vault backup: 2026-03-25

This commit is contained in:
2026-03-25 15:26:47 -04:00
parent cd0c597a7a
commit 1a8d438ec6
27 changed files with 714 additions and 34 deletions
+2 -2
View File
@@ -8,7 +8,7 @@
"enabled": true "enabled": true
}, },
"weekly": { "weekly": {
"format": "", "format": "gggg-[w]ww",
"template": "templates/weekly.md", "template": "templates/weekly.md",
"folder": "", "folder": "",
"enabled": true "enabled": true
@@ -20,7 +20,7 @@
"enabled": true "enabled": true
}, },
"quarterly": { "quarterly": {
"format": "", "format": "YYYY-[q]Q",
"template": "templates/quarterly.md", "template": "templates/quarterly.md",
"folder": "", "folder": "",
"enabled": true "enabled": true
+2
View File
@@ -6,3 +6,5 @@ tags:
- occupational/project - occupational/project
--- ---
# Charlotte South End Hotel # Charlotte South End Hotel
[[2026-03-09_15-50-49|Pre-Takeoff Confirmation]]
+6 -2
View File
@@ -107,11 +107,15 @@ Please confirm you have received this email and respond with any questions or co
### Tasks/Quotes Needed for WBS ### Tasks/Quotes Needed for WBS
%% Delete any completed %% <!--
Delete any tasks completed.
If all necessary tasks are open or completed:
"No tasks missing."
-->
* Electrical Constructability Review * Electrical Constructability Review
* Electrical VDC * Electrical VDC
* Coordination Study * Coordination Study %% _Design Build:_ Not needed. %%
* DAS Public Safety Raceway Design * DAS Public Safety Raceway Design
<!-- <!--
+17
View File
@@ -0,0 +1,17 @@
---
id: 2026-03-25
aliases: []
title: 2026-03-25
tags:
- authorship/original
- destiny/permanent
- status/draft
- type/periodic/daily
dg-publish: true
date-created: 2026-03-25T14:19:40-04:00
weekly: "[[2026-W13]]"
monthly: "[[2026-03]]"
quarterly: "[[2026-Q1]]"
yearly: "[[2026]]"
---
# 2026-03-25
+11 -11
View File
@@ -12,19 +12,19 @@ dg-publish: true
--- ---
# IBC Construction Types # IBC Construction Types
International Building Code (IBC) Section 602: Construction Classification [[ibc_s0602|IBC Section 602: Construction Classification]]
lists 5 major construction types based on fire ratings/materials. lists 5 major construction types based on fire ratings/materials.
## 5-Over-1 Construction > [!info] 5-Over-1 Construction ^5-over-1
>
"5-over-1" construction denotes a building > "5-over-1" construction denotes a building
with levels of combustible construction > with levels of combustible construction
above levels of non-combustible construction. > above levels of non-combustible construction.
>
buildings with two non-combustible levels (5-over-2) > buildings with two non-combustible levels (5-over-2)
and Type III upper floors (3-over-1) > and Type III upper floors (3-over-1)
are also common, > are also common,
though "5-over-1" denotes the general practice. > though "5-over-1" denotes the general practice.
## Type I: Fire Resistive Non-Combustible ## Type I: Fire Resistive Non-Combustible
+441
View File
@@ -14,51 +14,492 @@ dg-publish: false
# International Building Code # International Building Code
* [[ibc_ch01|Chapter 1: Scope and Administration]] * [[ibc_ch01|Chapter 1: Scope and Administration]]
* [[ibc_s0101|Section 101: General]]
* [[ibc_s0102|Section 102: Applicability]]
* [[ibc_s0103|Section 103: Department of Building Safety]]
* [[ibc_s0104|Section 104: Duties and Powers of Building Official]]
* [[ibc_s0105|Section 105: Permits]]
* [[ibc_s0106|Section 106: Floor and Roof Design Loads]]
* [[ibc_s0107|Section 107: Submittal Documents]]
* [[ibc_s0108|Section 108: Temporary Structures and Uses]]
* [[ibc_s0109|Section 109: Fees]]
* [[ibc_s0110|Section 110: Inspections]]
* [[ibc_s0111|Section 111: Certificate of Occupancy]]
* [[ibc_s0112|Section 112: Service Utilities]]
* [[ibc_s0113|Section 113: Board of Appeals]]
* [[ibc_s0114|Section 114: Violations]]
* [[ibc_s0115|Section 115: Stop Work Order]]
* [[ibc_s0116|Section 116: Unsafe Structures and Equipment]]
* [[ibc_ch02|Chapter 2: Definitions]] * [[ibc_ch02|Chapter 2: Definitions]]
* [[ibc_s0201|Section 201: General]]
* [[ibc_s0202|Section 202: Definitions]]
* [[ibc_ch03|Chapter 3: Occupancy Classification and Use]] * [[ibc_ch03|Chapter 3: Occupancy Classification and Use]]
* [[ibc_s0301|Section 301: Scope]]
* [[ibc_s0302|Section 302: Occupancy Classification and Use Designation]]
* [[ibc_s0303|Section 303: Assembly Group A]]
* [[ibc_s0304|Section 304: Business Group B]]
* [[ibc_s0305|Section 305: Educational Group E]]
* [[ibc_s0306|Section 306: Factory Group F]]
* [[ibc_s0307|Section 307: High-Hazard Group H]]
* [[ibc_s0308|Section 308: Institutional Group I]]
* [[ibc_s0309|Section 309: Mercantile Group M]]
* [[ibc_s0310|Section 310: Residential Group R]]
* [[ibc_s0311|Section 311: Storage Group S]]
* [[ibc_s0312|Section 312: Utility and Miscellaneous Group U]]
* [[ibc_ch04|Chapter 4: Special Detailed Requirements Based on Occupancy and Use]] * [[ibc_ch04|Chapter 4: Special Detailed Requirements Based on Occupancy and Use]]
* [[ibc_s0401|Section 401: Scope]]
* [[ibc_s0402|Section 402: Covered Mall and Open Mall Buildings]]
* [[ibc_s0403|Section 403: High-Rise Buildings]]
* [[ibc_s0404|Section 404: Atriums]]
* [[ibc_s0405|Section 405: Underground Buildings]]
* [[ibc_s0406|Section 406: Motor-Vehicle-Related Occupancies]]
* [[ibc_s0407|Section 407: Group I-2]]
* [[ibc_s0408|Section 408: Group I-3]]
* [[ibc_s0409|Section 409: Motion Picture Projection Rooms]]
