Hello Team,
|
||||
|
||||
Below is a comprehensive list of means & methods for {Project Name}.
|
||||
Please confirm you have received this email and respond with any questions or comments.
|
||||
Below is a comprehensive list of means & methods for **1990 K Street**.
|
||||
Please confirm you have received this email
|
||||
and respond with any questions or comments.
|
||||
|
||||
* **Takeoff Request Stage:** Full Takeoff
|
||||
<!-- Stage 1, Stage 1 + Units, Full takeoff -->
|
||||
%% Stage 1, Stage 1 + Units, Full takeoff %%
|
||||
* **Delivery Method:** Plans & Specs
|
||||
<!-- Plans & Specs, Design Build, Design Assist, P&S with Approved VE -->
|
||||
%% Plans & Specs, Design Build, Design Assist, P&S with Approved VE %%
|
||||
* **Document Stage:** Permit
|
||||
<!-- DD, CD, Permit, GMP, Bid, Awarded -->
|
||||
%% DD, CD, Permit, GMP, Bid, Awarded %%
|
||||
* **Drawings Date:** 2025-12-05
|
||||
* **Project Manual Date:** 2025-10-29
|
||||
* **Proposal Date:** 2026-02-11
|
||||
* **Project Manual Date:** 2025-12-05
|
||||
* **Proposal Date:** 2026-01-22
|
||||
|
||||
## Project Specification Callouts
|
||||
### Project Specification Callouts
|
||||
|
||||
<!-- Put page of Drawing or PM after answer -->
|
||||
%% Put page of Drawing or PM after answer %%
|
||||
|
||||
* **Conduit:**
|
||||
* EMT Fittings: Set-screw. _---Spec 260533.13 (p. 1423)_
|
||||
<!-- GRC, coupling specs, etc. -->
|
||||
* **Conduit:**
|
||||
* EMT Fittings: Set-screw _---Spec 260533.13 (p. 1423)_
|
||||
%% GRC, coupling specs, etc. %%
|
||||
|
||||
* **Wire:**
|
||||
* Material: Aluminum 100A and larger
|
||||
* Acceptable Manufacturers:
|
||||
* **Wire:**
|
||||
* Material: Aluminum 100A and larger _---E021 "ALUMINUM FEEDER SCHEDULE" Note 1(b)_
|
||||
* Acceptable Manufacturers: _---Spec 260519 (p. 1384)_
|
||||
* Alpha Wire; Brand of Belden, Inc.
|
||||
* Belden Inc.
|
||||
* Cerro Wire LLC
|
||||
@@ -52,10 +53,10 @@ Please confirm you have received this email and respond with any questions or co
|
||||
* Southwire Company, LLC
|
||||
* WESCO
|
||||
|
||||
* **MC Cable:**
|
||||
* Application:
|
||||
<!-- Branch homeruns only; Not permitted -->
|
||||
* Acceptable Manufacturers:
|
||||
* **MC Cable:**
|
||||
* Application: Concealed feeders and branch circuits _---Spec 260519 (p. 1389)_
|
||||
%% Branch homeruns only; Not permitted %%
|
||||
* Acceptable Manufacturers: _---Spec 260519 (p. 1385-1386)_
|
||||
* AFC Cable Systems; Atkore International
|
||||
* Alpha Wire; Brand of Belden, Inc.
|
||||
* Belden Inc.
|
||||
@@ -65,26 +66,29 @@ Please confirm you have received this email and respond with any questions or co
|
||||
* Okonite Company
|
||||
* Southwire Company, LLC
|
||||
* WESCO
|
||||
* ==Conductors: Copper _---Spec 260519 (p. 1386)_==
|
||||
* ==Armor: Steel _---Spec 260519 (p. 1386)_==
|
||||
* ==Jacket: PVC _---Spec 260519 (p. 1386)_==
|
||||
|
||||
* **Steel Box Depth:**
|
||||
* **Steel Box Depth:**
|
||||
* Telecom: 2-1/8" _---Spec 270500 (p. 1673)_
|
||||
* Security: 2-1/8" _---Spec 280500 (p. 1753)_
|
||||
* Other Applications: Not specified
|
||||
<!-- 1-1/2", 2-1/8" -->
|
||||
%% 1-1/2", 2-1/8" %%
|
||||
|
||||
* **Floor Boxes:**
|
||||
* Box Material:
|
||||
<!-- Box: PVC, Sheet metal, Cast iron -->
|
||||
* Cover Material:
|
||||
<!-- Covers: Brass, Aluminum -->
|
||||
* **Floor Boxes:** Sheet metal with brass or aluminum covers _---Spec 262719 (p. 1541)_
|
||||
|
||||
* **Wiring Devices:**
|
||||
* **Wiring Devices:**
|
||||
* Units:
|
||||
<!-- 15A Decora -->
|
||||
* Current rating: Unspecified. Assuming 15A for takeoff.
|
||||
* Standard/Decora: Unspecified. Assuming Toggle/Duplex for takeoff.
|
||||
%% 15A Decora %%
|
||||
* BOH/Common Areas:
|
||||
<!-- 20A Toggle/Duplex -->
|
||||
* Current rating: Unspecified. Assuming 20A for takeoff.
|
||||
* Standard/Decora: Unspecified. Assuming Toggle/Duplex for takeoff.
|
||||
%% 20A Toggle/Duplex %%
|
||||
|
||||
* **Switchboards:**
|
||||
* **Switchboards:**
|
||||
* Acceptable Manufacturers: _---Spec 262413 (p. 1502)_
|
||||
* ABB, Electrification Business
|
||||
* Eaton
|
||||
@@ -92,31 +96,38 @@ Please confirm you have received this email and respond with any questions or co
|
||||
* Square D; Schneider Electric USA
|
||||
* General Electric
|
||||
* Bus Material: Aluminum _---Spec 262413 (p. 1503)_
|
||||
* Breaker Types:
|
||||
<!-- Snap-on, bolt on -->
|
||||
* AIC Ratings:
|
||||
* Interrupting Current Rating: Not specified.
|
||||
|
||||
* **Panelboards:**
|
||||
* **Distribution Panelboards:**
|
||||
* Acceptable Manufacturers: _---Spec 262413 (p. 1514-1515)_
|
||||
* Eaton
|
||||
* Bus Material: Aluminum _---Spec 262413 (p. 1513)_
|
||||
* Breaker Types: Bolt-on _---Spec 262413 (p. 1515)_
|
||||
%% Snap-on, bolt on %%
|
||||
* Interrupting Current Rating: Not specified.
|
||||
|
||||
* **Load Centers:**
|
||||
* Acceptable Manufacturers: _---Spec 262413 (p. 1514-1515)_
|
||||
* ABB, Electrification Business
|
||||
* Eaton
|
||||
* Siemens Industry, Inc., Energy Management Division
|
||||
* Square D; Schneider Electric USA
|
||||
* Bus Material:
|
||||
* Breaker Types:
|
||||
<!-- Snap-on, bolt on -->
|
||||
* ACI Ratings:
|
||||
* Bus Material: Aluminum _---Spec 262413 (p. 1513)_
|
||||
* Breaker Types: Plug-in _---Spec 262413 (p. 1515)_
|
||||
%% Snap-on, bolt on %%
|
||||
* Interrupting Current Rating: Not specified.
|
||||
* ==Covers shall be factory-applied white paint.== _---Dwg. E401-E405 "ELECTRICAL DRAWING NOTES" (P)_
|
||||
|
||||
* **Transformers:**
|
||||
* **Transformers:**
|
||||
* Winding Material: Aluminum _---Spec 262213 (p. 1495)_
|
||||
* K-Rating: Not specified
|
||||
<!-- Windings AL or CU, K-rating -->
|
||||
* K-Rating: Not specified.
|
||||
%% Windings AL or CU, K-rating %%
|
||||
|
||||
* **Generator:** (1) 600kW Diesel
|
||||
* Enclosure Specs: Level 2 Sound Attenuating Weatherproof Enclosure. _---Dwg. E014_
|
||||
* Enclosure Specs: Level 2 Sound Attenuating Weatherproof Enclosure _---Dwg. E014_
|
||||
* Remote Tank: None shown or specified.
|
||||
* Tank Size: 24hrs at 100% load. _---Spec 263213.13 (p. 1604)_
|
||||
* Load Banks: Internal, 50% load. _---Dwg. E014, Spec 263213.13 (p. 1608)_
|
||||
* Tank Size: 24hrs at 100% load _---Spec 263213.13 (p. 1604)_
|
||||
* Load Banks: Internal, 50% load _---Dwg. E014, Spec 263213.13 (p. 1608)_
|
||||
* Acceptable Manufacturers: _---Spec 263213.13 (p. 1600)_
|
||||
* Caterpillar, Inc.; Electric Power Division
|
||||
* Cummins Power Generation
|
||||
@@ -125,58 +136,91 @@ Please confirm you have received this email and respond with any questions or co
|
||||
* Kohler Power Systems
|
||||
* Rolls-Royce Solutions America Inc
|
||||
|
||||
## Project Drawing/Detail Callouts
|
||||
### Project Drawing/Detail Callouts
|
||||
|
||||
* **Describe conflicts between drawings / proposal:**
|
||||
<!-- Plans show CU feeders, proposal calls for aluminum; Specification grade devices, etc. -->
|
||||
Dwg. IDS-01A "OUTLET SPECIFICATIONS": Screwless Cover
|
||||
|
||||
* **Cost drivers in details not shown elsewhere on plans:**
|
||||
* <!-- Assuming this refers to lighting control -->
|
||||
Dwg. IDS-01A "SWITCHING SPECIFICATIONS": Legrand Tru-Universal Rocker/Dimmers
|
||||
(Is this for Amenity/Common Areas?)
|
||||
|
||||
## PDI System Execution Plan
|
||||
<!--
|
||||
* **Describe conflicts between drawings / proposal**
|
||||
%% Plans show CU feeders, proposal calls for aluminum; Specification grade devices, etc. %%
|
||||
|
||||
* **Cost drivers in details not shown elsewhere on plans**
|
||||
%% Assuming this refers to lighting control %%
|
||||
-->
|
||||
|
||||
### PDI System Execution Plan
|
||||
|
||||
* **Primaries:** Conduit and wiring excluded. _---Proposal 2026-01-22, Ex. B, Exclusions, Line 27_
|
||||
<!-- Installation only, (9) 6" PVC -->
|
||||
* **Secondaries:** Wiring excluded. _---Proposal 2026-01-22, Ex. B, Exclusions, Line 28_
|
||||
<!-- PVC UG, GRC Stub-ups, AL -->
|
||||
* **Feeders:**
|
||||
<!-- PVC UG, EMT OH, AL over 100A, 2% VD -->
|
||||
* **Unit Subfeeds:** EMT-SS, MC OH; PVC UG
|
||||
<!-- MC OH AL, VD per Chart on E5.01 -->
|
||||
* **Units:**
|
||||
<!-- 15A Decora, Disposals, T-stat, Floor Boxes, Shade Control, Doorbells, Dimmer Switches, etc. -->
|
||||
* **Telecom:**
|
||||
<!-- 42" MSDE, No Cable Homeruns, (1) 1" Back to IDF, CAT6 with Stub-ups -->
|
||||
* **EV Chargers:**
|
||||
<!-- (42) Conduit only, (56) Conduit & Wire, (20) Conduit, Wire & Equipment -->
|
||||
%% Installation only, (9) 6" PVC %%
|
||||
|
||||
* **Secondaries:**
|
||||
* Schedule 40 PVC UG; _---Proposal 2026-01-22, Ex. B, Inclusions Line 54-55_
|
||||
* wiring excluded. _---Proposal 2026-01-22, Ex. B, Exclusions, Line 28_
|
||||
%% PVC UG, GRC Stub-ups, AL %%
|
||||
|
||||
* **Feeders:** PVC UG, EMT OH; AL 100A and larger; 2% voltage drop.
|
||||
%% PVC UG, EMT OH, AL over 100A, 2% VD %%
|
||||
%% Emergency Feeds MI Cable %%
|
||||
|
||||
* **Unit Subfeeds:** MC OH; size per E025-E028 meter bank schedules; 3% voltage drop.
|
||||
%% MC OH AL, VD per Chart on E5.01 %%
|
||||
|
||||
* **Units:**
|
||||
* DW/Disposal - Separate Circuit
|
||||
* Range - \#6/3
|
||||
* Kitchen Backsplash - Decora (Non-Combo Small Appliance Breakers)
|
||||
* 120V Smokes
|
||||
* EWH - \#8/2
|
||||
* VRF HVAC
|
||||
* 20A Toggle Switches
|
||||
* 15A Duplex Receptacles
|
||||
%% 15A Decora, Disposals, T-stat, Floor Boxes, Shade Control, Doorbells, Dimmer Switches, etc. %%
|
||||
|
||||
* **Telecom:**
|
||||
* 30" MSDE; _---T0.32/1 Note 3: "PRIMEX SOHOPRO P3000ND"_
|
||||
* (1) 1" innerduct to IDF. _---Proposal 2026-01-22, Ex. B, General Requirements, Line 114_
|
||||
%% 42" MSDE, No Cable Homeruns, (1) 1" Back to IDF, CAT6 with Stub-ups %%
|
||||
|
||||
* **EV Chargers:** (2) dual circuit chargers with conduit, wire, data rough-in, and equipment.
|
||||
%% (42) Conduit only, (56) Conduit & Wire, (20) Conduit, Wire & Equipment %%
|
||||
|
||||
* **Fire Alarm:** Devices PVC in-slab, Risers EMT.
|
||||
<!-- Free-air where allowed by code. EMT Risers. -->
|
||||
* **DAS:** System included
|
||||
<!-- Conduit only, Per PDI DAS Design -->
|
||||
%% Free-air where allowed by code. EMT Risers. %%
|
||||
|
||||
* **DAS:** System per PDI DAS Design.
|
||||
%% Conduit only, Per PDI DAS Design %%
|
||||
|
||||
* **Low Voltage:** Free-air where allowed by code.
|
||||
<!-- Free-air where allowed by code. Stub-ups to accessible ceilings. -->
|
||||
%% Free-air where allowed by code. Stub-ups to accessible ceilings. %%
|
||||
|
||||
## Lighting Control
|
||||
### Lighting Control
|
||||
|
||||
* **Scope:**
|
||||
<!-- Code Minimum per Energy Code Assigned, P&S, PDI Design -->
|
||||
* **Basis of Takeoff:** Design per Plans and Specs _---Christian Pereiro 2026-02-11_
|
||||
%% Code Minimum per Energy Code Assigned, P&S, PDI Design %%
|
||||
|
||||
* **Area:** <!-- Assign Method to Areas: Line Voltage, Low-Voltage Stand Alone or Centralized System -->
|
||||
* BOH:
|
||||
* Corridor:
|
||||
* Amenity:
|
||||
* Site/Landscape:
|
||||
* Garage Entry Point
|
||||
* Office:
|
||||
* **Area:** _---Dwg. E021 "AUTOMATED LIGHTING CONTROL - SEQUENCES OF OPERATIONS"_
|
||||
* BOH: Line Voltage Control, no dimming
|
||||
* Corridor: Digital Standalone Control, 0-10V dimming
|
||||
* Amenity: Digital Standalone Control, 0-10V dimming
|
||||
* Offices: Digital Standalone Control, 0-10V dimming, controlled receptacles as shown
|
||||
* Site/Landscape: Line Voltage Control, no dimming
|
||||
* Garage: Digital Standalone Control, 0-10V dimming
|
||||
%% Assign Method to Areas: Line Voltage, Low-Voltage Stand Alone or Centralized System %%
|
||||
|
||||
## Tasks/Quotes Needed for WBS
|
||||
Takeoff will utilize assemblies including
|
||||
conduit rough-in, Cat5e cable, and device labor.
|
||||
|
||||
<!-- Delete any completed -->
|
||||
### Tasks/Quotes Needed for WBS
|
||||
|
||||
<!-- * Electrical Constructability Review -->
|
||||
* Electrical VDC
|
||||
%% Delete any completed %%
|
||||
|
||||
%% * Electrical Constructability Review %%
|
||||
%% * Electrical VDC %%
|
||||
* Coordination Study
|
||||
<!-- * DAS Public Safety Raceway Design -->
|
||||
%% * DAS Public Safety Raceway Design %%
|
||||
|
||||
<!--
|
||||
DAS Public Safety Raceway Design is necessary
|
||||
|
||||