: Hyperbaric Facilities]]
* [[ibc_s0426|Section 426: Combustible Dusts, Grain Processing and Storage]]
* [[ibc_s0427|Section 427: Medical Gas Systems]]
* [[ibc_s0428|Section 428: Higher Education Laboratories]]
* [[ibc_ch05|Chapter 5: General Building Heights and Areas]]
* [[ibc_s0501|Section 501: General]]
* [[ibc_s0502|Section 502: Building Address]]
* [[ibc_s0503|Section 503: General Building Height and Area Limitations]]
* [[ibc_s0504|Section 504: Building Height and Number of Stories]]
* [[ibc_s0505|Section 505: Mezzanines and Equipment Platforms]]
* [[ibc_s0506|Section 506: Building Area]]
* [[ibc_s0507|Section 507: Unlimited Area Buildings]]
* [[ibc_s0508|Section 508: Mixed Use and Occupancy]]
* [[ibc_s0509|Section 509: Incidental Uses]]
* [[ibc_s0510|Section 510: Special Provisions]]
* [[ibc_ch06|Chapter 6: Types of Construction]]
* [[ibc_s0601|Section 601: General]]
* [[ibc_s0602|Section 602: Construction Classification]]
* [[ibc_s0603|Section 603: Combustible Material In Types I and Ii Construction]]
* [[ibc_ch07|Chapter 7: Fire and Smoke Protection Features]]
* [[ibc_s0701|Section 701: General]]
* [[ibc_s0702|Section 702: Multiple Use Fire Assemblies]]
* [[ibc_s0703|Section 703: Fire-Resistance Ratings and Fire Tests]]
* [[ibc_s0704|Section 704: Fire-Resistance Rating of Structural Members]]
* [[ibc_s0705|Section 705: Exterior Walls]]
* [[ibc_s0706|Section 706: Fire Walls]]
* [[ibc_s0707|Section 707: Fire Barriers]]
* [[ibc_s0708|Section 708: Fire Partitions]]
* [[ibc_s0709|Section 709: Smoke Barriers]]
* [[ibc_s0710|Section 710: Smoke Partitions]]
* [[ibc_s0711|Section 711: Floor and Roof Assemblies]]
* [[ibc_s0712|Section 712: Vertical Openings]]
* [[ibc_s0713|Section 713: Shaft Enclosures]]
* [[ibc_s0714|Section 714: Penetrations]]
* [[ibc_s0715|Section 715: Fire-Resistant Joint Systems]]
* [[ibc_s0716|Section 716: Opening Protectives]]
* [[ibc_s0717|Section 717: Ducts and Air Transfer Openings]]
* [[ibc_s0718|Section 718: Concealed Spaces]]
* [[ibc_s0719|Section 719: Fire-Resistance Requirements For Plaster]]
* [[ibc_s0720|Section 720: Thermal- and Sound-Insulating Materials]]
* [[ibc_s0721|Section 721: Prescriptive Fire Resistance]]
* [[ibc_s0722|Section 722: Calculated Fire Resistance]]
* [[ibc_ch08|Chapter 8: Interior Finishes]]
* [[ibc_s0801|Section 801: Scope]]
* [[ibc_s0802|Section 802: General]]
* [[ibc_s0803|Section 803: Wall and Ceiling Finishes]]
* [[ibc_s0804|Section 804: Interior Floor Finish]]
* [[ibc_s0805|Section 805: Combustible Materials In Types I and Ii Construction]]
* [[ibc_s0806|Section 806: Decorative Materials and Trim]]
* [[ibc_s0807|Section 807: Insulation]]
* [[ibc_s0808|Section 808: Acoustical Ceiling Systems]]
* [[ibc_ch09|Chapter 9: Fire Protection and Life Safety Systems]]
* [[ibc_s0901|Section 901: General]]
* [[ibc_s0902|Section 902: Fire Pump and Riser Room Size]]
* [[ibc_s0903|Section 903: Automatic Sprinkler Systems]]
* [[ibc_s0904|Section 904: Alternative Automatic Fire-Extinguishing Systems]]
* [[ibc_s0905|Section 905: Standpipe Systems]]
* [[ibc_s0906|Section 906: Portable Fire Extinguishers]]
* [[ibc_s0907|Section 907: Fire Alarm and Detection Systems]]
* [[ibc_s0908|Section 908: Emergency Alarm Systems]]
* [[ibc_s0909|Section 909: Smoke Control Systems]]
* [[ibc_s0910|Section 910: Smoke and Heat Removal]]
* [[ibc_s0911|Section 911: Fire Command Center]]
* [[ibc_s0912|Section 912: Fire Department Connections]]
* [[ibc_s0913|Section 913: Fire Pumps]]
* [[ibc_s0914|Section 914: Emergency Responder Safety Features]]
* [[ibc_s0915|Section 915: Carbon Monoxide Detection]]
* [[ibc_s0916|Section 916: Gas Detection Systems]]
* [[ibc_s0917|Section 917: Mass Notification Systems]]
* [[ibc_s0918|Section 918: Emergency Responder Radio Coverage]]
* [[ibc_ch10|Chapter 10: Means of Egress]]
* [[ibc_s1001|Section 1001: Administration]]
* [[ibc_s1002|Section 1002: Maintenance and Plans]]
* [[ibc_s1003|Section 1003: General Means of Egress]]
* [[ibc_s1004|Section 1004: Occupant Load]]