* [[ibc_s0410|Section 410: Stages, Platforms and Technical Production Areas]]
* [[ibc_s0411|Section 411: Special Amusement Buildings]]
* [[ibc_s0412|Section 412: Aircraft-Related Occupancies]]
* [[ibc_s0413|Section 413: Combustible Storage]]
* [[ibc_s0414|Section 414: Hazardous Materials]]
* [[ibc_s0415|Section 415: Groups H-1, H-2, H-3, H-4 and H-5]]
* [[ibc_s0416|Section 416: Spray Application of Flammable Finishes]]
* [[ibc_s0417|Section 417: Drying Rooms]]
* [[ibc_s0418|Section 418: Organic Coatings]]
* [[ibc_s0419|Section 419: Live/Work Units]]
* [[ibc_s0420|Section 420: Groups I-1, R-1, R-2, R-3 and R-4]]
* [[ibc_s0421|Section 421: Hydrogen Fuel Gas Rooms]]
* [[ibc_s0422|Section 422: Ambulatory Care Faciilities]]
* [[ibc_s0423|Section 423: Storm Shelters]]
* [[ibc_s0424|Section 424: Childrens Play Structures]]
* [[ibc_s0425|Section 425: Hyperbaric Facilities]]
* [[ibc_s0426|Section 426: Combustible Dusts, Grain Processing and Storage]]
* [[ibc_s0427|Section 427: Medical Gas Systems]]
* [[ibc_s0428|Section 428: Higher Education Laboratories]]
* [[ibc_ch05|Chapter 5: General Building Heights and Areas]] * [[ibc_ch05|Chapter 5: General Building Heights and Areas]]
* [[ibc_s0501|Section 501: General]]
* [[ibc_s0502|Section 502: Building Address]]
* [[ibc_s0503|Section 503: General Building Height and Area Limitations]]
* [[ibc_s0504|Section 504: Building Height and Number of Stories]]
* [[ibc_s0505|Section 505: Mezzanines and Equipment Platforms]]
* [[ibc_s0506|Section 506: Building Area]]
* [[ibc_s0507|Section 507: Unlimited Area Buildings]]
* [[ibc_s0508|Section 508: Mixed Use and Occupancy]]
* [[ibc_s0509|Section 509: Incidental Uses]]
* [[ibc_s0510|Section 510: Special Provisions]]
* [[ibc_ch06|Chapter 6: Types of Construction]] * [[ibc_ch06|Chapter 6: Types of Construction]]
* [[ibc_s0601|Section 601: General]]
* [[ibc_s0602|Section 602: Construction Classification]]
* [[ibc_s0603|Section 603: Combustible Material In Types I and Ii Construction]]
* [[ibc_ch07|Chapter 7: Fire and Smoke Protection Features]] * [[ibc_ch07|Chapter 7: Fire and Smoke Protection Features]]
* [[ibc_s0701|Section 701: General]]
* [[ibc_s0702|Section 702: Multiple Use Fire Assemblies]]
* [[ibc_s0703|Section 703: Fire-Resistance Ratings and Fire Tests]]
* [[ibc_s0704|Section 704: Fire-Resistance Rating of Structural Members]]
* [[ibc_s0705|Section 705: Exterior Walls]]
* [[ibc_s0706|Section 706: Fire Walls]]
* [[ibc_s0707|Section 707: Fire Barriers]]
* [[ibc_s0708|Section 708: Fire Partitions]]
* [[ibc_s0709|Section 709: Smoke Barriers]]
* [[ibc_s0710|Section 710: Smoke Partitions]]
* [[ibc_s0711|Section 711: Floor and Roof Assemblies]]
* [[ibc_s0712|Section 712: Vertical Openings]]
* [[ibc_s0713|Section 713: Shaft Enclosures]]
* [[ibc_s0714|Section 714: Penetrations]]
* [[ibc_s0715|Section 715: Fire-Resistant Joint Systems]]
* [[ibc_s0716|Section 716: Opening Protectives]]
* [[ibc_s0717|Section 717: Ducts and Air Transfer Openings]]
* [[ibc_s0718|Section 718: Concealed Spaces]]
* [[ibc_s0719|Section 719: Fire-Resistance Requirements For Plaster]]
* [[ibc_s0720|Section 720: Thermal- and Sound-Insulating Materials]]
* [[ibc_s0721|Section 721: Prescriptive Fire Resistance]]
* [[ibc_s0722|Section 722: Calculated Fire Resistance]]
* [[ibc_ch08|Chapter 8: Interior Finishes]] * [[ibc_ch08|Chapter 8: Interior Finishes]]
* [[ibc_s0801|Section 801: Scope]]
* [[ibc_s0802|Section 802: General]]
* [[ibc_s0803|Section 803: Wall and Ceiling Finishes]]
* [[ibc_s0804|Section 804: Interior Floor Finish]]
* [[ibc_s0805|Section 805: Combustible Materials In Types I and Ii Construction]]
* [[ibc_s0806|Section 806: Decorative Materials and Trim]]
* [[ibc_s0807|Section 807: Insulation]]
* [[ibc_s0808|Section 808: Acoustical Ceiling Systems]]
* [[ibc_ch09|Chapter 9: Fire Protection and Life Safety Systems]] * [[ibc_ch09|Chapter 9: Fire Protection and Life Safety Systems]]
* [[ibc_s0901|Section 901: General]]
* [[ibc_s0902|Section 902: Fire Pump and Riser Room Size]]
* [[ibc_s0903|Section 903: Automatic Sprinkler Systems]]
* [[ibc_s0904|Section 904: Alternative Automatic Fire-Extinguishing Systems]]
* [[ibc_s0905|Section 905: Standpipe Systems]]
* [[ibc_s0906|Section 906: Portable Fire Extinguishers]]
* [[ibc_s0907|Section 907: Fire Alarm and Detection Systems]]
* [[ibc_s0908|Section 908: Emergency Alarm Systems]]
* [[ibc_s0909|Section 909: Smoke Control Systems]]
* [[ibc_s0910|Section 910: Smoke and Heat Removal]]
* [[ibc_s0911|Section 911: Fire Command Center]]
* [[ibc_s0912|Section 912: Fire Department Connections]]
* [[ibc_s0913|Section 913: Fire Pumps]]
* [[ibc_s0914|Section 914: Emergency Responder Safety Features]]
* [[ibc_s0915|Section 915: Carbon Monoxide Detection]]
* [[ibc_s0916|Section 916: Gas Detection Systems]]
* [[ibc_s0917|Section 917: Mass Notification Systems]]
* [[ibc_s0918|Section 918: Emergency Responder Radio Coverage]]
* [[ibc_ch10|Chapter 10: Means of Egress]] * [[ibc_ch10|Chapter 10: Means of Egress]]
* [[ibc_s1001|Section 1001: Administration]]
* [[ibc_s1002|Section 1002: Maintenance and Plans]]
* [[ibc_s1003|Section 1003: General Means of Egress]]
* [[ibc_s1004|Section 1004: Occupant Load]]
* [[ibc_s1005|Section 1005: Means of Egress Sizing]]
* [[ibc_s1006|Section 1006: Number of Exits and Exit Access Doorways]]
* [[ibc_s1007|Section 1007: Exit and Exit Access Doorway Configuration]]
