vault backup: 2026-03-25
This commit is contained in:
@@ -22,8 +22,8 @@ dg-publish: true
|
||||
* **Notes** <- Quote date
|
||||
|
||||
> [!tip]
|
||||
> PDR fixture quotes are usually broken out by area type.
|
||||
> It is not necessary to preserve these breakdowns in the estimate.
|
||||
> PDR fixture quotes are usually broken out by area type,
|
||||
> buy it is not necessary to preserve this breakdown in the estimate.
|
||||
> Use the sum total cost in a single Quoted Materials line item.
|
||||
|
||||
## Switchgear
|
||||
|
||||
Reference in New Issue
Block a user