vault backup: 2026-02-11 14:33:37

This commit is contained in:
2026-02-11 14:33:37 -05:00
parent 53e48e9a69
commit e6dca57d5e
7 changed files with 3904 additions and 5 deletions
+2 -1
View File
@@ -24,5 +24,6 @@
"obsidian-tasks-plugin",
"digitalgarden",
"pdf-plus",
"obsidian-tracker"
"obsidian-tracker",
"copy-as-html"
]
+9
View File
@@ -50,5 +50,14 @@
],
"key": "S"
}
],
"copy-as-html:copy-as-html-command": [
{
"modifiers": [
"Mod",
"Shift"
],
"key": "C"
}
]
}
File diff suppressed because it is too large Load Diff
+10
View File
@@ -0,0 +1,10 @@
{
"id": "copy-as-html",
"name": "Copy as HTML",
"version": "1.1.3",
"minAppVersion": "0.12.0",
"description": "This is a simple plugin that converts the selected markdown to HTML and copies it to the clipboard.",
"author": "Bailey Jennings",
"authorUrl": "https://twitter.com/Bailey_Jennings",
"isDesktopOnly": false
}
+6 -4
View File
@@ -1,17 +1,19 @@
---
id:
aliases: []
title: "2026-02-10 15:49:04"
title: 2026-02-10 15:49:04
tags:
- authorship/original
- destiny/permanent
- occupational
- status/draft
- type/minutes
- type/periodic/timestamped
dg-publish: true
daily: "[[2026-02-10]]"
weekly: "[[2026-W07]]"
dg-publish: true
monthly: "[[2026-02]]"
quarterly: "[[2026-Q1]]"
weekly: "[[2026-W07]]"
yearly: "[[2026]]"
---
# 2026-02-10 15:49:04
@@ -72,4 +74,4 @@ He is as critical of overly-heavy estimates
as light estimates.
He specifically prefers accurate line item costs
with a single contingency
over inflated individual budgets.
over inflated individual budgets.
+118
View File
@@ -0,0 +1,118 @@
---
id:
aliases: []
title: "2026-02-11 12:12:16"
tags:
- authorship/original
- destiny/permanent
- status/draft
- type/periodic/timestamped
dg-publish: true
daily: "[[2026-02-11]]"
weekly: "[[2026-W07]]"
monthly: "[[2026-02]]"
quarterly: "[[2026-Q1]]"
yearly: "[[2026]]"
---
# 2026-02-11 12:12:16
Hello Team,
Below is a comprehensive list of means & methods for {Project Name}.
Please confirm you have received this email and respond with any questions or comments.
- Takeoff Request Stage:
<!-- Stage 1, Stage 1 + Units, Full takeoff -->
- Delivery Method:
<!-- Plans & Specs, Design Build, Design Assist, P&S with Approved VE -->
- Document Stage:
<!-- DD, CD, Permit, GMP, Bid, Awarded -->
- Drawings Date: <!-- Date -->
- Project Manual Date: <!-- Date -->
- Proposal Date: <!-- Date -->
### Project Specification Callouts
<!-- Put page of Drawing or PM after answer -->
- Conduit Execution Plans:
<!-- GRC, coupling specs, etc. -->
- Wire:
<!-- Copper or Aluminum, Acceptable Manufacturers -->
- {MC} Cable Application:
<!-- Branch homeruns only; Not permitted -->
- Steel Box Depth:
<!-- 1-1/2", 2-1/8" -->
- Floor Boxes:
- Box Material:
<!-- Box: PVC, Sheet metal, Cast iron -->
* Cover Material:
<!-- Covers: Brass, Aluminum -->
- Wiring Devices:
- Units:
<!-- 15A Decora -->
- BOH/Common Areas:
<!-- 20A Toggle/Duplex -->
- Switchboards/Panelboards:
<!-- Acceptable Manufacturers, AL or CU Bussing, Breaker Types (Snap-on, bolt on), ACI Ratings -->
- Transformers:
<!-- Windings AL or CU, K-rating -->
- Generator:
* Acceptable manufacturers:
* Enclosure Specs:
* Sound Rating:
* Remote Tank:
* Tank Size:
* Load Banks:
### Project Drawing/Detail Callouts
- Describe conflicts between drawings / proposal:
<!-- Plans show CU feeders, proposal calls for aluminum; Specification grade devices, etc. -->
- Cost drivers in details not shown elsewhere on plans:
- <!-- Assuming this refers to lighting control -->
### PDI System Execution Plan
- Primaries:
<!-- Installation only, (9) 6" PVC -->
- Secondaries:
<!-- PVC UG, GRC Stub-ups, AL -->
- Feeders:
<!-- PVC UG, EMT OH, AL over 100A, 2% VD -->
- Unit Subfeeds:
<!-- MC OH AL, VD per Chart on E5.01 -->
- Units:
<!-- 15A Decora, Insinkerators, T-stat, Floor Boxes, Shade Control, Doorbells, Dimmer Switches, etc. -->
- Telecom:
<!-- 42" MSDE, No Cable Homeruns, (1) 1" Back to IDF, CAT6 with Stub-ups -->
- EV Chargers:
<!-- (42) Conduit only, (56) Conduit & Wire, (20) Conduit, Wire & Equipment -->
- Fire Alarm: Devices PVC in-slab, Risers EMT.
<!-- Free-air where allowed by code. EMT Risers. -->
- DAS:
<!-- Conduit only, Per PDI DAS Design -->
- Low Voltage:
<!-- Free-air where allowed by code. Stub-ups to accessible ceilings. -->
### Lighting Control
- Scope:
<!-- Code Minimum per Energy Code Assigned, P&S, PDI Design -->
- Area: <!-- Assign Method to Areas: Line Voltage, Low-Voltage Stand Alone or Centralized System -->
- BOH:
- Corridor:
- Amenity:
- Site/Landscape:
- Garage Entry Point
- Office:
### Tasks/Quotes Needed for WBS
- Constructability Review, etc.
- DAS Raceway Design
Thank you,
+12
View File
@@ -16,6 +16,18 @@ dg-publish: true
This note should be arranged chronologically:
%%
%%
## Requirement Sources
* Drawings
* Project Manual (Specifications)
* GC Narrative
* GC verbal direction
* Bid proposal
* Bid verbal direction
%%
> [!important] Requirement Precedence
> In case of conflict:
> Requirements of the plans and specs