* [[ibc_s1008|Section 1008: Means of Egress Illumination]]
* [[ibc_s1009|Section 1009: Accessible Means of Egress]]
* [[ibc_s1010|Section 1010: Doors, Gates and Turnstiles]]
* [[ibc_s1011|Section 1011: Stairways]]
* [[ibc_s1012|Section 1012: Ramps]]
* [[ibc_s1013|Section 1013: Exit Signs]]
* [[ibc_s1014|Section 1014: Handrails]]
* [[ibc_s1015|Section 1015: Guards]]
* [[ibc_s1016|Section 1016: Exit Access]]
* [[ibc_s1017|Section 1017: Exit Access Travel Distance]]
* [[ibc_s1018|Section 1018: Aisles]]
* [[ibc_s1019|Section 1019: Exit Access Stairways and Ramps]]
* [[ibc_s1020|Section 1020: Corridors]]
* [[ibc_s1021|Section 1021: Egress Balconies]]
* [[ibc_s1022|Section 1022: Exits]]
* [[ibc_s1023|Section 1023: Interior Exit Stairways and Ramps]]
* [[ibc_s1024|Section 1024: Exit Passageways]]
* [[ibc_s1025|Section 1025: Luminous Egress Path Markings]]
* [[ibc_s1026|Section 1026: Horizontal Exits]]
* [[ibc_s1027|Section 1027: Exterior Exit Stairways and Ramps]]
* [[ibc_s1028|Section 1028: Exit Discharge]]
* [[ibc_s1029|Section 1029: Assembly]]
* [[ibc_s1030|Section 1030: Emergency Escape and Rescue]]
* [[ibc_ch11|Chapter 11: Accessibility]] * [[ibc_ch11|Chapter 11: Accessibility]]
* [[ibc_s1101|Section 1101: General]]
* [[ibc_s1102|Section 1102: Compliance]]
* [[ibc_s1103|Section 1103: Scoping Requirements]]
* [[ibc_s1104|Section 1104: Accessible Route]]
* [[ibc_s1105|Section 1105: Accessible Entrances]]
* [[ibc_s1106|Section 1106: Parking and Passenger Loading Facilities]]
* [[ibc_s1107|Section 1107: Dwelling Units and Sleeping Units]]
* [[ibc_s1108|Section 1108: Special Occupancies]]
* [[ibc_s1109|Section 1109: Other Features and Facilities]]
* [[ibc_s1110|Section 1110: Recreational Facilities]]
* [[ibc_s1111|Section 1111: Signage]]
* [[ibc_ch12|Chapter 12: Interior Environment]] * [[ibc_ch12|Chapter 12: Interior Environment]]
* [[ibc_s1201|Section 1201: General]]
* [[ibc_s1202|Section 1202: Ventilation]]
* [[ibc_s1203|Section 1203: Temperature Control]]
* [[ibc_s1204|Section 1204: Lighting]]
* [[ibc_s1205|Section 1205: Yards Or Courts]]
* [[ibc_s1206|Section 1206: Sound Transmission]]
* [[ibc_s1207|Section 1207: Interior Space Dimensions]]
* [[ibc_s1208|Section 1208: Access To Unoccupied Spaces]]
* [[ibc_s1209|Section 1209: Toilet and Bathroom Requirements]]
* [[ibc_ch13|Chapter 13: Energy Efficiency]] * [[ibc_ch13|Chapter 13: Energy Efficiency]]
* [[ibc_s1301|Section 1301: General]]
* [[ibc_ch14|Chapter 14: Exterior Walls]] * [[ibc_ch14|Chapter 14: Exterior Walls]]
* [[ibc_s1401|Section 1401: General]]
* [[ibc_s1402|Section 1402: Performance Requirements]]
* [[ibc_s1403|Section 1403: Materials]]
* [[ibc_s1404|Section 1404: Installation of Wall Coverings]]
* [[ibc_s1405|Section 1405: Combustible Materials On The Exterior Side of Exterior Walls]]
* [[ibc_s1406|Section 1406: Metal Composite Materials (Mcm)]]
* [[ibc_s1407|Section 1407: Exterior Insulation and Finish Systems (Eifs)]]
* [[ibc_s1408|Section 1408: High-Pressure Decorative Exterior-Grade Compact Laminates (Hpl)]]
* [[ibc_s1409|Section 1409: Plastic Composite Decking]]
* [[ibc_ch15|Chapter 15: Roof Assemblies and Rooftop Structures]] * [[ibc_ch15|Chapter 15: Roof Assemblies and Rooftop Structures]]
* [[ibc_s1501|Section 1501: General]]
* [[ibc_s1502|Section 1502: Roof Drainage]]
* [[ibc_s1503|Section 1503: Weather Protection]]
* [[ibc_s1504|Section 1504: Performance Requirements]]
* [[ibc_s1505|Section 1505: Fire Classification]]
* [[ibc_s1506|Section 1506: Materials]]
* [[ibc_s1507|Section 1507: Requirements For Roof Coverings]]
* [[ibc_s1508|Section 1508: Roof Insulation]]
* [[ibc_s1509|Section 1509: Radiant Barriers Installed Above Deck]]
* [[ibc_s1510|Section 1510: Rooftop Structures]]
* [[ibc_s1511|Section 1511: Reroofing]]
* [[ibc_s1512|Section 1512: Photovoltaic Panels and Modules]]
* [[ibc_ch16|Chapter 16: Structural Design]] * [[ibc_ch16|Chapter 16: Structural Design]]
* [[ibc_s1601|Section 1601: General]]
* [[ibc_s1602|Section 1602: Notations]]
* [[ibc_s1603|Section 1603: Construction Documents]]
* [[ibc_s1604|Section 1604: General Design Requirements]]
* [[ibc_s1605|Section 1605: Load Combinations]]
* [[ibc_s1606|Section 1606: Dead Loads]]
* [[ibc_s1607|Section 1607: Live Loads]]
* [[ibc_s1608|Section 1608: Snow Loads]]
* [[ibc_s1609|Section 1609: Wind Loads]]
* [[ibc_s1610|Section 1610: Soil Lateral Loads]]
* [[ibc_s1611|Section 1611: Rain Loads]]
* [[ibc_s1612|Section 1612: Flood Loads]]
* [[ibc_s1613|Section 1613: Earthquake Loads]]
* [[ibc_s1614|Section 1614: Atmospheric Ice Loads]]
* [[ibc_s1615|Section 1615: Tsunami Loads]]
* [[ibc_s1616|Section 1616: Structural Integrity]]
* [[ibc_ch17|Chapter 17: Special Inspections and Tests]] * [[ibc_ch17|Chapter 17: Special Inspections and Tests]]
* [[ibc_s1701|Section 1701: General]]
* [[ibc_s1702|Section 1702: New Materials]]
* [[ibc_s1703|Section 1703: Approvals]]
* [[ibc_s1704|Section 1704: Special Inspections and Tests, Contractor Responsibility and Structural Observation]]
* [[ibc_s1705|Section 1705: Required Special Inspections and Tests]]
* [[ibc_s1706|Section 1706: Design Strengths of Materials]]
* [[ibc_s1707|Section 1707: Alternative Test Procedure]]
* [[ibc_s1708|Section 1708: In-Situ Load Tests]]
* [[ibc_s1709|Section 1709: Preconstruction Load Tests]]
