685 B
685 B
id, aliases, title, tags
| id | aliases | title | tags | ||||
|---|---|---|---|---|---|---|---|
| 2026-01-08 |
|
2026-01-08
2026-01-08 13:33
2100 Crystal Drive
Switchgear
Switchgear cost comp "\EgnyteDrive\Shared\Estimating\11 Bid Estimating Spreadsheets\Switchgear Pricing Tool Version 2 (2.02.2024) (Template) - Copy.xls"
Includes
- submetering
- coordination study
Generators
[!failure] Generators were erroneously broken down in switchgear.
Composite Cleanup
1 day per week
Temp Power
$10,000 per heavy-equipment#Swing Stage Scaffolding