* [[ibc_s1005|Section 1005: Means of Egress Sizing]]
* [[ibc_s1006|Section 1006: Number of Exits and Exit Access Doorways]]
* [[ibc_s1007|Section 1007: Exit and Exit Access Doorway Configuration]]
* [[ibc_s1008|Section 1008: Means of Egress Illumination]]
* [[ibc_s1009|Section 1009: Accessible Means of Egress]]
* [[ibc_s1010|Section 1010: Doors, Gates and Turnstiles]]
* [[ibc_s1011|Section 1011: Stairways]]
* [[ibc_s1012|Section 1012: Ramps]]
* [[ibc_s1013|Section 1013: Exit Signs]]
* [[ibc_s1014|Section 1014: Handrails]]
* [[ibc_s1015|Section 1015: Guards]]
* [[ibc_s1016|Section 1016: Exit Access]]
* [[ibc_s1017|Section 1017: Exit Access Travel Distance]]
* [[ibc_s1018|Section 1018: Aisles]]
* [[ibc_s1019|Section 1019: Exit Access Stairways and Ramps]]
* [[ibc_s1020|Section 1020: Corridors]]
* [[ibc_s1021|Section 1021: Egress Balconies]]
* [[ibc_s1022|Section 1022: Exits]]
* [[ibc_s1023|Section 1023: Interior Exit Stairways and Ramps]]
* [[ibc_s1024|Section 1024: Exit Passageways]]
* [[ibc_s1025|Section 1025: Luminous Egress Path Markings]]
* [[ibc_s1026|Section 1026: Horizontal Exits]]
* [[ibc_s1027|Section 1027: Exterior Exit Stairways and Ramps]]
* [[ibc_s1028|Section 1028: Exit Discharge]]
* [[ibc_s1029|Section 1029: Assembly]]
* [[ibc_s1030|Section 1030: Emergency Escape and Rescue]]
* [[ibc_ch11|Chapter 11: Accessibility]]
* [[ibc_s1101|Section 1101: General]]
* [[ibc_s1102|Section 1102: Compliance]]
* [[ibc_s1103|Section 1103: Scoping Requirements]]
* [[ibc_s1104|Section 1104: Accessible Route]]
* [[ibc_s1105|Section 1105: Accessible Entrances]]
* [[ibc_s1106|Section 1106: Parking and Passenger Loading Facilities]]
* [[ibc_s1107|Section 1107: Dwelling Units and Sleeping Units]]
* [[ibc_s1108|Section 1108: Special Occupancies]]
* [[ibc_s1109|Section 1109: Other Features and Facilities]]
* [[ibc_s1110|Section 1110: Recreational Facilities]]
* [[ibc_s1111|Section 1111: Signage]]
* [[ibc_ch12|Chapter 12: Interior Environment]]
* [[ibc_s1201|Section 1201: General]]
* [[ibc_s1202|Section 1202: Ventilation]]
* [[ibc_s1203|Section 1203: Temperature Control]]
* [[ibc_s1204|Section 1204: Lighting]]
* [[ibc_s1205|Section 1205: Yards Or Courts]]
* [[ibc_s1206|Section 1206: Sound Transmission]]
* [[ibc_s1207|Section 1207: Interior Space Dimensions]]
* [[ibc_s1208|Section 1208: Access To Unoccupied Spaces]]
* [[ibc_s1209|Section 1209: Toilet and Bathroom Requirements]]
* [[ibc_ch13|Chapter 13: Energy Efficiency]]
* [[ibc_s1301|Section 1301: General]]
* [[ibc_ch14|Chapter 14: Exterior Walls]]
* [[ibc_s1401|Section 1401: General]]
* [[ibc_s1402|Section 1402: Performance Requirements]]
* [[ibc_s1403|Section 1403: Materials]]
* [[ibc_s1404|Section 1404: Installation of Wall Coverings]]
* [[ibc_s1405|Section 1405: Combustible Materials On The Exterior Side of Exterior Walls]]
* [[ibc_s1406|Section 1406: Metal Composite Materials (Mcm)]]
* [[ibc_s1407|Section 1407: Exterior Insulation and Finish Systems (Eifs)]]
* [[ibc_s1408|Section 1408: High-Pressure Decorative Exterior-Grade Compact Laminates (Hpl)]]
* [[ibc_s1409|Section 1409: Plastic Composite Decking]]
* [[ibc_ch15|Chapter 15: Roof Assemblies and Rooftop Structures]]
* [[ibc_s1501|Section 1501: General]]
* [[ibc_s1502|Section 1502: Roof Drainage]]
* [[ibc_s1503|Section 1503: Weather Protection]]
* [[ibc_s1504|Section 1504: Performance Requirements]]
* [[ibc_s1505|Section 1505: Fire Classification]]
* [[ibc_s1506|Section 1506: Materials]]
* [[ibc_s1507|Section 1507: Requirements For Roof Coverings]]
* [[ibc_s1508|Section 1508: Roof Insulation]]
* [[ibc_s1509|Section 1509: Radiant Barriers Installed Above Deck]]
* [[ibc_s1510|Section 1510: Rooftop Structures]]
* [[ibc_s1511|Section 1511: Reroofing]]
* [[ibc_s1512|Section 1512: Photovoltaic Panels and Modules]]
* [[ibc_ch16|Chapter 16: Structural Design]]
* [[ibc_s1601|Section 1601: General]]
* [[ibc_s1602|Section 1602: Notations]]
* [[ibc_s1603|Section 1603: Construction Documents]]
* [[ibc_s1604|Section 1604: General Design Requirements]]