* [[ibc_ch18|Chapter 18: Soils and Foundations]] * [[ibc_ch18|Chapter 18: Soils and Foundations]]
* [[ibc_s1801|Section 1801: General]]
* [[ibc_s1802|Section 1802: Design Basis]]
* [[ibc_s1803|Section 1803: Geotechnical Investigations]]
* [[ibc_s1804|Section 1804: Excavation, Grading and Fill]]
* [[ibc_s1805|Section 1805: Dampproofing and Waterproofing]]
* [[ibc_s1806|Section 1806: Presumptive Load-Bearing Values of Soils]]
* [[ibc_s1807|Section 1807: Foundation Walls, Retaining Walls and Embedded Posts and Poles]]
* [[ibc_s1808|Section 1808: Foundations]]
* [[ibc_s1809|Section 1809: Shallow Foundations]]
* [[ibc_s1810|Section 1810: Deep Foundations]]
* [[ibc_ch19|Chapter 19: Concrete]] * [[ibc_ch19|Chapter 19: Concrete]]
* [[ibc_s1901|Section 1901: General]]
* [[ibc_s1902|Section 1902: Definitions]]
* [[ibc_s1903|Section 1903: Specifications For Tests and Materials]]
* [[ibc_s1904|Section 1904: Durability Requirements]]
* [[ibc_s1905|Section 1905: Modifications To Aci 318]]
* [[ibc_s1906|Section 1906: Structural Plain Concrete]]
* [[ibc_s1907|Section 1907: Minimum Slab Provisions]]
* [[ibc_s1908|Section 1908: Shotcrete]]
* [[ibc_ch20|Chapter 20: Aluminum]] * [[ibc_ch20|Chapter 20: Aluminum]]
* [[ibc_s2001|Section 2001: General]]
* [[ibc_s2002|Section 2002: Materials]]
* [[ibc_ch21|Chapter 21: Masonry]] * [[ibc_ch21|Chapter 21: Masonry]]
* [[ibc_s2101|Section 2101: General]]
* [[ibc_s2102|Section 2102: Notations]]
* [[ibc_s2103|Section 2103: Masonry Construction Materials]]
* [[ibc_s2104|Section 2104: Construction]]
* [[ibc_s2105|Section 2105: Quality Assurance]]
* [[ibc_s2106|Section 2106: Seismic Design]]
* [[ibc_s2107|Section 2107: Allowable Stress Design]]
* [[ibc_s2108|Section 2108: Strength Design of Masonry]]
* [[ibc_s2109|Section 2109: Empirical Design of Adobe Masonry]]
* [[ibc_s2110|Section 2110: Glass Unit Masonry]]
* [[ibc_s2111|Section 2111: Masonry Fireplaces]]
* [[ibc_s2112|Section 2112: Masonry Heaters]]
* [[ibc_s2113|Section 2113: Masonry Chimneys]]
* [[ibc_s2114|Section 2114: Dry-Stack Masonry]]
* [[ibc_ch22|Chapter 22: Steel]] * [[ibc_ch22|Chapter 22: Steel]]
* [[ibc_s2201|Section 2201: General]]
* [[ibc_s2202|Section 2202: Identification of Steel For Structural Purposes]]
* [[ibc_s2203|Section 2203: Protection of Steel For Structural Purposes]]
* [[ibc_s2204|Section 2204: Connections]]
* [[ibc_s2205|Section 2205: Structural Steel]]
* [[ibc_s2206|Section 2206: Composite Structural Steel and Concrete Structures]]
* [[ibc_s2207|Section 2207: Steel Joists]]
* [[ibc_s2208|Section 2208: Steel Cable Structures]]
* [[ibc_s2209|Section 2209: Steel Storage Racks]]
* [[ibc_s2210|Section 2210: Cold-Formed Steel]]
* [[ibc_s2211|Section 2211: Cold-Formed Steel Light-Frame Construction]]
* [[ibc_ch23|Chapter 23: Wood]] * [[ibc_ch23|Chapter 23: Wood]]
* [[ibc_s2301|Section 2301: General]]
* [[ibc_s2302|Section 2302: Design Requirements]]
* [[ibc_s2303|Section 2303: Minimum Standards and Quality]]
* [[ibc_s2304|Section 2304: General Construction Requirements]]
* [[ibc_s2305|Section 2305: General Design Requirements For Lateral Force-Resisting Systems]]
* [[ibc_s2306|Section 2306: Allowable Stress Design]]
* [[ibc_s2307|Section 2307: Load and Resistance Factor Design]]
* [[ibc_s2308|Section 2308: Conventional Light-Frame Construction]]
* [[ibc_s2309|Section 2309: Wood Frame Construction Manual]]
* [[ibc_ch24|Chapter 24: Glass and Glazing]] * [[ibc_ch24|Chapter 24: Glass and Glazing]]
* [[ibc_s2401|Section 2401: General]]
* [[ibc_s2402|Section 2402: Glazing Replacement]]
* [[ibc_s2403|Section 2403: General Requirements For Glass]]
* [[ibc_s2404|Section 2404: Wind, Snow, Seismic and Dead Loads On Glass]]
* [[ibc_s2405|Section 2405: Sloped Glazing and Skylights]]
* [[ibc_s2406|Section 2406: Safety Glazing]]
* [[ibc_s2407|Section 2407: Glass In Handrails and Guards]]
* [[ibc_s2408|Section 2408: Glazing In Athletic Facilities]]
* [[ibc_s2409|Section 2409: Glass In Walkways, Elevator Hoistways and Elevator Cars]]
* [[ibc_ch25|Chapter 25: Gypsum Board, Gypsum Panel Products and Plaster]] * [[ibc_ch25|Chapter 25: Gypsum Board, Gypsum Panel Products and Plaster]]
* [[ibc_s2501|Section 2501: General]]
* [[ibc_s2502|Section 2502: Performance]]
* [[ibc_s2503|Section 2503: Inspection]]
* [[ibc_s2504|Section 2504: Vertical and Horizontal Assemblies]]
* [[ibc_s2505|Section 2505: Shear Wall Construction]]
* [[ibc_s2506|Section 2506: Gypsum Board and Gypsum Panel Product Materials]]
* [[ibc_s2507|Section 2507: Lathing and Plastering]]
* [[ibc_s2508|Section 2508: Gypsum Construction]]
* [[ibc_s2509|Section 2509: Showers and Water Closets]]
* [[ibc_s2510|Section 2510: Lathing and Furring For Cement Plaster (Stucco)]]
* [[ibc_s2511|Section 2511: Interior Plaster]]
* [[ibc_s2512|Section 2512: Exterior Plaster]]
* [[ibc_s2513|Section 2513: Exposed Aggregate Plaster]]
* [[ibc_s2514|Section 2514: Reinforced Gypsum Concrete]]
* [[ibc_ch26|Chapter 26: Plastic]] * [[ibc_ch26|Chapter 26: Plastic]]
* [[ibc_s2601|Section 2601: General]]
* [[ibc_s2602|Section 2602: Finish and Trim]]
* [[ibc_s2603|Section 2603: Foam Plastic Insulation]]
* [[ibc_s2604|Section 2604: Interior Finish and Trim]]
* [[ibc_s2605|Section 2605: Plastic Veneer]]
* [[ibc_s2606|Section 2606: Light-Transmitting Plastics]]
* [[ibc_s2607|Section 2607: Light-Transmitting Plastic Wall Panels]]
* [[ibc_s2608|Section 2608: Light-Transmitting Plastic Glazing]]
