title: 2025-12-17 05:39:??
tags:
- type/periodic/timestamped
- topic/estimating
dg-publish: true
---
# 2025-12-17 05:39:??
@@ -39,7 +40,3 @@ to the conceivably far more broad
> but it is not necessarily [georeferenced](https://en.wikipedia.org/wiki/Georeferenced "Georeferenced"),
> such as in computer-aided design (CAD),
> see [geometric modeling](https://en.wikipedia.org/wiki/Geometric_modeling "Geometric modeling").
### Ambiguity
New Note: [[ambiguity]]
+1 -1
View File
@@ -9,7 +9,7 @@ dg-publish: true
---
# 2025-12-19 10:44:??
This week (2025w51)
[[2025w51|This week]]
William Bonn, as part of [[units-takeoff]] for Howard University East Towers,
used an `Area` "Typical - Unit Balconies" for `Phase` "UNIT - RESIDENTIAL" takeoff.
Our senior Joel Jansen approved of the method.
+2
View File
@@ -4,6 +4,8 @@ aliases: []
title: 2026-01-06 10:57:??
tags:
- type/periodic/timestamped
- topic/estimating
- topic/organization
dg-publish: true
---
# 2026-01-06 10:57:??
+2
View File
@@ -17,6 +17,8 @@ yearly: "[[2026]]"
---
# 2026-03-09 15:50:49
## Pre-Takeoff Confirmation --- Charlotte South End Hotel
%%
Implementation of [[conest-pre-takeoff-email-template]]
for [[charlotte-south-end-hotel]]
+1 -1
View File
@@ -19,7 +19,7 @@ yearly: "[[2026]]"
## Charlotte South End Hotel Spec Interpretation
[[charlotte-south-end-hotel|Charlotte South End Hotel]]
Spec interpretation notes for [[charlotte-south-end-hotel]]
### EMT Fittings
+41
View File
@@ -0,0 +1,41 @@
---
id: 2026-03-25T08:14:59-04:00
aliases: []
title: 2026-03-25 08:14:59
tags:
- authorship/original
- destiny/permanent
- status/draft
- type/periodic/timestamped
dg-publish: true
date-created: 2026-03-25T08:14:59-04:00
daily: "[[2026-03-25]]"
weekly: "[[2026-W13]]"
monthly: "[[2026-03]]"
quarterly: "[[2026-Q1]]"
yearly: "[[2026]]"
---
# 2026-03-25 08:14:59
## "Free-Air Per Code"
Direction for [[telecom-takeoff]] and [[low-voltage-takeoff]]
concerning the proper interpretation of "free-air per code"
as used by [[pdi-estimating#Bid Estimating|Bid]] to qualify our scope.
> [!quote] [[charlotte-south-end-hotel]] Proposal 2025-12-12 Ex. B Notes
> * All Fire Alarm and Low Voltage cabling
> is to \[be\] installed via free-air
> in all areas excepted \[sic.\] by code
Strictly speaking, requirements for communications wiring
(governed by [[nfpa-70_national-electric-code#^ch8|NEC Chapter 8]])
are minimal.
> [!quote] Joel Jansen 2026-03-24 (pp.)
> If rough-in for Telecom or a Low Voltage system is included,
> even if qualified as "free-air per code" or similar,
> always provide backboxes and conduit stub-ups for outlets
> in other than units.
Joel confirmed this direction is not region specific.
+28
View File
@@ -0,0 +1,28 @@
---
id: 2026-03-25T08:55:46-04:00
aliases: []
title: 2026-03-25 08:55:46
tags:
- authorship/original
- destiny/permanent
- status/draft
- type/periodic/timestamped
dg-publish: true
date-created: 2026-03-25T08:55:46-04:00
daily: "[[2026-03-25]]"
weekly: "[[2026-W13]]"
monthly: "[[2026-03]]"
quarterly: "[[2026-Q1]]"
yearly: "[[2026]]"
---
# 2026-03-25 08:55:46
Relevant to [[pdi-accubid-final-price#Material Tax]],
in general and for [[charlotte-south-end-hotel]].
Charlotte, NC combined sales tax is currently 7.25%,
but will increase to 8.25% effective July 1, 2026.[^1]
[^1]: [Spectrum News - Mecklenburg County passes sales tax increase proposal](https://spectrumlocalnews.com/nc/charlotte/news/2025/11/05/sales-tax-increase-proposal-passes)
Project start date according to the Approved PDI Labor Plan is 2025-05-04.
+26
View File
@@ -0,0 +1,26 @@
---
id: 2026-03-25T12:53:30-04:00
aliases: []
title: 2026-03-25 12:53:30
tags:
- authorship/original
- destiny/permanent
- status/draft
- type/periodic/timestamped
dg-publish: true
date-created: 2026-03-25T12:53:30-04:00
daily: "[[2026-03-25]]"
weekly: "[[2026-W13]]"
monthly: "[[2026-03]]"
quarterly: "[[2026-Q1]]"
yearly: "[[2026]]"
---
# 2026-03-25 12:53:30
Regarding [[statistical-modeling-for-construction-estimating#Average Distance Given Area]]:
I'd like to look further into this topic.
Multi-family has several factors that make run distances more consistent than the kitchen sink roster I was used to.
Area per unit falls within a predictable range.
Floors are long and narrow to ensure all units have windows.
+42
View File
@@ -0,0 +1,42 @@
---
id: 2026-03-25T13:00:49-04:00
aliases: []
title: 2026-03-25 13:00:49
tags:
- authorship/original
- destiny/permanent
- status/draft
- type/periodic/timestamped
dg-publish: true
date-created: 2026-03-25T13:00:49-04:00
daily: "[[2026-03-25]]"
weekly: "[[2026-W13]]"
monthly: "[[2026-03]]"
quarterly: "[[2026-Q1]]"
yearly: "[[2026]]"
---
# 2026-03-25 13:00:49
## ConEst Scorecard Meeting
Score by Senior ConEst Estimator team.
Sample jobs selected from WBS's sent that quarter.
Intent is equal weight between
estimator and senior tasks.
### Scorecard Checkpoints
#### 1. Pre-Takeoff Email
[[conest-pre-takeoff-email-template]] used correctly.
#### 2. Accubid Extension Pricing
PDI used as vendor as required.
Quotes requested, received for any specialty items.
Temporary Items include sort codes, part numbers
#### 3. WBS Presentation
+48
View File
@@ -0,0 +1,48 @@
---
id: 2026-03-25T13:17:35-04:00
aliases: []
title: 2026-03-25 13:17:35
tags:
- authorship/original
- destiny/permanent
- status/draft
- type/periodic/timestamped
dg-publish: true
date-created: 2026-03-25T13:17:35-04:00
daily: "[[2026-03-25]]"
weekly: "[[2026-W13]]"
monthly: "[[2026-03]]"
quarterly: "[[2026-Q1]]"
yearly: "[[2026]]"
---
# 2026-03-25 13:17:35
## BPM Tasks Meeting
Regarding [[conest-pre-takeoff-email-template#Tasks/Quotes Needed for WBS]]:
Intent is to reduce WBS turnaround,
reduce time spent sitting on WBS's completed
except for pending tasks.
A task is "missing"
if it is necessary to complete the WBS
and it is not already open (or completed) in BPM.
* **BPM > Bid History:** Tasks within the current Bid Round
* **BPM > Tasks:** Tasks outside of Bid Round
Tasks > 1. Open Tasks
Tasks > 2. Completed Tasks
* Constructability Review
* Coordination Studies
* DAS Pathway Design
If all necessary tasks are open or completed:
"No tasks missing."
Prompted by Joel,
Josh clarified that "... Raceway Design" tasks
are not necessary for Low Voltage, Telecom systems,
only Public Safety DAS.