* [[ibc_s1605|Section 1605: Load Combinations]]
* [[ibc_s1606|Section 1606: Dead Loads]]
* [[ibc_s1607|Section 1607: Live Loads]]
* [[ibc_s1608|Section 1608: Snow Loads]]
* [[ibc_s1609|Section 1609: Wind Loads]]
* [[ibc_s1610|Section 1610: Soil Lateral Loads]]
* [[ibc_s1611|Section 1611: Rain Loads]]
* [[ibc_s1612|Section 1612: Flood Loads]]
* [[ibc_s1613|Section 1613: Earthquake Loads]]
* [[ibc_s1614|Section 1614: Atmospheric Ice Loads]]
* [[ibc_s1615|Section 1615: Tsunami Loads]]
* [[ibc_s1616|Section 1616: Structural Integrity]]
* [[ibc_ch17|Chapter 17: Special Inspections and Tests]]
* [[ibc_s1701|Section 1701: General]]
* [[ibc_s1702|Section 1702: New Materials]]
* [[ibc_s1703|Section 1703: Approvals]]
* [[ibc_s1704|Section 1704: Special Inspections and Tests, Contractor Responsibility and Structural Observation]]
* [[ibc_s1705|Section 1705: Required Special Inspections and Tests]]
* [[ibc_s1706|Section 1706: Design Strengths of Materials]]
* [[ibc_s1707|Section 1707: Alternative Test Procedure]]
* [[ibc_s1708|Section 1708: In-Situ Load Tests]]
* [[ibc_s1709|Section 1709: Preconstruction Load Tests]]
* [[ibc_ch18|Chapter 18: Soils and Foundations]]
* [[ibc_s1801|Section 1801: General]]
* [[ibc_s1802|Section 1802: Design Basis]]
* [[ibc_s1803|Section 1803: Geotechnical Investigations]]
* [[ibc_s1804|Section 1804: Excavation, Grading and Fill]]
* [[ibc_s1805|Section 1805: Dampproofing and Waterproofing]]
* [[ibc_s1806|Section 1806: Presumptive Load-Bearing Values of Soils]]
* [[ibc_s1807|Section 1807: Foundation Walls, Retaining Walls and Embedded Posts and Poles]]
* [[ibc_s1808|Section 1808: Foundations]]
* [[ibc_s1809|Section 1809: Shallow Foundations]]
* [[ibc_s1810|Section 1810: Deep Foundations]]
* [[ibc_ch19|Chapter 19: Concrete]]
* [[ibc_s1901|Section 1901: General]]
* [[ibc_s1902|Section 1902: Definitions]]
* [[ibc_s1903|Section 1903: Specifications For Tests and Materials]]
* [[ibc_s1904|Section 1904: Durability Requirements]]
* [[ibc_s1905|Section 1905: Modifications To Aci 318]]
* [[ibc_s1906|Section 1906: Structural Plain Concrete]]
* [[ibc_s1907|Section 1907: Minimum Slab Provisions]]
* [[ibc_s1908|Section 1908: Shotcrete]]
* [[ibc_ch20|Chapter 20: Aluminum]]
* [[ibc_s2001|Section 2001: General]]
* [[ibc_s2002|Section 2002: Materials]]
* [[ibc_ch21|Chapter 21: Masonry]]
* [[ibc_s2101|Section 2101: General]]
* [[ibc_s2102|Section 2102: Notations]]
* [[ibc_s2103|Section 2103: Masonry Construction Materials]]
* [[ibc_s2104|Section 2104: Construction]]
* [[ibc_s2105|Section 2105: Quality Assurance]]
* [[ibc_s2106|Section 2106: Seismic Design]]
* [[ibc_s2107|Section 2107: Allowable Stress Design]]
* [[ibc_s2108|Section 2108: Strength Design of Masonry]]
* [[ibc_s2109|Section 2109: Empirical Design of Adobe Masonry]]
* [[ibc_s2110|Section 2110: Glass Unit Masonry]]
* [[ibc_s2111|Section 2111: Masonry Fireplaces]]
* [[ibc_s2112|Section 2112: Masonry Heaters]]
* [[ibc_s2113|Section 2113: Masonry Chimneys]]
* [[ibc_s2114|Section 2114: Dry-Stack Masonry]]
* [[ibc_ch22|Chapter 22: Steel]]
* [[ibc_s2201|Section 2201: General]]
* [[ibc_s2202|Section 2202: Identification of Steel For Structural Purposes]]
* [[ibc_s2203|Section 2203: Protection of Steel For Structural Purposes]]
* [[ibc_s2204|Section 2204: Connections]]
* [[ibc_s2205|Section 2205: Structural Steel]]
* [[ibc_s2206|Section 2206: Composite Structural Steel and Concrete Structures]]
* [[ibc_s2207|Section 2207: Steel Joists]]
* [[ibc_s2208|Section 2208: Steel Cable Structures]]
* [[ibc_s2209|Section 2209: Steel Storage Racks]]
* [[ibc_s2210|Section 2210: Cold-Formed Steel]]
* [[ibc_s2211|Section 2211: Cold-Formed Steel Light-Frame Construction]]
* [[ibc_ch23|Chapter 23: Wood]]
* [[ibc_s2301|Section 2301: General]]
* [[ibc_s2302|Section 2302: Design Requirements]]
* [[ibc_s2303|Section 2303: Minimum Standards and Quality]]
* [[ibc_s2304|Section 2304: General Construction Requirements]]
* [[ibc_s2305|Section 2305: General Design Requirements For Lateral Force-Resisting Systems]]