* [[ibc_s2609|Section 2609: Light-Transmitting Plastic Roof Panels]]
* [[ibc_s2610|Section 2610: Light-Transmitting Plastic Skylight Glazing]]
* [[ibc_s2611|Section 2611: Light-Transmitting Plastic Interior Signs]]
* [[ibc_s2612|Section 2612: Plastic Composites]]
* [[ibc_s2613|Section 2613: Fiber-Reinforced Polymer]]
* [[ibc_s2614|Section 2614: Reflective Plastic Core Insulation]]
* [[ibc_ch27|Chapter 27: Electrical]] * [[ibc_ch27|Chapter 27: Electrical]]
* [[ibc_s2701|Section 2701: General]]
* [[ibc_s2702|Section 2702: Emergency and Standby Power Systems]]
* [[ibc_ch28|Chapter 28: Mechanical Systems]] * [[ibc_ch28|Chapter 28: Mechanical Systems]]
* [[ibc_s2801|Section 2801: General]]
* [[ibc_ch29|Chapter 29: Plumbing Systems]] * [[ibc_ch29|Chapter 29: Plumbing Systems]]
* [[ibc_s2901|Section 2901: General]]
* [[ibc_s2902|Section 2902: Minimum Plumbing Facilities]]
* [[ibc_ch30|Chapter 30: Elevators and Conveying Systems]] * [[ibc_ch30|Chapter 30: Elevators and Conveying Systems]]
* [[ibc_s3001|Section 3001: General]]
* [[ibc_s3002|Section 3002: Hoistway Enclosures]]
* [[ibc_s3003|Section 3003: Emergency Operations]]
* [[ibc_s3004|Section 3004: Conveying Systems]]
* [[ibc_s3005|Section 3005: Machine Rooms]]
* [[ibc_s3006|Section 3006: Elevator Lobbies and Hoistway Opening Protection]]
* [[ibc_s3007|Section 3007: Fire Service Access Elevator]]
* [[ibc_s3008|Section 3008: Occupant Evacuation Elevators]]
* [[ibc_ch31|Chapter 31: Special Construction]] * [[ibc_ch31|Chapter 31: Special Construction]]
* [[ibc_s3101|Section 3101: General]]
* [[ibc_s3102|Section 3102: Membrane Structures]]
* [[ibc_s3103|Section 3103: Temporary Structures]]
* [[ibc_s3104|Section 3104: Pedestrian Walkways and Tunnels]]
* [[ibc_s3105|Section 3105: Awnings and Canopies]]
* [[ibc_s3106|Section 3106: Marquees]]
* [[ibc_s3107|Section 3107: Signs]]
* [[ibc_s3108|Section 3108: Telecommunication and Broadcast Towers]]
* [[ibc_s3109|Section 3109: Swimming Pools, Spas and Hot Tubs]]
* [[ibc_s3110|Section 3110: Automatic Vehicular Gates]]
* [[ibc_s3111|Section 3111: Solar Energy Systems]]
* [[ibc_s3112|Section 3112: Greenhouses]]
* [[ibc_s3113|Section 3113: Relocatable Buildings]]
* [[ibc_ch32|Chapter 32: Encroachments into the Public Right-of-Way]] * [[ibc_ch32|Chapter 32: Encroachments into the Public Right-of-Way]]
* [[ibc_s3201|Section 3201: General]]
* [[ibc_s3202|Section 3202: Encroachments]]
* [[ibc_ch33|Chapter 33: Safeguards During Construction]] * [[ibc_ch33|Chapter 33: Safeguards During Construction]]
* [[ibc_s3301|Section 3301: General]]
* [[ibc_s3302|Section 3302: Construction Safeguards]]
* [[ibc_s3303|Section 3303: Demolition]]
* [[ibc_s3304|Section 3304: Site Work]]
* [[ibc_s3305|Section 3305: Sanitary]]
* [[ibc_s3306|Section 3306: Protection of Pedestrians]]
* [[ibc_s3307|Section 3307: Protection of Adjoining Property]]
* [[ibc_s3308|Section 3308: Temporary Use of Streets, Alleys and Public Property]]
* [[ibc_s3309|Section 3309: Fire Extinguishers]]
* [[ibc_s3310|Section 3310: Means of Egress]]
* [[ibc_s3311|Section 3311: Standpipes]]
* [[ibc_s3312|Section 3312: Automatic Sprinkler System]]
* [[ibc_s3313|Section 3313: Water Supply For Fire Protection]]
* [[ibc_s3314|Section 3314: Fire Watch During Constructon]]
* [[ibc_ch34|Chapter 34: Reserved]] * [[ibc_ch34|Chapter 34: Reserved]]
* [[ibc_ch35|Chapter 35: Referenced Standards]] * [[ibc_ch35|Chapter 35: Referenced Standards]]
* [[ibc_appx-a|Appendix A: Employee Qualifications]] * [[ibc_appx-a|Appendix A: Employee Qualifications]]
* [[ibc_sA0101|Section A101: Building Official Qualifications]]
* [[ibc_sA0102|Section A102: Referenced Standards]]
* [[ibc_appx-b|Appendix B: Board of Appeals]] * [[ibc_appx-b|Appendix B: Board of Appeals]]
* [[ibc_sB0101|Section B101: General]]
* [[ibc_appx-c|Appendix C: Group U---Agricultural Buildings]] * [[ibc_appx-c|Appendix C: Group U---Agricultural Buildings]]
* [[ibc_sC0101|Section C101: General]]
* [[ibc_sC0102|Section C102: Allowable Height and Area]]
* [[ibc_sC0103|Section C103: Mixed Occupancies]]
* [[ibc_sC0104|Section C104: Exits]]
* [[ibc_appx-d|Appendix D: Fire Districts]] * [[ibc_appx-d|Appendix D: Fire Districts]]
* [[ibc_sD0101|Section D101: General]]
* [[ibc_sD0102|Section D102: Building Restrictions]]
* [[ibc_sD0103|Section D103: Changes To Buildings]]
* [[ibc_sD0104|Section D104: Buildings Located Partially In The Fire District]]
* [[ibc_sD0105|Section D105: Exceptions To Restrictions In Fire District]]
* [[ibc_sD0106|Section D106: Referenced Standards]]
* [[ibc_appx-e|Appendix E: Supplementary Accessibility Requirements]] * [[ibc_appx-e|Appendix E: Supplementary Accessibility Requirements]]
* [[ibc_sE0101|Section E101: General]]
* [[ibc_sE0102|Section E102: Definitions]]
* [[ibc_sE0103|Section E103: Accessible Route]]
* [[ibc_sE0104|Section E104: Special Occupancies]]
* [[ibc_sE0105|Section E105: Other Features and Facilities]]
* [[ibc_sE0106|Section E106: Telephones]]
* [[ibc_sE0107|Section E107: Signage]]
* [[ibc_sE0108|Section E108: Bus Stops]]
* [[ibc_sE0109|Section E109: Transportation Facilities and Stations]]
* [[ibc_sE0110|Section E110: Airports]]
* [[ibc_sE0111|Section E111: Referenced Standards]]
* [[ibc_appx-f|Appendix F: Rodentproofing]] * [[ibc_appx-f|Appendix F: Rodentproofing]]
* [[ibc_sF0101|Section F101: General]]
