# 2026-01-08
## 2026-01-08 13:33
### 2100 Crystal Drive
#### Switchgear
Switchgear cost comp
"\\EgnyteDrive\Shared\Estimating\11 Bid Estimating Spreadsheets\Switchgear Pricing Tool Version 2 (2.02.2024) (Template) - Copy.xls"
Includes
* submetering
* coordination study
#### Generators
> [!failure]
> Generators were erroneously broken down in switchgear.
[[switchgear-takeoff#Generator|Generator]]
#### Composite Cleanup
1 day per week
#### Temp Power
$10,000 per [[heavy-equipment#Swing Stage Scaffolding|swing stage]]
[[temp-power-takeoff]]