* [[ibc_s2306|Section 2306: Allowable Stress Design]]
* [[ibc_s2307|Section 2307: Load and Resistance Factor Design]]
* [[ibc_s2308|Section 2308: Conventional Light-Frame Construction]]
* [[ibc_s2309|Section 2309: Wood Frame Construction Manual]]
* [[ibc_ch24|Chapter 24: Glass and Glazing]]
* [[ibc_s2401|Section 2401: General]]
* [[ibc_s2402|Section 2402: Glazing Replacement]]
* [[ibc_s2403|Section 2403: General Requirements For Glass]]
* [[ibc_s2404|Section 2404: Wind, Snow, Seismic and Dead Loads On Glass]]
* [[ibc_s2405|Section 2405: Sloped Glazing and Skylights]]
* [[ibc_s2406|Section 2406: Safety Glazing]]
* [[ibc_s2407|Section 2407: Glass In Handrails and Guards]]
* [[ibc_s2408|Section 2408: Glazing In Athletic Facilities]]
* [[ibc_s2409|Section 2409: Glass In Walkways, Elevator Hoistways and Elevator Cars]]
* [[ibc_ch25|Chapter 25: Gypsum Board, Gypsum Panel Products and Plaster]]
* [[ibc_s2501|Section 2501: General]]
* [[ibc_s2502|Section 2502: Performance]]
* [[ibc_s2503|Section 2503: Inspection]]
* [[ibc_s2504|Section 2504: Vertical and Horizontal Assemblies]]
* [[ibc_s2505|Section 2505: Shear Wall Construction]]
* [[ibc_s2506|Section 2506: Gypsum Board and Gypsum Panel Product Materials]]
* [[ibc_s2507|Section 2507: Lathing and Plastering]]
* [[ibc_s2508|Section 2508: Gypsum Construction]]
* [[ibc_s2509|Section 2509: Showers and Water Closets]]
* [[ibc_s2510|Section 2510: Lathing and Furring For Cement Plaster (Stucco)]]
* [[ibc_s2511|Section 2511: Interior Plaster]]
* [[ibc_s2512|Section 2512: Exterior Plaster]]
* [[ibc_s2513|Section 2513: Exposed Aggregate Plaster]]
* [[ibc_s2514|Section 2514: Reinforced Gypsum Concrete]]
* [[ibc_ch26|Chapter 26: Plastic]]
* [[ibc_s2601|Section 2601: General]]
* [[ibc_s2602|Section 2602: Finish and Trim]]
* [[ibc_s2603|Section 2603: Foam Plastic Insulation]]
* [[ibc_s2604|Section 2604: Interior Finish and Trim]]
* [[ibc_s2605|Section 2605: Plastic Veneer]]
* [[ibc_s2606|Section 2606: Light-Transmitting Plastics]]
* [[ibc_s2607|Section 2607: Light-Transmitting Plastic Wall Panels]]
* [[ibc_s2608|Section 2608: Light-Transmitting Plastic Glazing]]
* [[ibc_s2609|Section 2609: Light-Transmitting Plastic Roof Panels]]
* [[ibc_s2610|Section 2610: Light-Transmitting Plastic Skylight Glazing]]
* [[ibc_s2611|Section 2611: Light-Transmitting Plastic Interior Signs]]
* [[ibc_s2612|Section 2612: Plastic Composites]]
* [[ibc_s2613|Section 2613: Fiber-Reinforced Polymer]]
* [[ibc_s2614|Section 2614: Reflective Plastic Core Insulation]]
* [[ibc_ch27|Chapter 27: Electrical]]
* [[ibc_s2701|Section 2701: General]]
* [[ibc_s2702|Section 2702: Emergency and Standby Power Systems]]
* [[ibc_ch28|Chapter 28: Mechanical Systems]]
* [[ibc_s2801|Section 2801: General]]
* [[ibc_ch29|Chapter 29: Plumbing Systems]]
* [[ibc_s2901|Section 2901: General]]
* [[ibc_s2902|Section 2902: Minimum Plumbing Facilities]]
* [[ibc_ch30|Chapter 30: Elevators and Conveying Systems]]
* [[ibc_s3001|Section 3001: General]]
* [[ibc_s3002|Section 3002: Hoistway Enclosures]]
* [[ibc_s3003|Section 3003: Emergency Operations]]
* [[ibc_s3004|Section 3004: Conveying Systems]]
* [[ibc_s3005|Section 3005: Machine Rooms]]
* [[ibc_s3006|Section 3006: Elevator Lobbies and Hoistway Opening Protection]]
* [[ibc_s3007|Section 3007: Fire Service Access Elevator]]
* [[ibc_s3008|Section 3008: Occupant Evacuation Elevators]]
* [[ibc_ch31|Chapter 31: Special Construction]]
* [[ibc_s3101|Section 3101: General]]
* [[ibc_s3102|Section 3102: Membrane Structures]]
* [[ibc_s3103|Section 3103: Temporary Structures]]
* [[ibc_s3104|Section 3104: Pedestrian Walkways and Tunnels]]
* [[ibc_s3105|Section 3105: Awnings and Canopies]]
* [[ibc_s3106|Section 3106: Marquees]]
* [[ibc_s3107|Section 3107: Signs]]
* [[ibc_s3108|Section 3108: Telecommunication and Broadcast Towers]]
* [[ibc_s3109|Section 3109: Swimming Pools, Spas and Hot Tubs]]
* [[ibc_s3110|Section 3110: Automatic Vehicular Gates]]
* [[ibc_s3111|Section 3111: Solar Energy Systems]]
* [[ibc_s3112|Section 3112: Greenhouses]]