* [[ibc_appx-g|Appendix G: Flood-Resistant Construction]] * [[ibc_appx-g|Appendix G: Flood-Resistant Construction]]
* [[ibc_sG0101|Section G101: Administration]]
* [[ibc_sG0102|Section G102: Applicability]]
* [[ibc_sG0103|Section G103: Powers and Duties]]
* [[ibc_sG0104|Section G104: Permits]]
* [[ibc_sG0105|Section G105: Variances]]
* [[ibc_sG0201|Section G201: Definitions]]
* [[ibc_sG0301|Section G301: Subdivisions]]
* [[ibc_sG0401|Section G401: Site Improvement]]
* [[ibc_sG0501|Section G501: Manufactured Homes]]
* [[ibc_sG0601|Section G601: Recreational Vehicles]]
* [[ibc_sG0701|Section G701: Tanks]]
* [[ibc_sG0801|Section G801: Other Building Work]]
* [[ibc_sG0901|Section G901: Temporary Structures and Temporary Storage]]
* [[ibc_sG1001|Section G1001: Utility and Miscellaneous Group U]]
* [[ibc_sG1101|Section G1101: Referenced Standards]]
* [[ibc_appx-h|Appendix H: Signs]] * [[ibc_appx-h|Appendix H: Signs]]
* [[ibc_sH0101|Section H101: General]]
* [[ibc_sH0102|Section H102: Definitions]]
* [[ibc_sH0103|Section H103: Location]]
* [[ibc_sH0104|Section H104: Identification]]
* [[ibc_sH0105|Section H105: Design and Construction]]
* [[ibc_sH0106|Section H106: Electrical]]
* [[ibc_sH0107|Section H107: Combustible Materials]]
* [[ibc_sH0108|Section H108: Animated Devices]]
* [[ibc_sH0109|Section H109: Ground Signs]]
* [[ibc_sH0110|Section H110: Roof Signs]]
* [[ibc_sH0111|Section H111: Wall Signs]]
* [[ibc_sH0112|Section H112: Projecting Signs]]
* [[ibc_sH0113|Section H113: Marquee Signs]]
* [[ibc_sH0114|Section H114: Portable Signs]]
* [[ibc_sH0115|Section H115: Referenced Standards]]
* [[ibc_appx-i|Appendix I: Patio Covers]] * [[ibc_appx-i|Appendix I: Patio Covers]]
* [[ibc_sI0101|Section I101: General]]
* [[ibc_sI0102|Section I102: Definition]]
* [[ibc_sI0103|Section I103: Exterior Walls and Openings]]
* [[ibc_sI0104|Section I104: Height]]
* [[ibc_sI0105|Section I105: Structural Provisions]]
* [[ibc_appx-j|Appendix J: Grading]] * [[ibc_appx-j|Appendix J: Grading]]
* [[ibc_sJ0101|Section J101: General]]
* [[ibc_sJ0102|Section J102: Definitions]]
* [[ibc_sJ0103|Section J103: Permits Required]]
* [[ibc_sJ0104|Section J104: Permit Application and Submittals]]
* [[ibc_sJ0105|Section J105: Inspections]]
* [[ibc_sJ0106|Section J106: Excavations]]
* [[ibc_sJ0107|Section J107: Fills]]
* [[ibc_sJ0108|Section J108: Setbacks]]
* [[ibc_sJ0109|Section J109: Drainage and Terracing]]
* [[ibc_sJ0110|Section J110: Erosion Control]]
* [[ibc_sJ0111|Section J111: Referenced Standards]]
* [[ibc_appx-k|Appendix K: Administrative Provisions]] * [[ibc_appx-k|Appendix K: Administrative Provisions]]
* [[ibc_sK0101|Section K101: General]]
* [[ibc_sK0102|Section K102: Applicability]]
* [[ibc_sK0103|Section K103: Permits]]
* [[ibc_sK0104|Section K104: Construction Documents]]
* [[ibc_sK0105|Section K105: Alternative Engineered Design]]
* [[ibc_sK0106|Section K106: Required Inspections]]
* [[ibc_sK0107|Section K107: Prefabricated Construction]]
* [[ibc_sK0108|Section K108: Testing]]
* [[ibc_sK0109|Section K109: Reconnection]]
* [[ibc_sK0110|Section K110: Condemning Electrical Systems]]
* [[ibc_sK0111|Section K111: Electrical Provisions]]
* [[ibc_appx-l|Appendix L: Earthquake Recording Instrumentation]] * [[ibc_appx-l|Appendix L: Earthquake Recording Instrumentation]]
* [[ibc_sL0101|Section L101: General]]
* [[ibc_appx-m|Appendix M: Tsunami-Generated Flood Hazard]] * [[ibc_appx-m|Appendix M: Tsunami-Generated Flood Hazard]]
* [[ibc_sM0101|Section M101: Refuge Structures For Vertical Evacuation From Tsunami-Generated Flood Hazard]]
* [[ibc_sM0102|Section M102: Referenced Standards]]
* [[ibc_appx-n|Appendix N: Replicable Buildings]] * [[ibc_appx-n|Appendix N: Replicable Buildings]]
* [[ibc_sN0101|Section N101: Administration]]
* [[ibc_sN0102|Section N102: Definitions]]
* [[ibc_sN0103|Section N103: Replicable Design Requirements]]
* [[ibc_sN0104|Section N104: Replicable Design Submittal Requirements]]
* [[ibc_sN0105|Section N105: Review and Approval of Replicable Design]]
* [[ibc_sN0106|Section N106: Site-Specific Application of Approved Replicable Design]]
* [[ibc_sN0107|Section N107: Site-Specific Review and Approval of Replicable Design]]
+15
View File
@@ -0,0 +1,15 @@
---
id:
aliases:
- ibc-602
tags:
- authorship/other
- destiny/permanent
- exclude-from-word-count
- status/incomplete
- topic/construction
- type/media/reference
title:
dg-publish: false
---
# Section 602: Construction Classification
+4
View File
@@ -36,3 +36,7 @@ dg-publish: true
1. Takeoff devices as shown throughout the building 1. Takeoff devices as shown throughout the building
2. Takeoff riser conduit as needed 2. Takeoff riser conduit as needed
### Devices
Reference [[telecom-takeoff#Devices]].
+1 -1
View File
@@ -187,7 +187,7 @@ dg-publish: false
* [[nfpa-70_760|760 Fire Alarm Systems]] * [[nfpa-70_760|760 Fire Alarm Systems]]
* [[nfpa-70_770|770 Optical Fiber Cables]] * [[nfpa-70_770|770 Optical Fiber Cables]]
## Chapter 8 Communications Systems ## Chapter 8 Communications Systems ^ch8
* [[nfpa-70_800|800 General Requirements for Communications Systems]] * [[nfpa-70_800|800 General Requirements for Communications Systems]]
* [[nfpa-70_805|805 Communications Circuits]] * [[nfpa-70_805|805 Communications Circuits]]
+1 -1
View File
@@ -38,7 +38,7 @@ Ensure markup was cleared from previous tabs:
Only if "CIP" is included in Base Bid. Only if "CIP" is included in Base Bid.
See proposal section "Insurance" if present. See proposal section "Insurance" if present.
**Modified ($)** <- $\frac{0.136}{100} \times \text{Contract Value}$ **Modified ($)** <- 0.136% of Contract Value
## Selling Price ## Selling Price
+3
View File
@@ -66,6 +66,9 @@ Rename lines "ROUGH & TRIM FOREMAN ...":
* **Hours** <- Double months from PDI Systems Life Safety Proposal * **Hours** <- Double months from PDI Systems Life Safety Proposal
(e.g. 2 × "16 Months @ 25%" = 8 Months) (e.g. 2 × "16 Months @ 25%" = 8 Months)
> [!speculation]
> "@ 25%" may denote one week per month.
## Escalation ## Escalation
~~1% per year~~ TODO ~~1% per year~~ TODO
+2 -2
View File
@@ -22,8 +22,8 @@ dg-publish: true
* **Notes** <- Quote date * **Notes** <- Quote date
> [!tip] > [!tip]
> PDR fixture quotes are usually broken out by area type. > PDR fixture quotes are usually broken out by area type,
> It is not necessary to preserve these breakdowns in the estimate. > buy it is not necessary to preserve this breakdown in the estimate.
> Use the sum total cost in a single Quoted Materials line item. > Use the sum total cost in a single Quoted Materials line item.
## Switchgear ## Switchgear
+1 -1
View File
@@ -52,7 +52,7 @@ Examples include:
> [!info] Podium > [!info] Podium
> "Podium" refers to the levels of concrete construction > "Podium" refers to the levels of concrete construction
> below those of wood framing in a dual construction type building; > below those of wood framing in a dual construction type building;
> the "1" below the "5" in [[ibc-construction-types#5-Over-1 Construction]]. > the "1" below the "5" in [[ibc-construction-types#^5-over-1|5-Over-1 Construction]].
## Commercial ## Commercial
+2 -2
View File
@@ -27,11 +27,11 @@ dg-publish: true
* Scroll through each `Phase` * Scroll through each `Phase`
* Change breakdown of everything in each phase to the proper `Labor Factor` * Change breakdown of everything in each phase to the proper `Labor Factor`
* Do not move Temp Power (buckets) or site * Do not move Temp Power (budgets) or site
5. Use the Accubid Extension tab to fill out the "Unit Lbr Calc" tab in the labor plan 5. Use the Accubid Extension tab to fill out the "Unit Lbr Calc" tab in the labor plan
6. Select extension view "Phase / Sort Code" 6. Select extension view "Phase, Sort Code"
7. Open `Phase` "UNIT RESIDENTIAL" and "Building - Corridors" 7. Open `Phase` "UNIT RESIDENTIAL" and "Building - Corridors"
+2 -2
View File
@@ -53,7 +53,7 @@ Use **Trade Price**, delete **Supplier Name**
### Fire Alarm Labor ### Fire Alarm Labor
`F/A CABLE - LABOR ONLY` * `F/A CABLE - LABOR ONLY`
`F/A DEVICE - LABOR ONLY` * `F/A DEVICE - LABOR ONLY`
Adjust labor to match PDI Systems quote. Adjust labor to match PDI Systems quote.
+11 -3
View File
@@ -84,7 +84,8 @@ Alternative
## Telecom Backboard ## Telecom Backboard
As shown on plans, only if not excluded in pro As shown on plans,
only if not excluded in proposal.
1. * `Phase` = "Building - BOH ..." 1. * `Phase` = "Building - BOH ..."
* `System` = "TC - Telecom Backbone" * `System` = "TC - Telecom Backbone"
@@ -108,7 +109,7 @@ For future use (e.g. fiber)
* **Material Price** = 450.00/C * **Material Price** = 450.00/C
* **Labor Hours** = 12.00/C * **Labor Hours** = 12.00/C
Alternative _Alternative:_
1. `COMMON ASSEMBLIES`/`TELECOM SYSTEMS`/`INNERDUCT`/`... (GP)` 1. `COMMON ASSEMBLIES`/`TELECOM SYSTEMS`/`INNERDUCT`/`... (GP)`
@@ -123,5 +124,12 @@ Ignore scope shared with [[electrical-takeoff|electrical]].
* .../`SCREWLESS DECORA COVERS UNITS / BOH` * .../`SCREWLESS DECORA COVERS UNITS / BOH`
* .../`ROUGH IN ASSY` * .../`ROUGH IN ASSY`
If _system_ is included, take off _both_ rough-in and device assemblies If _system_ is included,
take off _both_ rough-in and device assemblies
in amenity areas. in amenity areas.
If rough-in is included,
always provide backboxes and conduit stub-ups for outlets in other than units,
even if qualified as "free-air per code" or similar.[^1]
[^1]: [[2026-03-25_08-14-59#"Free-Air Per Code"]]
+1 -4
View File
@@ -4,6 +4,7 @@ aliases: []
title: 2025-12-17 05:39:?? title: 2025-12-17 05:39:??
tags: tags:
- type/periodic/timestamped - type/periodic/timestamped
- topic/estimating
dg-publish: true dg-publish: true
--- ---
# 2025-12-17 05:39:?? # 2025-12-17 05:39:??
@@ -39,7 +40,3 @@ to the conceivably far more broad
> but it is not necessarily [georeferenced](https://en.wikipedia.org/wiki/Georeferenced "Georeferenced"), > but it is not necessarily [georeferenced](https://en.wikipedia.org/wiki/Georeferenced "Georeferenced"),
> such as in computer-aided design (CAD), > such as in computer-aided design (CAD),
> see [geometric modeling](https://en.wikipedia.org/wiki/Geometric_modeling "Geometric modeling"). > see [geometric modeling](https://en.wikipedia.org/wiki/Geometric_modeling "Geometric modeling").
### Ambiguity
New Note: [[ambiguity]]
+1 -1
View File
@@ -9,7 +9,7 @@ dg-publish: true
--- ---
# 2025-12-19 10:44:?? # 2025-12-19 10:44:??
This week (2025w51) [[2025w51|This week]]
William Bonn, as part of [[units-takeoff]] for Howard University East Towers, William Bonn, as part of [[units-takeoff]] for Howard University East Towers,
used an `Area` "Typical - Unit Balconies" for `Phase` "UNIT - RESIDENTIAL" takeoff. used an `Area` "Typical - Unit Balconies" for `Phase` "UNIT - RESIDENTIAL" takeoff.
Our senior Joel Jansen approved of the method. Our senior Joel Jansen approved of the method.
