vault backup: 2026-03-25
This commit is contained in:
@@ -0,0 +1,41 @@
|
||||
---
|
||||
id: 2026-03-25T08:14:59-04:00
|
||||
aliases: []
|
||||
title: 2026-03-25 08:14:59
|
||||
tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/timestamped
|
||||
dg-publish: true
|
||||
date-created: 2026-03-25T08:14:59-04:00
|
||||
daily: "[[2026-03-25]]"
|
||||
weekly: "[[2026-W13]]"
|
||||
monthly: "[[2026-03]]"
|
||||
quarterly: "[[2026-Q1]]"
|
||||
yearly: "[[2026]]"
|
||||
---
|
||||
# 2026-03-25 08:14:59
|
||||
|
||||
## "Free-Air Per Code"
|
||||
|
||||
Direction for [[telecom-takeoff]] and [[low-voltage-takeoff]]
|
||||
concerning the proper interpretation of "free-air per code"
|
||||
as used by [[pdi-estimating#Bid Estimating|Bid]] to qualify our scope.
|
||||
|
||||
> [!quote] [[charlotte-south-end-hotel]] Proposal 2025-12-12 Ex. B Notes
|
||||
> * All Fire Alarm and Low Voltage cabling
|
||||
> is to \[be\] installed via free-air
|
||||
> in all areas excepted \[sic.\] by code
|
||||
|
||||
Strictly speaking, requirements for communications wiring
|
||||
(governed by [[nfpa-70_national-electric-code#^ch8|NEC Chapter 8]])
|
||||
are minimal.
|
||||
|
||||
> [!quote] Joel Jansen 2026-03-24 (pp.)
|
||||
> If rough-in for Telecom or a Low Voltage system is included,
|
||||
> even if qualified as "free-air per code" or similar,
|
||||
> always provide backboxes and conduit stub-ups for outlets
|
||||
> in other than units.
|
||||
|
||||
Joel confirmed this direction is not region specific.
|
||||
Reference in New Issue
Block a user