## Technicality
|
||||
|
||||
In other industries, estimating is treated appropriately like a data science.
|
||||
In ours, [[gut-feel]] dominates decision making.
|
||||
In ours, [[intuition]] dominates decision making.
|
||||
|
||||
%% TODO: %%
|
||||
[[estimator-calibration]]
|
||||
|
||||
@@ -162,6 +162,10 @@ For each stairwell:
|
||||
|
||||
## Devices
|
||||
|
||||
Takeoff should always(?) use the
|
||||
`DOES NOT INCLUDE COST OF DEVICES AND CABLE` assemblies,
|
||||
since we will always(?) have a fire alarm quote.
|
||||
|
||||
### Smoke Detectors
|
||||
|
||||
1. `COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`INITIATING DEVICES WITH WIRE - ...`/`SMOKE DETECTOR W/ BASE - ...`
|
||||
@@ -190,11 +194,12 @@ For each stairwell:
|
||||
_Design Build (method 1):_
|
||||
* Count every 75 ft,
|
||||
* measure with circles on Bluebeam
|
||||
* or divide relevant SF area by 4415
|
||||
* $\pi(\frac{75}{2})^2 \approx 4415$
|
||||
* or divide relevant SF area by 4415[^2]
|
||||
* every elevator lobby, and
|
||||
* every BOH room on the first floor and garage levels.
|
||||
|
||||
[^2]: $\pi(\frac{75}{2})^2 \approx 4415$
|
||||
|
||||
_Design Build (alternative method):_
|
||||
* 15ft from end of corridor,
|
||||
* then every 50ft
|
||||
|
||||
@@ -0,0 +1,17 @@
|
||||
---
|
||||
aliases:
|
||||
- IEEE
|
||||
title: Institute of Electrical and Electronics Engineers (IEEE)
|
||||
tags: []
|
||||
---
|
||||
# Institute of Electrical and Electronics Engineers (IEEE)
|
||||
|
||||
> The [Institute of Electrical and Electronics Engineers (IEEE)](https://en.wikipedia.org/wiki/Institute_of_Electrical_and_Electronics_Engineers)
|
||||
> is an American 501(c)(3) charitable professional organization
|
||||
> for electrical engineering, electronics engineering, and related disciplines.
|
||||
|
||||
## Style Manual
|
||||
|
||||
[IEEE Editorial Style Manual](https://journals.ieeeauthorcenter.ieee.org/create-your-ieee-journal-article/create-the-text-of-your-article/ieee-editorial-style-manual/)
|
||||
|
||||
[The Chicago Manual of Style](https://www.chicagomanualofstyle.org/home.html)
|
||||
@@ -0,0 +1,10 @@
|
||||
---
|
||||
id: 2026-05-23
|
||||
title: 2026-05-23
|
||||
tags: []
|
||||
weekly: "[[2026w21]]"
|
||||
monthly: "[[2026-05]]"
|
||||
quarterly: "[[2026q2]]"
|
||||
previous: "[[2026-05-22]]"
|
||||
---
|
||||
# 2026-05-23
|
||||
@@ -0,0 +1,10 @@
|
||||
---
|
||||
id: 2026-05-24
|
||||
title: 2026-05-24
|
||||
tags: []
|
||||
weekly: "[[2026w22]]"
|
||||
monthly: "[[2026-05]]"
|
||||
quarterly: "[[2026q2]]"
|
||||
previous: "[[2026-05-23]]"
|
||||
---
|
||||
# 2026-05-24
|
||||
@@ -0,0 +1,10 @@
|
||||
---
|
||||
id: 2026-05-25
|
||||
title: 2026-05-25
|
||||
tags: []
|
||||
weekly: "[[2026w22]]"
|
||||
monthly: "[[2026-05]]"
|
||||
quarterly: "[[2026q2]]"
|
||||
previous: "[[2026-05-24]]"
|
||||
---
|
||||
# 2026-05-25
|
||||
@@ -0,0 +1,10 @@
|
||||
---
|
||||
id: 2026-05-26
|
||||
title: 2026-05-26
|
||||
tags: []
|
||||
weekly: "[[2026w22]]"
|
||||
monthly: "[[2026-05]]"
|
||||
quarterly: "[[2026q2]]"
|
||||
previous: "[[2026-05-25]]"
|
||||
---
|
||||
# 2026-05-26
|
||||
@@ -0,0 +1,10 @@
|
||||
---
|
||||
id: 2026-05-27
|
||||
title: 2026-05-27
|
||||
tags: []
|
||||
weekly: "[[2026w22]]"
|
||||
monthly: "[[2026-05]]"
|
||||
quarterly: "[[2026q2]]"
|
||||
previous: "[[2026-05-26]]"
|
||||
---
|
||||
# 2026-05-27
|
||||
@@ -0,0 +1,7 @@
|
||||
---
|
||||
title: 2026w22
|
||||
tags: []
|
||||
yearly: "[[2026]]"
|
||||
previous: "[[2026w21]]"
|
||||
---
|
||||
# 2026w22
|
||||
@@ -73,7 +73,7 @@ in the most likely case of each axis of uncertainty.
|
||||
## Risk Tolerance
|
||||
|
||||
Determining risk tolerance is a task usually appropriated by executives
|
||||
(often based on [[gut-feel]]),
|
||||
(often based on [[intuition]]),
|
||||
but that is better determined mathematically.
|
||||
|
||||
[Risk of ruin](https://en.wikipedia.org/wiki/Risk_of_ruin)
|
||||
|
||||
@@ -47,7 +47,7 @@ construction estimating as a profession
|
||||
suffers from poor conditions for natural improvement of [[estimator-calibration]],
|
||||
namely delayed and uninformative feedback.
|
||||
As a consequence,
|
||||
decisions are made on [[gut-feel]] at best,
|
||||
decisions are made on [[intuition]] at best,
|
||||
and superstition at worst.
|
||||
The suitability of estimating methods
|
||||
is judged based on [value](https://en.wikipedia.org/wiki/Value_(ethics))[^2]
|
||||
|
||||
@@ -63,7 +63,7 @@ and when they are simply bad luck.
|
||||
|
||||
The last case is where I'd bet the perceived value of ConEst is found.[^4]
|
||||
I can't help but feel that this effort is misplaced.
|
||||
If project management is like estimating,
|
||||
If [[pdi-operations|ops]] is like [[pdi-estimating|estimating]],
|
||||
I have no doubt that they could _all_ benefit from training.
|
||||
Identifying who exactly needs it more, then, is pointless.
|
||||
As well to identify which cases of great project success
|
||||
|
||||
Reference in New Issue
Block a user