vault backup: 2026-02-11 14:33:37
This commit is contained in:
Vendored
+2
-1
@@ -24,5 +24,6 @@
|
||||
"obsidian-tasks-plugin",
|
||||
"digitalgarden",
|
||||
"pdf-plus",
|
||||
"obsidian-tracker"
|
||||
"obsidian-tracker",
|
||||
"copy-as-html"
|
||||
]
|
||||
Vendored
+9
@@ -50,5 +50,14 @@
|
||||
],
|
||||
"key": "S"
|
||||
}
|
||||
],
|
||||
"copy-as-html:copy-as-html-command": [
|
||||
{
|
||||
"modifiers": [
|
||||
"Mod",
|
||||
"Shift"
|
||||
],
|
||||
"key": "C"
|
||||
}
|
||||
]
|
||||
}
|
||||
+3747
File diff suppressed because it is too large
Load Diff
+10
@@ -0,0 +1,10 @@
|
||||
{
|
||||
"id": "copy-as-html",
|
||||
"name": "Copy as HTML",
|
||||
"version": "1.1.3",
|
||||
"minAppVersion": "0.12.0",
|
||||
"description": "This is a simple plugin that converts the selected markdown to HTML and copies it to the clipboard.",
|
||||
"author": "Bailey Jennings",
|
||||
"authorUrl": "https://twitter.com/Bailey_Jennings",
|
||||
"isDesktopOnly": false
|
||||
}
|
||||
@@ -1,17 +1,19 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
title: "2026-02-10 15:49:04"
|
||||
title: 2026-02-10 15:49:04
|
||||
tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- occupational
|
||||
- status/draft
|
||||
- type/minutes
|
||||
- type/periodic/timestamped
|
||||
dg-publish: true
|
||||
daily: "[[2026-02-10]]"
|
||||
weekly: "[[2026-W07]]"
|
||||
dg-publish: true
|
||||
monthly: "[[2026-02]]"
|
||||
quarterly: "[[2026-Q1]]"
|
||||
weekly: "[[2026-W07]]"
|
||||
yearly: "[[2026]]"
|
||||
---
|
||||
# 2026-02-10 15:49:04
|
||||
@@ -72,4 +74,4 @@ He is as critical of overly-heavy estimates
|
||||
as light estimates.
|
||||
He specifically prefers accurate line item costs
|
||||
with a single contingency
|
||||
over inflated individual budgets.
|
||||
over inflated individual budgets.
|
||||
|
||||
@@ -0,0 +1,118 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
title: "2026-02-11 12:12:16"
|
||||
tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/timestamped
|
||||
dg-publish: true
|
||||
daily: "[[2026-02-11]]"
|
||||
weekly: "[[2026-W07]]"
|
||||
monthly: "[[2026-02]]"
|
||||
quarterly: "[[2026-Q1]]"
|
||||
yearly: "[[2026]]"
|
||||
---
|
||||
# 2026-02-11 12:12:16
|
||||
|
||||
Hello Team,
|
||||
|
||||
Below is a comprehensive list of means & methods for {Project Name}.
|
||||
Please confirm you have received this email and respond with any questions or comments.
|
||||
|
||||
- Takeoff Request Stage:
|
||||
<!-- Stage 1, Stage 1 + Units, Full takeoff -->
|
||||
- Delivery Method:
|
||||
<!-- Plans & Specs, Design Build, Design Assist, P&S with Approved VE -->
|
||||
- Document Stage:
|
||||
<!-- DD, CD, Permit, GMP, Bid, Awarded -->
|
||||
- Drawings Date: <!-- Date -->
|
||||
- Project Manual Date: <!-- Date -->
|
||||
- Proposal Date: <!-- Date -->
|
||||
|
||||
### Project Specification Callouts
|
||||
|
||||
<!-- Put page of Drawing or PM after answer -->
|
||||
|
||||
- Conduit Execution Plans:
|
||||
<!-- GRC, coupling specs, etc. -->
|
||||
- Wire:
|
||||
<!-- Copper or Aluminum, Acceptable Manufacturers -->
|
||||
- {MC} Cable Application:
|
||||
<!-- Branch homeruns only; Not permitted -->
|
||||
- Steel Box Depth:
|
||||
<!-- 1-1/2", 2-1/8" -->
|
||||
- Floor Boxes:
|
||||
- Box Material:
|
||||
<!-- Box: PVC, Sheet metal, Cast iron -->
|
||||
* Cover Material:
|
||||
<!-- Covers: Brass, Aluminum -->
|
||||
- Wiring Devices:
|
||||
- Units:
|
||||
<!-- 15A Decora -->
|
||||
- BOH/Common Areas:
|
||||
<!-- 20A Toggle/Duplex -->
|
||||
- Switchboards/Panelboards:
|
||||
<!-- Acceptable Manufacturers, AL or CU Bussing, Breaker Types (Snap-on, bolt on), ACI Ratings -->
|
||||
- Transformers:
|
||||
<!-- Windings AL or CU, K-rating -->
|
||||
- Generator:
|
||||
* Acceptable manufacturers:
|
||||
* Enclosure Specs:
|
||||
* Sound Rating:
|
||||
* Remote Tank:
|
||||
* Tank Size:
|
||||
* Load Banks:
|
||||
|
||||
### Project Drawing/Detail Callouts
|
||||
|
||||
- Describe conflicts between drawings / proposal:
|
||||
<!-- Plans show CU feeders, proposal calls for aluminum; Specification grade devices, etc. -->
|
||||
|
||||
- Cost drivers in details not shown elsewhere on plans:
|
||||
- <!-- Assuming this refers to lighting control -->
|
||||
|
||||
### PDI System Execution Plan
|
||||
|
||||
- Primaries:
|
||||
<!-- Installation only, (9) 6" PVC -->
|
||||
- Secondaries:
|
||||
<!-- PVC UG, GRC Stub-ups, AL -->
|
||||
- Feeders:
|
||||
<!-- PVC UG, EMT OH, AL over 100A, 2% VD -->
|
||||
- Unit Subfeeds:
|
||||
<!-- MC OH AL, VD per Chart on E5.01 -->
|
||||
- Units:
|
||||
<!-- 15A Decora, Insinkerators, T-stat, Floor Boxes, Shade Control, Doorbells, Dimmer Switches, etc. -->
|
||||
- Telecom:
|
||||
<!-- 42" MSDE, No Cable Homeruns, (1) 1" Back to IDF, CAT6 with Stub-ups -->
|
||||
- EV Chargers:
|
||||
<!-- (42) Conduit only, (56) Conduit & Wire, (20) Conduit, Wire & Equipment -->
|
||||
- Fire Alarm: Devices PVC in-slab, Risers EMT.
|
||||
<!-- Free-air where allowed by code. EMT Risers. -->
|
||||
- DAS:
|
||||
<!-- Conduit only, Per PDI DAS Design -->
|
||||
- Low Voltage:
|
||||
<!-- Free-air where allowed by code. Stub-ups to accessible ceilings. -->
|
||||
|
||||
### Lighting Control
|
||||
|
||||
- Scope:
|
||||
<!-- Code Minimum per Energy Code Assigned, P&S, PDI Design -->
|
||||
|
||||
- Area: <!-- Assign Method to Areas: Line Voltage, Low-Voltage Stand Alone or Centralized System -->
|
||||
- BOH:
|
||||
- Corridor:
|
||||
- Amenity:
|
||||
- Site/Landscape:
|
||||
- Garage Entry Point
|
||||
- Office:
|
||||
|
||||
### Tasks/Quotes Needed for WBS
|
||||
|
||||
- Constructability Review, etc.
|
||||
|
||||
- DAS Raceway Design
|
||||
|
||||
Thank you,
|
||||
@@ -16,6 +16,18 @@ dg-publish: true
|
||||
This note should be arranged chronologically:
|
||||
%%
|
||||
|
||||
%%
|
||||
## Requirement Sources
|
||||
|
||||
* Drawings
|
||||
* Project Manual (Specifications)
|
||||
* GC Narrative
|
||||
* GC verbal direction
|
||||
* Bid proposal
|
||||
* Bid verbal direction
|
||||
|
||||
%%
|
||||
|
||||
> [!important] Requirement Precedence
|
||||
> In case of conflict:
|
||||
> Requirements of the plans and specs
|
||||
|
||||
Reference in New Issue
Block a user