vault backup: 2026-01-08 16:57:50
This commit is contained in:
@@ -0,0 +1,41 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
title: "2026-01-08"
|
||||
tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/daily
|
||||
---
|
||||
# 2026-01-08
|
||||
|
||||
## 2026-01-08 13:33
|
||||
|
||||
### 2100 Crystal Drive
|
||||
|
||||
#### Switchgear
|
||||
|
||||
Switchgear cost comp
|
||||
"\\EgnyteDrive\Shared\Estimating\11 Bid Estimating Spreadsheets\Switchgear Pricing Tool Version 2 (2.02.2024) (Template) - Copy.xls"
|
||||
|
||||
Includes
|
||||
* submetering
|
||||
* coordination study
|
||||
|
||||
#### Generators
|
||||
|
||||
> [!failure]
|
||||
> Generators were erroneously broken down in switchgear.
|
||||
|
||||
[[switchgear-takeoff#Generator|Generator]]
|
||||
|
||||
#### Composite Cleanup
|
||||
|
||||
1 day per week
|
||||
|
||||
#### Temp Power
|
||||
|
||||
$10,000 per [[heavy-equipment#Swing Stage Scaffolding|swing stage]]
|
||||
|
||||
[[temp-power-takeoff]]
|
||||
Reference in New Issue
Block a user