* [[ibc_s3113|Section 3113: Relocatable Buildings]]
* [[ibc_ch32|Chapter 32: Encroachments into the Public Right-of-Way]]
* [[ibc_s3201|Section 3201: General]]
* [[ibc_s3202|Section 3202: Encroachments]]
* [[ibc_ch33|Chapter 33: Safeguards During Construction]]
* [[ibc_s3301|Section 3301: General]]
* [[ibc_s3302|Section 3302: Construction Safeguards]]
* [[ibc_s3303|Section 3303: Demolition]]
* [[ibc_s3304|Section 3304: Site Work]]
* [[ibc_s3305|Section 3305: Sanitary]]
* [[ibc_s3306|Section 3306: Protection of Pedestrians]]
* [[ibc_s3307|Section 3307: Protection of Adjoining Property]]
* [[ibc_s3308|Section 3308: Temporary Use of Streets, Alleys and Public Property]]
* [[ibc_s3309|Section 3309: Fire Extinguishers]]
* [[ibc_s3310|Section 3310: Means of Egress]]
* [[ibc_s3311|Section 3311: Standpipes]]
* [[ibc_s3312|Section 3312: Automatic Sprinkler System]]
* [[ibc_s3313|Section 3313: Water Supply For Fire Protection]]
* [[ibc_s3314|Section 3314: Fire Watch During Constructon]]
* [[ibc_ch34|Chapter 34: Reserved]]
* [[ibc_ch35|Chapter 35: Referenced Standards]]
* [[ibc_appx-a|Appendix A: Employee Qualifications]]
* [[ibc_sA0101|Section A101: Building Official Qualifications]]
* [[ibc_sA0102|Section A102: Referenced Standards]]
* [[ibc_appx-b|Appendix B: Board of Appeals]]
* [[ibc_sB0101|Section B101: General]]
* [[ibc_appx-c|Appendix C: Group U---Agricultural Buildings]]
* [[ibc_sC0101|Section C101: General]]
* [[ibc_sC0102|Section C102: Allowable Height and Area]]
* [[ibc_sC0103|Section C103: Mixed Occupancies]]
* [[ibc_sC0104|Section C104: Exits]]
* [[ibc_appx-d|Appendix D: Fire Districts]]
* [[ibc_sD0101|Section D101: General]]
* [[ibc_sD0102|Section D102: Building Restrictions]]
* [[ibc_sD0103|Section D103: Changes To Buildings]]
* [[ibc_sD0104|Section D104: Buildings Located Partially In The Fire District]]
* [[ibc_sD0105|Section D105: Exceptions To Restrictions In Fire District]]
* [[ibc_sD0106|Section D106: Referenced Standards]]
* [[ibc_appx-e|Appendix E: Supplementary Accessibility Requirements]]
* [[ibc_sE0101|Section E101: General]]
* [[ibc_sE0102|Section E102: Definitions]]
* [[ibc_sE0103|Section E103: Accessible Route]]
* [[ibc_sE0104|Section E104: Special Occupancies]]
* [[ibc_sE0105|Section E105: Other Features and Facilities]]
* [[ibc_sE0106|Section E106: Telephones]]
* [[ibc_sE0107|Section E107: Signage]]
* [[ibc_sE0108|Section E108: Bus Stops]]
* [[ibc_sE0109|Section E109: Transportation Facilities and Stations]]
* [[ibc_sE0110|Section E110: Airports]]
* [[ibc_sE0111|Section E111: Referenced Standards]]
* [[ibc_appx-f|Appendix F: Rodentproofing]]
* [[ibc_sF0101|Section F101: General]]
* [[ibc_appx-g|Appendix G: Flood-Resistant Construction]]
* [[ibc_sG0101|Section G101: Administration]]
* [[ibc_sG0102|Section G102: Applicability]]
* [[ibc_sG0103|Section G103: Powers and Duties]]
* [[ibc_sG0104|Section G104: Permits]]
* [[ibc_sG0105|Section G105: Variances]]
* [[ibc_sG0201|Section G201: Definitions]]
* [[ibc_sG0301|Section G301: Subdivisions]]
* [[ibc_sG0401|Section G401: Site Improvement]]
* [[ibc_sG0501|Section G501: Manufactured Homes]]
* [[ibc_sG0601|Section G601: Recreational Vehicles]]
* [[ibc_sG0701|Section G701: Tanks]]
* [[ibc_sG0801|Section G801: Other Building Work]]
* [[ibc_sG0901|Section G901: Temporary Structures and Temporary Storage]]
* [[ibc_sG1001|Section G1001: Utility and Miscellaneous Group U]]
* [[ibc_sG1101|Section G1101: Referenced Standards]]
* [[ibc_appx-h|Appendix H: Signs]]
* [[ibc_sH0101|Section H101: General]]
* [[ibc_sH0102|Section H102: Definitions]]
* [[ibc_sH0103|Section H103: Location]]
* [[ibc_sH0104|Section H104: Identification]]
* [[ibc_sH0105|Section H105: Design and Construction]]
* [[ibc_sH0106|Section H106: Electrical]]
* [[ibc_sH0107|Section H107: Combustible Materials]]
* [[ibc_sH0108|Section H108: Animated Devices]]
* [[ibc_sH0109|Section H109: Ground Signs]]
* [[ibc_sH0110|Section H110: Roof Signs]]
* [[ibc_sH0111|Section H111: Wall Signs]]