+2
View File
@@ -4,6 +4,8 @@ aliases: []
title: 2026-01-06 10:57:?? title: 2026-01-06 10:57:??
tags: tags:
- type/periodic/timestamped - type/periodic/timestamped
- topic/estimating
- topic/organization
dg-publish: true dg-publish: true
--- ---
# 2026-01-06 10:57:?? # 2026-01-06 10:57:??
+2
View File
@@ -17,6 +17,8 @@ yearly: "[[2026]]"
--- ---
# 2026-03-09 15:50:49 # 2026-03-09 15:50:49
## Pre-Takeoff Confirmation --- Charlotte South End Hotel
%% %%
Implementation of [[conest-pre-takeoff-email-template]] Implementation of [[conest-pre-takeoff-email-template]]
for [[charlotte-south-end-hotel]] for [[charlotte-south-end-hotel]]
+1 -1
View File
@@ -19,7 +19,7 @@ yearly: "[[2026]]"
## Charlotte South End Hotel Spec Interpretation ## Charlotte South End Hotel Spec Interpretation
[[charlotte-south-end-hotel|Charlotte South End Hotel]] Spec interpretation notes for [[charlotte-south-end-hotel]]
### EMT Fittings ### EMT Fittings
+41
View File
@@ -0,0 +1,41 @@
---
id: 2026-03-25T08:14:59-04:00
aliases: []
title: 2026-03-25 08:14:59
tags:
- authorship/original
- destiny/permanent
- status/draft
- type/periodic/timestamped
dg-publish: true
date-created: 2026-03-25T08:14:59-04:00
daily: "[[2026-03-25]]"
weekly: "[[2026-W13]]"
monthly: "[[2026-03]]"
quarterly: "[[2026-Q1]]"
yearly: "[[2026]]"
---
# 2026-03-25 08:14:59
## "Free-Air Per Code"
Direction for [[telecom-takeoff]] and [[low-voltage-takeoff]]
concerning the proper interpretation of "free-air per code"
as used by [[pdi-estimating#Bid Estimating|Bid]] to qualify our scope.
> [!quote] [[charlotte-south-end-hotel]] Proposal 2025-12-12 Ex. B Notes
> * All Fire Alarm and Low Voltage cabling
> is to \[be\] installed via free-air
> in all areas excepted \[sic.\] by code
Strictly speaking, requirements for communications wiring
(governed by [[nfpa-70_national-electric-code#^ch8|NEC Chapter 8]])
are minimal.
> [!quote] Joel Jansen 2026-03-24 (pp.)
> If rough-in for Telecom or a Low Voltage system is included,
> even if qualified as "free-air per code" or similar,
> always provide backboxes and conduit stub-ups for outlets
> in other than units.
Joel confirmed this direction is not region specific.
+28
View File
@@ -0,0 +1,28 @@
---
id: 2026-03-25T08:55:46-04:00
aliases: []
title: 2026-03-25 08:55:46
tags:
- authorship/original
- destiny/permanent
- status/draft
- type/periodic/timestamped
dg-publish: true
date-created: 2026-03-25T08:55:46-04:00
daily: "[[2026-03-25]]"
weekly: "[[2026-W13]]"
monthly: "[[2026-03]]"
quarterly: "[[2026-Q1]]"
yearly: "[[2026]]"
---
# 2026-03-25 08:55:46
Relevant to [[pdi-accubid-final-price#Material Tax]],
in general and for [[charlotte-south-end-hotel]].
Charlotte, NC combined sales tax is currently 7.25%,
but will increase to 8.25% effective July 1, 2026.[^1]
[^1]: [Spectrum News - Mecklenburg County passes sales tax increase proposal](https://spectrumlocalnews.com/nc/charlotte/news/2025/11/05/sales-tax-increase-proposal-passes)
Project start date according to the Approved PDI Labor Plan is 2025-05-04.
+26
View File
@@ -0,0 +1,26 @@
---
id: 2026-03-25T12:53:30-04:00
aliases: []
title: 2026-03-25 12:53:30
tags:
- authorship/original
- destiny/permanent
- status/draft
- type/periodic/timestamped
dg-publish: true
date-created: 2026-03-25T12:53:30-04:00
daily: "[[2026-03-25]]"
weekly: "[[2026-W13]]"
monthly: "[[2026-03]]"
quarterly: "[[2026-Q1]]"
yearly: "[[2026]]"
---
# 2026-03-25 12:53:30
Regarding [[statistical-modeling-for-construction-estimating#Average Distance Given Area]]:
I'd like to look further into this topic.
Multi-family has several factors that make run distances more consistent than the kitchen sink roster I was used to.
Area per unit falls within a predictable range.
Floors are long and narrow to ensure all units have windows.
+42
View File
@@ -0,0 +1,42 @@
---
id: 2026-03-25T13:00:49-04:00
aliases: []
title: 2026-03-25 13:00:49
tags:
- authorship/original
- destiny/permanent
- status/draft
- type/periodic/timestamped
dg-publish: true
date-created: 2026-03-25T13:00:49-04:00
daily: "[[2026-03-25]]"
weekly: "[[2026-W13]]"
monthly: "[[2026-03]]"
quarterly: "[[2026-Q1]]"
yearly: "[[2026]]"
---
# 2026-03-25 13:00:49
## ConEst Scorecard Meeting
Score by Senior ConEst Estimator team.
Sample jobs selected from WBS's sent that quarter.
Intent is equal weight between
estimator and senior tasks.
### Scorecard Checkpoints
#### 1. Pre-Takeoff Email
[[conest-pre-takeoff-email-template]] used correctly.
#### 2. Accubid Extension Pricing
PDI used as vendor as required.
Quotes requested, received for any specialty items.
Temporary Items include sort codes, part numbers
#### 3. WBS Presentation
+48
View File
@@ -0,0 +1,48 @@
---
id: 2026-03-25T13:17:35-04:00
aliases: []
title: 2026-03-25 13:17:35
tags:
- authorship/original
- destiny/permanent
- status/draft
- type/periodic/timestamped
dg-publish: true
date-created: 2026-03-25T13:17:35-04:00
daily: "[[2026-03-25]]"
weekly: "[[2026-W13]]"
monthly: "[[2026-03]]"
quarterly: "[[2026-Q1]]"
yearly: "[[2026]]"
---
# 2026-03-25 13:17:35
## BPM Tasks Meeting
Regarding [[conest-pre-takeoff-email-template#Tasks/Quotes Needed for WBS]]:
Intent is to reduce WBS turnaround,
reduce time spent sitting on WBS's completed
except for pending tasks.
A task is "missing"
if it is necessary to complete the WBS
and it is not already open (or completed) in BPM.
* **BPM > Bid History:** Tasks within the current Bid Round
* **BPM > Tasks:** Tasks outside of Bid Round
Tasks > 1. Open Tasks
Tasks > 2. Completed Tasks
* Constructability Review
* Coordination Studies
* DAS Pathway Design
If all necessary tasks are open or completed:
"No tasks missing."
Prompted by Joel,
Josh clarified that "... Raceway Design" tasks
are not necessary for Low Voltage, Telecom systems,
only Public Safety DAS.
+1 -1
View File
@@ -31,7 +31,7 @@ you should seek clarification.
## Example Wiring Method Selection ## Example Wiring Method Selection
Below is an example Wiring Method Selection Below is an example Wiring Method Selection
for a [[ibc-construction-types#5-Over-1 Construction|podium]] construction. for a [[ibc-construction-types#^5-over-1|podium]] construction.
> [!example] > [!example]
> Wire Material: > Wire Material: