# 2026-02-11 12:12:16
|
||||
@@ -21,98 +21,168 @@ Hello Team,
|
||||
Below is a comprehensive list of means & methods for {Project Name}.
|
||||
Please confirm you have received this email and respond with any questions or comments.
|
||||
|
||||
- Takeoff Request Stage:
|
||||
* **Takeoff Request Stage:** Full Takeoff
|
||||
<!-- Stage 1, Stage 1 + Units, Full takeoff -->
|
||||
- Delivery Method:
|
||||
* **Delivery Method:** Plans & Specs
|
||||
<!-- Plans & Specs, Design Build, Design Assist, P&S with Approved VE -->
|
||||
- Document Stage:
|
||||
* **Document Stage:** Permit
|
||||
<!-- DD, CD, Permit, GMP, Bid, Awarded -->
|
||||
- Drawings Date: <!-- Date -->
|
||||
- Project Manual Date: <!-- Date -->
|
||||
- Proposal Date: <!-- Date -->
|
||||
* **Drawings Date:** 2025-12-05
|
||||
* **Project Manual Date:** 2025-10-29
|
||||
* **Proposal Date:** 2026-02-11
|
||||
|
||||
### Project Specification Callouts
|
||||
## Project Specification Callouts
|
||||
|
||||
<!-- Put page of Drawing or PM after answer -->
|
||||
|
||||
- Conduit Execution Plans:
|
||||
* **Conduit:**
|
||||
* EMT Fittings: Set-screw. _---Spec 260533.13 (p. 1423)_
|
||||
<!-- GRC, coupling specs, etc. -->
|
||||
- Wire:
|
||||
<!-- Copper or Aluminum, Acceptable Manufacturers -->
|
||||
- {MC} Cable Application:
|
||||
<!-- Branch homeruns only; Not permitted -->
|
||||
- Steel Box Depth:
|
||||
|
||||
* **Wire:**
|
||||
* Material: Aluminum 100A and larger
|
||||
* Acceptable Manufacturers:
|
||||
* Alpha Wire; Brand of Belden, Inc.
|
||||
* Belden Inc.
|
||||
* Cerro Wire LLC
|
||||
* Encore Wire Corporation
|
||||
* General Cable; Prysmian Group North America
|
||||
* Okonite Company
|
||||
* Service Wire Co.
|
||||
* Southwire Company, LLC
|
||||
* WESCO
|
||||
|
||||
* **MC Cable:**
|
||||
* Application:
|
||||
<!-- Branch homeruns only; Not permitted -->
|
||||
* Acceptable Manufacturers:
|
||||
* AFC Cable Systems; Atkore International
|
||||
* Alpha Wire; Brand of Belden, Inc.
|
||||
* Belden Inc.
|
||||
* Cerro Wire LLC
|
||||
* Encore Wire Corporation
|
||||
* General Cable; Prysmian Group North America
|
||||
* Okonite Company
|
||||
* Southwire Company, LLC
|
||||
* WESCO
|
||||
|
||||
* **Steel Box Depth:**
|
||||
* Telecom: 2-1/8" _---Spec 270500 (p. 1673)_
|
||||
* Security: 2-1/8" _---Spec 280500 (p. 1753)_
|
||||
* Other Applications: Not specified
|
||||
<!-- 1-1/2", 2-1/8" -->
|
||||
- Floor Boxes:
|
||||
- Box Material:
|
||||
|
||||
* **Floor Boxes:**
|
||||
* Box Material:
|
||||
<!-- Box: PVC, Sheet metal, Cast iron -->
|
||||
* Cover Material:
|
||||
<!-- Covers: Brass, Aluminum -->
|
||||
- Wiring Devices:
|
||||
- Units:
|
||||
<!-- 15A Decora -->
|
||||
- BOH/Common Areas:
|
||||
|
||||
* **Wiring Devices:**
|
||||
* Units:
|
||||
<!-- 15A Decora -->
|
||||
* BOH/Common Areas:
|
||||
<!-- 20A Toggle/Duplex -->
|
||||
- Switchboards/Panelboards:
|
||||
<!-- Acceptable Manufacturers, AL or CU Bussing, Breaker Types (Snap-on, bolt on), ACI Ratings -->
|
||||
- Transformers:
|
||||
|
||||
* **Switchboards:**
|
||||
* Acceptable Manufacturers: _---Spec 262413 (p. 1502)_
|
||||
* ABB, Electrification Business
|
||||
* Eaton
|
||||
* Siemens Industry, Inc., Energy Management Division
|
||||
* Square D; Schneider Electric USA
|
||||
* General Electric
|
||||
* Bus Material: Aluminum _---Spec 262413 (p. 1503)_
|
||||
* Breaker Types:
|
||||
<!-- Snap-on, bolt on -->
|
||||
* AIC Ratings:
|
||||
|
||||
* **Panelboards:**
|
||||
* Acceptable Manufacturers: _---Spec 262413 (p. 1514-1515)_
|
||||
* ABB, Electrification Business
|
||||
* Eaton
|
||||
* Siemens Industry, Inc., Energy Management Division
|
||||
* Square D; Schneider Electric USA
|
||||
* Bus Material:
|
||||
* Breaker Types:
|
||||
<!-- Snap-on, bolt on -->
|
||||
* ACI Ratings:
|
||||
|
||||
* **Transformers:**
|
||||
* Winding Material: Aluminum _---Spec 262213 (p. 1495)_
|
||||
* K-Rating: Not specified
|
||||
<!-- Windings AL or CU, K-rating -->
|
||||
- Generator:
|
||||
* Acceptable manufacturers:
|
||||
* Enclosure Specs:
|
||||
* Sound Rating:
|
||||
* Remote Tank:
|
||||
* Tank Size:
|
||||
* Load Banks:
|
||||
|
||||
### Project Drawing/Detail Callouts
|
||||
* **Generator:** (1) 600kW Diesel
|
||||
* Enclosure Specs: Level 2 Sound Attenuating Weatherproof Enclosure. _---Dwg. E014_
|
||||
* Remote Tank: None shown or specified.
|
||||
* Tank Size: 24hrs at 100% load. _---Spec 263213.13 (p. 1604)_
|
||||
* Load Banks: Internal, 50% load. _---Dwg. E014, Spec 263213.13 (p. 1608)_
|
||||
* Acceptable Manufacturers: _---Spec 263213.13 (p. 1600)_
|
||||
* Caterpillar, Inc.; Electric Power Division
|
||||
* Cummins Power Generation
|
||||
* Generac
|
||||
* Hipower Systems
|
||||
* Kohler Power Systems
|
||||
* Rolls-Royce Solutions America Inc
|
||||
|
||||
- Describe conflicts between drawings / proposal:
|
||||
## Project Drawing/Detail Callouts
|
||||
|
||||
* **Describe conflicts between drawings / proposal:**
|
||||
<!-- Plans show CU feeders, proposal calls for aluminum; Specification grade devices, etc. -->
|
||||
|
||||
- Cost drivers in details not shown elsewhere on plans:
|
||||
- <!-- Assuming this refers to lighting control -->
|
||||
* **Cost drivers in details not shown elsewhere on plans:**
|
||||
* <!-- Assuming this refers to lighting control -->
|
||||
|
||||
### PDI System Execution Plan
|
||||
## PDI System Execution Plan
|
||||
|
||||
- Primaries:
|
||||
* **Primaries:** Conduit and wiring excluded. _---Proposal 2026-01-22, Ex. B, Exclusions, Line 27_
|
||||
<!-- Installation only, (9) 6" PVC -->
|
||||
- Secondaries:
|
||||
* **Secondaries:** Wiring excluded. _---Proposal 2026-01-22, Ex. B, Exclusions, Line 28_
|
||||
<!-- PVC UG, GRC Stub-ups, AL -->
|
||||
- Feeders:
|
||||
* **Feeders:**
|
||||
<!-- PVC UG, EMT OH, AL over 100A, 2% VD -->
|
||||
- Unit Subfeeds:
|
||||
* **Unit Subfeeds:** EMT-SS, MC OH; PVC UG
|
||||
<!-- MC OH AL, VD per Chart on E5.01 -->
|
||||
- Units:
|
||||
<!-- 15A Decora, Insinkerators, T-stat, Floor Boxes, Shade Control, Doorbells, Dimmer Switches, etc. -->
|
||||
- Telecom:
|
||||
* **Units:**
|
||||
<!-- 15A Decora, Disposals, T-stat, Floor Boxes, Shade Control, Doorbells, Dimmer Switches, etc. -->
|
||||
* **Telecom:**
|
||||
<!-- 42" MSDE, No Cable Homeruns, (1) 1" Back to IDF, CAT6 with Stub-ups -->
|
||||
- EV Chargers:
|
||||
* **EV Chargers:**
|
||||
<!-- (42) Conduit only, (56) Conduit & Wire, (20) Conduit, Wire & Equipment -->
|
||||
- Fire Alarm: Devices PVC in-slab, Risers EMT.
|
||||
* **Fire Alarm:** Devices PVC in-slab, Risers EMT.
|
||||
<!-- Free-air where allowed by code. EMT Risers. -->
|
||||
- DAS:
|
||||
* **DAS:** System included
|
||||
<!-- Conduit only, Per PDI DAS Design -->
|
||||
- Low Voltage:
|
||||
* **Low Voltage:** Free-air where allowed by code.
|
||||
<!-- Free-air where allowed by code. Stub-ups to accessible ceilings. -->
|
||||
|
||||
### Lighting Control
|
||||
## Lighting Control
|
||||
|
||||
- Scope:
|
||||
* **Scope:**
|
||||
<!-- Code Minimum per Energy Code Assigned, P&S, PDI Design -->
|
||||
|
||||
- Area: <!-- Assign Method to Areas: Line Voltage, Low-Voltage Stand Alone or Centralized System -->
|
||||
- BOH:
|
||||
- Corridor:
|
||||
- Amenity:
|
||||
- Site/Landscape:
|
||||
- Garage Entry Point
|
||||
- Office:
|
||||
* **Area:** <!-- Assign Method to Areas: Line Voltage, Low-Voltage Stand Alone or Centralized System -->
|
||||
* BOH:
|
||||
* Corridor:
|
||||
* Amenity:
|
||||
* Site/Landscape:
|
||||
* Garage Entry Point
|
||||
* Office:
|
||||
|
||||
### Tasks/Quotes Needed for WBS
|
||||
## Tasks/Quotes Needed for WBS
|
||||
|
||||
- Constructability Review, etc.
|
||||
<!-- Delete any completed -->
|
||||
|
||||
- DAS Raceway Design
|
||||
<!-- * Electrical Constructability Review -->
|
||||
* Electrical VDC
|
||||
* Coordination Study
|
||||
<!-- * DAS Public Safety Raceway Design -->
|
||||
|
||||
<!--
|
||||
DAS Public Safety Raceway Design is necessary
|
||||
if we own DAS pathways but not the system,
|
||||
since if we own the system,
|
||||
the raceway design will be included in the Systems quote.
|
||||
-->
|
||||
|
||||
Thank you,
|
||||
|
||||