* [[ibc_sH0112|Section H112: Projecting Signs]]
* [[ibc_sH0113|Section H113: Marquee Signs]]
* [[ibc_sH0114|Section H114: Portable Signs]]
* [[ibc_sH0115|Section H115: Referenced Standards]]
* [[ibc_appx-i|Appendix I: Patio Covers]]
* [[ibc_sI0101|Section I101: General]]
* [[ibc_sI0102|Section I102: Definition]]
* [[ibc_sI0103|Section I103: Exterior Walls and Openings]]
* [[ibc_sI0104|Section I104: Height]]
* [[ibc_sI0105|Section I105: Structural Provisions]]
* [[ibc_appx-j|Appendix J: Grading]]
* [[ibc_sJ0101|Section J101: General]]
* [[ibc_sJ0102|Section J102: Definitions]]
* [[ibc_sJ0103|Section J103: Permits Required]]
* [[ibc_sJ0104|Section J104: Permit Application and Submittals]]
* [[ibc_sJ0105|Section J105: Inspections]]
* [[ibc_sJ0106|Section J106: Excavations]]
* [[ibc_sJ0107|Section J107: Fills]]
* [[ibc_sJ0108|Section J108: Setbacks]]
* [[ibc_sJ0109|Section J109: Drainage and Terracing]]
* [[ibc_sJ0110|Section J110: Erosion Control]]
* [[ibc_sJ0111|Section J111: Referenced Standards]]
* [[ibc_appx-k|Appendix K: Administrative Provisions]]
* [[ibc_sK0101|Section K101: General]]
* [[ibc_sK0102|Section K102: Applicability]]
* [[ibc_sK0103|Section K103: Permits]]
* [[ibc_sK0104|Section K104: Construction Documents]]
* [[ibc_sK0105|Section K105: Alternative Engineered Design]]
* [[ibc_sK0106|Section K106: Required Inspections]]
* [[ibc_sK0107|Section K107: Prefabricated Construction]]
* [[ibc_sK0108|Section K108: Testing]]
* [[ibc_sK0109|Section K109: Reconnection]]
* [[ibc_sK0110|Section K110: Condemning Electrical Systems]]
* [[ibc_sK0111|Section K111: Electrical Provisions]]
* [[ibc_appx-l|Appendix L: Earthquake Recording Instrumentation]]
* [[ibc_sL0101|Section L101: General]]
* [[ibc_appx-m|Appendix M: Tsunami-Generated Flood Hazard]]
* [[ibc_sM0101|Section M101: Refuge Structures For Vertical Evacuation From Tsunami-Generated Flood Hazard]]
* [[ibc_sM0102|Section M102: Referenced Standards]]
* [[ibc_appx-n|Appendix N: Replicable Buildings]]
* [[ibc_sN0101|Section N101: Administration]]
* [[ibc_sN0102|Section N102: Definitions]]
* [[ibc_sN0103|Section N103: Replicable Design Requirements]]
* [[ibc_sN0104|Section N104: Replicable Design Submittal Requirements]]
* [[ibc_sN0105|Section N105: Review and Approval of Replicable Design]]
* [[ibc_sN0106|Section N106: Site-Specific Application of Approved Replicable Design]]
* [[ibc_sN0107|Section N107: Site-Specific Review and Approval of Replicable Design]]
+15
View File
@@ -0,0 +1,15 @@
---
id:
aliases:
- ibc-602
tags:
- authorship/other
- destiny/permanent
- exclude-from-word-count
- status/incomplete
- topic/construction
- type/media/reference
title:
dg-publish: false
---
# Section 602: Construction Classification
+4
View File
@@ -36,3 +36,7 @@ dg-publish: true
1. Takeoff devices as shown throughout the building
2. Takeoff riser conduit as needed
### Devices
Reference [[telecom-takeoff#Devices]].
+1 -1
View File
@@ -187,7 +187,7 @@ dg-publish: false
* [[nfpa-70_760|760 Fire Alarm Systems]]
* [[nfpa-70_770|770 Optical Fiber Cables]]
## Chapter 8 Communications Systems
## Chapter 8 Communications Systems ^ch8
* [[nfpa-70_800|800 General Requirements for Communications Systems]]
* [[nfpa-70_805|805 Communications Circuits]]
+1 -1
View File
@@ -38,7 +38,7 @@ Ensure markup was cleared from previous tabs:
Only if "CIP" is included in Base Bid.
See proposal section "Insurance" if present.
**Modified ($)** <- $\frac{0.136}{100} \times \text{Contract Value}$
**Modified ($)** <- 0.136% of Contract Value
## Selling Price
+3
View File
@@ -66,6 +66,9 @@ Rename lines "ROUGH & TRIM FOREMAN ...":
* **Hours** <- Double months from PDI Systems Life Safety Proposal
(e.g. 2 × "16 Months @ 25%" = 8 Months)
> [!speculation]
> "@ 25%" may denote one week per month.
## Escalation
~~1% per year~~ TODO
+2 -2
View File
@@ -22,8 +22,8 @@ dg-publish: true
* **Notes** <- Quote date
> [!tip]
> PDR fixture quotes are usually broken out by area type.
> It is not necessary to preserve these breakdowns in the estimate.
