### Limitations of Traditional Estimating Methods
|
||||
|
||||
Traditional estimating methods, sometimes referred to as "Detailed Takeoff",
|
||||
Traditional estimating methods,
|
||||
sometimes referred to as "Detailed Takeoff",
|
||||
seek to detail all constituent subcosts,
|
||||
including 100% itemized pricing by way of a _material extension_,
|
||||
a complete list of all material included in the price.
|
||||
@@ -29,8 +30,9 @@ For clarity and contrast to [[risk-oriented-estimating]],
|
||||
which does not require itemized pricing,
|
||||
I'll refer to these methods as "item-oriented estimating".
|
||||
|
||||
By popular belief, item-oriented estimating is the only "correct" way to estimate,
|
||||
however few to no estimators create 100% "Detailed" estimates
|
||||
By popular belief,
|
||||
item-oriented estimating is the only "correct" way to estimate,
|
||||
however few to no estimators create 100% "detailed" estimates
|
||||
as the effort would require a significant increase in estimating time
|
||||
for little reward in overall **precision**.
|
||||
|
||||
@@ -44,7 +46,8 @@ for little reward in overall **precision**.
|
||||
|
||||
It is popular to dismiss alternate estimate models as potentially inaccurate,
|
||||
but this dismissal fails to acknowledge
|
||||
the potential for _much greater_ inaccuracy in item-oriented methods.
|
||||
the potential for _much greater_ inaccuracy in item-oriented methods:
|
||||
|
||||
While an estimate based on item extension is 100% **precise**,
|
||||
in that it computes to single final number,
|
||||
the method has no such inherent guarantee of **accuracy**.
|
||||
|
||||