> PDR fixture quotes are usually broken out by area type,
> buy it is not necessary to preserve this breakdown in the estimate.
> Use the sum total cost in a single Quoted Materials line item.
## Switchgear
+1 -1
View File
@@ -52,7 +52,7 @@ Examples include:
> [!info] Podium
> "Podium" refers to the levels of concrete construction
> below those of wood framing in a dual construction type building;
> the "1" below the "5" in [[ibc-construction-types#5-Over-1 Construction]].
> the "1" below the "5" in [[ibc-construction-types#^5-over-1|5-Over-1 Construction]].
## Commercial
+2 -2
View File
@@ -27,11 +27,11 @@ dg-publish: true
* Scroll through each `Phase`
* Change breakdown of everything in each phase to the proper `Labor Factor`
* Do not move Temp Power (buckets) or site
* Do not move Temp Power (budgets) or site
5. Use the Accubid Extension tab to fill out the "Unit Lbr Calc" tab in the labor plan
6. Select extension view "Phase / Sort Code"
6. Select extension view "Phase, Sort Code"
7. Open `Phase` "UNIT RESIDENTIAL" and "Building - Corridors"
+2 -2
View File
@@ -53,7 +53,7 @@ Use **Trade Price**, delete **Supplier Name**
### Fire Alarm Labor
`F/A CABLE - LABOR ONLY`
`F/A DEVICE - LABOR ONLY`
* `F/A CABLE - LABOR ONLY`
* `F/A DEVICE - LABOR ONLY`
Adjust labor to match PDI Systems quote.
+11 -3
View File
@@ -84,7 +84,8 @@ Alternative
## Telecom Backboard
As shown on plans, only if not excluded in pro
As shown on plans,
only if not excluded in proposal.
1. * `Phase` = "Building - BOH ..."
* `System` = "TC - Telecom Backbone"
@@ -108,7 +109,7 @@ For future use (e.g. fiber)
* **Material Price** = 450.00/C
* **Labor Hours** = 12.00/C
Alternative
_Alternative:_
1. `COMMON ASSEMBLIES`/`TELECOM SYSTEMS`/`INNERDUCT`/`... (GP)`
@@ -123,5 +124,12 @@ Ignore scope shared with [[electrical-takeoff|electrical]].
* .../`SCREWLESS DECORA COVERS UNITS / BOH`
* .../`ROUGH IN ASSY`
If _system_ is included, take off _both_ rough-in and device assemblies
If _system_ is included,
take off _both_ rough-in and device assemblies
in amenity areas.
If rough-in is included,
always provide backboxes and conduit stub-ups for outlets in other than units,
even if qualified as "free-air per code" or similar.[^1]
[^1]: [[2026-03-25_08-14-59#"Free-Air Per Code"]]
+1 -4
View File
@@ -4,6 +4,7 @@ aliases: []
title: 2025-12-17 05:39:??
tags:
- type/periodic/timestamped
- topic/estimating
dg-publish: true
---
# 2025-12-17 05:39:??
@@ -39,7 +40,3 @@ to the conceivably far more broad
> but it is not necessarily [georeferenced](https://en.wikipedia.org/wiki/Georeferenced "Georeferenced"),
> such as in computer-aided design (CAD),
> see [geometric modeling](https://en.wikipedia.org/wiki/Geometric_modeling "Geometric modeling").
### Ambiguity
New Note: [[ambiguity]]
+1 -1
View File
@@ -9,7 +9,7 @@ dg-publish: true
---
# 2025-12-19 10:44:??
This week (2025w51)
[[2025w51|This week]]
William Bonn, as part of [[units-takeoff]] for Howard University East Towers,
used an `Area` "Typical - Unit Balconies" for `Phase` "UNIT - RESIDENTIAL" takeoff.
Our senior Joel Jansen approved of the method.
+2
View File
@@ -4,6 +4,8 @@ aliases: []
title: 2026-01-06 10:57:??
tags:
- type/periodic/timestamped
- topic/estimating
- topic/organization
dg-publish: true
---
# 2026-01-06 10:57:??
+2
View File
@@ -17,6 +17,8 @@ yearly: "[[2026]]"
---
# 2026-03-09 15:50:49
## Pre-Takeoff Confirmation --- Charlotte South End Hotel
%%
Implementation of [[conest-pre-takeoff-email-template]]
for [[charlotte-south-end-hotel]]
+1 -1
View File
@@ -19,7 +19,7 @@ yearly: "[[2026]]"
## Charlotte South End Hotel Spec Interpretation
[[charlotte-south-end-hotel|Charlotte South End Hotel]]
Spec interpretation notes for [[charlotte-south-end-hotel]]
### EMT Fittings
+41
View File
@@ -0,0 +1,41 @@
---
id: 2026-03-25T08:14:59-04:00
aliases: []
title: 2026-03-25 08:14:59
tags:
- authorship/original
- destiny/permanent
- status/draft
- type/periodic/timestamped
dg-publish: true
date-created: 2026-03-25T08:14:59-04:00
daily: "[[2026-03-25]]"
weekly: "[[2026-W13]]"
monthly: "[[2026-03]]"
quarterly: "[[2026-Q1]]"
yearly: "[[2026]]"
---
# 2026-03-25 08:14:59
## "Free-Air Per Code"
Direction for [[telecom-takeoff]] and [[low-voltage-takeoff]]
concerning the proper interpretation of "free-air per code"
as used by [[pdi-estimating#Bid Estimating|Bid]] to qualify our scope.
> [!quote] [[charlotte-south-end-hotel]] Proposal 2025-12-12 Ex. B Notes
> * All Fire Alarm and Low Voltage cabling
> is to \[be\] installed via free-air
> in all areas excepted \[sic.\] by code
Strictly speaking, requirements for communications wiring
(governed by [[nfpa-70_national-electric-code#^ch8|NEC Chapter 8]])
are minimal.
> [!quote] Joel Jansen 2026-03-24 (pp.)
> If rough-in for Telecom or a Low Voltage system is included,
> even if qualified as "free-air per code" or similar,
> always provide backboxes and conduit stub-ups for outlets
> in other than units.
Joel confirmed this direction is not region specific.
+28
View File
@@ -0,0 +1,28 @@
---
id: 2026-03-25T08:55:46-04:00
aliases: []
title: 2026-03-25 08:55:46
tags:
- authorship/original
- destiny/permanent
- status/draft
- type/periodic/timestamped
dg-publish: true
date-created: 2026-03-25T08:55:46-04:00
daily: "[[2026-03-25]]"
weekly: "[[2026-W13]]"
monthly: "[[2026-03]]"
quarterly: "[[2026-Q1]]"
yearly: "[[2026]]"
---
# 2026-03-25 08:55:46
Relevant to [[pdi-accubid-final-price#Material Tax]],
in general and for [[charlotte-south-end-hotel]].
Charlotte, NC combined sales tax is currently 7.25%,
but will increase to 8.25% effective July 1, 2026.[^1]
[^1]: [Spectrum News - Mecklenburg County passes sales tax increase proposal](https://spectrumlocalnews.com/nc/charlotte/news/2025/11/05/sales-tax-increase-proposal-passes)
Project start date according to the Approved PDI Labor Plan is 2025-05-04.
+26
View File
@@ -0,0 +1,26 @@
---
id: 2026-03-25T12:53:30-04:00
aliases: []
title: 2026-03-25 12:53:30
tags:
- authorship/original
- destiny/permanent
- status/draft
- type/periodic/timestamped
dg-publish: true
date-created: 2026-03-25T12:53:30-04:00
daily: "[[2026-03-25]]"
weekly: "[[2026-W13]]"
monthly: "[[2026-03]]"
quarterly: "[[2026-Q1]]"
yearly: "[[2026]]"
---
# 2026-03-25 12:53:30
Regarding [[statistical-modeling-for-construction-estimating#Average Distance Given Area]]:
I'd like to look further into this topic.
Multi-family has several factors that make run distances more consistent than the kitchen sink roster I was used to.
Area per unit falls within a predictable range.
Floors are long and narrow to ensure all units have windows.
+42
View File
@@ -0,0 +1,42 @@
---
id: 2026-03-25T13:00:49-04:00
aliases: []
title: 2026-03-25 13:00:49
tags:
- authorship/original
- destiny/permanent
- status/draft
- type/periodic/timestamped
dg-publish: true
date-created: 2026-03-25T13:00:49-04:00
daily: "[[2026-03-25]]"
weekly: "[[2026-W13]]"
monthly: "[[2026-03]]"
quarterly: "[[2026-Q1]]"
yearly: "[[2026]]"
---
# 2026-03-25 13:00:49
## ConEst Scorecard Meeting
Score by Senior ConEst Estimator team.
Sample jobs selected from WBS's sent that quarter.
Intent is equal weight between
estimator and senior tasks.
### Scorecard Checkpoints
#### 1. Pre-Takeoff Email
[[conest-pre-takeoff-email-template]] used correctly.
#### 2. Accubid Extension Pricing
PDI used as vendor as required.
Quotes requested, received for any specialty items.
Temporary Items include sort codes, part numbers
#### 3. WBS Presentation
+48
View File
@@ -0,0 +1,48 @@
---
id: 2026-03-25T13:17:35-04:00
aliases: []
title: 2026-03-25 13:17:35
tags:
- authorship/original
- destiny/permanent
- status/draft
- type/periodic/timestamped
dg-publish: true
date-created: 2026-03-25T13:17:35-04:00
daily: "[[2026-03-25]]"
weekly: "[[2026-W13]]"
monthly: "[[2026-03]]"
quarterly: "[[2026-Q1]]"
yearly: "[[2026]]"
---
# 2026-03-25 13:17:35
## BPM Tasks Meeting
Regarding [[conest-pre-takeoff-email-template#Tasks/Quotes Needed for WBS]]:
Intent is to reduce WBS turnaround,
reduce time spent sitting on WBS's completed
except for pending tasks.
A task is "missing"
if it is necessary to complete the WBS
and it is not already open (or completed) in BPM.
* **BPM > Bid History:** Tasks within the current Bid Round
* **BPM > Tasks:** Tasks outside of Bid Round
Tasks > 1. Open Tasks
Tasks > 2. Completed Tasks
* Constructability Review
* Coordination Studies
* DAS Pathway Design
If all necessary tasks are open or completed:
"No tasks missing."
Prompted by Joel,
Josh clarified that "... Raceway Design" tasks
are not necessary for Low Voltage, Telecom systems,
only Public Safety DAS.
+1 -1
View File
@@ -31,7 +31,7 @@ you should seek clarification.
## Example Wiring Method Selection
Below is an example Wiring Method Selection
for a [[ibc-construction-types#5-Over-1 Construction|podium]] construction.
for a [[ibc-construction-types#^5-over-1|podium]] construction.
> [!example]
> Wire Material: