vault backup: 2025-10-02 07:37:00
This commit is contained in:
@@ -11,8 +11,8 @@ tags:
|
||||
|
||||
## Sequence
|
||||
|
||||
### 1. Estimate preparation
|
||||
### 1. Preparation
|
||||
|
||||
### 2. Takeoff
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
### 3. Review
|
||||
|
||||
+2
-2
@@ -33,7 +33,7 @@ and Occupant Evacuation Elevator Lobby Communications Systems.
|
||||
|
||||
## Sequence
|
||||
|
||||
### 1. Estimate preparation
|
||||
### 1. Preparation
|
||||
|
||||
Complete [[fire-alarm]] preparation and takeoff.
|
||||
|
||||
@@ -61,4 +61,4 @@ Complete [[fire-alarm]] preparation and takeoff.
|
||||
* Length: 15ft x per count
|
||||
* Count: match Horizontal
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
### 3. Review
|
||||
|
||||
@@ -1,15 +0,0 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags:
|
||||
- destiny/fleeting
|
||||
- topic/automation
|
||||
- topic/organization
|
||||
- topic/software
|
||||
- type/encyclopedia
|
||||
---
|
||||
# Automating Email
|
||||
|
||||
[Outlook Email Automation with PowerShell](https://devblogs.microsoft.com/premier-developer/outlook-email-automation-with-powershell)
|
||||
|
||||
[zmPSRepo/zmOutlookAutomation](https://github.com/ZaneMeyers/zmPSRepo/tree/main/zmOutlookAutomation/0.0.10)
|
||||
@@ -2,6 +2,7 @@
|
||||
id: construction-estimating-using-excel
|
||||
aliases: []
|
||||
tags:
|
||||
- destiny/uncertain
|
||||
- type/media-commentary
|
||||
---
|
||||
# _Construction Estimating Using Excel_
|
||||
|
||||
@@ -20,7 +20,7 @@ Less common than ERRCS are "cellular DAS" systems
|
||||
|
||||
## Sequence
|
||||
|
||||
### 1. Estimate preparation
|
||||
### 1. Preparation
|
||||
|
||||
Complete [[fire-alarm]] preparation and takeoff.
|
||||
|
||||
@@ -74,4 +74,4 @@ CA.28.31.21
|
||||
|
||||
Length for every corridor/garage
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
### 3. Review
|
||||
|
||||
@@ -2,6 +2,7 @@
|
||||
id: electrical-estimating-methods
|
||||
aliases: []
|
||||
tags:
|
||||
- destiny/uncertain
|
||||
- type/media-commentary
|
||||
---
|
||||
# _Electrical Estimating Methods_
|
||||
|
||||
@@ -2,6 +2,7 @@
|
||||
id: electrical-estimators-manual
|
||||
aliases: []
|
||||
tags:
|
||||
- destiny/uncertain
|
||||
- type/media-commentary
|
||||
---
|
||||
# _Electrical Estimators Manual_
|
||||
|
||||
+2
-2
@@ -26,7 +26,7 @@ Wiring devices and their wall plates are a common target of [[gold-plating]].
|
||||
|
||||
## Sequence
|
||||
|
||||
### 1. Estimate preparation
|
||||
### 1. Preparation
|
||||
|
||||
1. Read about the project specifications and construction type
|
||||
2. Locate Equipment Schedules
|
||||
@@ -65,6 +65,6 @@ Vertical (Riser):
|
||||
* Takeoff in Typical
|
||||
* Length = average floor to floor height
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
### 3. Review
|
||||
|
||||
1. Count Car chargers and location
|
||||
|
||||
+2
-2
@@ -60,7 +60,7 @@ All feeder takeoff descriptions should be prefixed with `<parent> TO <child>`
|
||||
|
||||
## Sequence
|
||||
|
||||
### 1. Estimate preparation
|
||||
### 1. Preparation
|
||||
|
||||
Read about the project specifications and construction type:
|
||||
* Deck thickness
|
||||
@@ -148,4 +148,4 @@ See [[grounding]].
|
||||
|
||||
See [[sleeving]].
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
### 3. Review
|
||||
|
||||
+2
-2
@@ -11,7 +11,7 @@ tags:
|
||||
|
||||
## Sequence
|
||||
|
||||
### 1. Estimate preparation
|
||||
### 1. Preparation
|
||||
|
||||
1. Initial the OneNote
|
||||
2. Read about the project specifications and construction type
|
||||
@@ -156,6 +156,6 @@ and Electrical
|
||||
|
||||
`COMMON ASSEMBLIES`/`MECHANICAL CONNECTIONS (UP TO 100A)`/.../...
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
### 3. Review
|
||||
|
||||
* Sleeving
|
||||
|
||||
+2
-2
@@ -11,7 +11,7 @@ tags:
|
||||
|
||||
## Sequence
|
||||
|
||||
### 1. Estimate preparation
|
||||
### 1. Preparation
|
||||
|
||||
1. Read about the project specifications and construction type
|
||||
2. In drawings, locate:
|
||||
@@ -25,7 +25,7 @@ See [[fixture-designations]].
|
||||
1. Takeoff floor plans in order
|
||||
2. Takeoff enlarged drawings
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
### 3. Review
|
||||
|
||||
1. Garage Homeruns
|
||||
2. Luminaire in Amenity Areas
|
||||
|
||||
+2
-2
@@ -13,7 +13,7 @@ tags:
|
||||
|
||||
## Sequence
|
||||
|
||||
### 1. Estimate preparation
|
||||
### 1. Preparation
|
||||
|
||||
1. [[project-setup]]
|
||||
2. [[pre-takeoff-confirmation]]
|
||||
@@ -37,6 +37,6 @@ tags:
|
||||
10. [[standalone-systems]]
|
||||
11. [[misc-budgets]]
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
### 3. Review
|
||||
|
||||
1. [[material-pricing]]
|
||||
|
||||
+2
-2
@@ -17,7 +17,7 @@ not especially consistent with the actual install.
|
||||
|
||||
## Sequence
|
||||
|
||||
### 1. Estimate preparation
|
||||
### 1. Preparation
|
||||
|
||||
Locate:
|
||||
* Main electric room (service entrance)
|
||||
@@ -55,4 +55,4 @@ Use only where shown.
|
||||
|
||||
`COMMON ASSEMBLIES`/`GROUNDING`/`TELE/DATA GND BRIDGE, ..., W/ COVER & (60') #6 THHN GREEN`
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
### 3. Review
|
||||
|
||||
+2
-2
@@ -32,7 +32,7 @@ how many devices (if any)
|
||||
|
||||
## Sequence
|
||||
|
||||
### 1. Estimate preparation
|
||||
### 1. Preparation
|
||||
|
||||
1. Locate Proposal/Scope of Work. Determine ownership and takeoff responsibility:
|
||||
* Cabling
|
||||
@@ -49,6 +49,6 @@ how many devices (if any)
|
||||
1. Takeoff devices as shown throughout the building
|
||||
2. Takeoff riser conduit as needed
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
### 3. Review
|
||||
|
||||
1. Sleeving for riser
|
||||
|
||||
@@ -1,32 +0,0 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags:
|
||||
- destiny/fleeting
|
||||
- topic/automation
|
||||
- topic/software
|
||||
- type/idea
|
||||
---
|
||||
# Markdown Formatter CLI
|
||||
|
||||
create a custom markdown formatter to implement desired features.
|
||||
|
||||
## Character Substitution
|
||||
|
||||
* em dashes to `--`
|
||||
* curved quotes to straight
|
||||
|
||||
## Semantic Line Breaks
|
||||
|
||||
Join inappropriately split clauses.
|
||||
|
||||
Always split on certain syntax:
|
||||
* full stop
|
||||
|
||||
Conditionally split in other cases
|
||||
to prevent column overflow
|
||||
|
||||
```
|
||||
(?<=\.) (?=.{30,})
|
||||
(?<=,) (?=.{30,})
|
||||
```
|
||||
+2
-2
@@ -37,8 +37,8 @@ PDI pricing takes precedence where available.
|
||||
|
||||
## Sequence
|
||||
|
||||
### 1. Estimate preparation
|
||||
### 1. Preparation
|
||||
|
||||
### 2. Takeoff
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
### 3. Review
|
||||
|
||||
@@ -4,6 +4,7 @@ aliases: []
|
||||
tags:
|
||||
- topic/electrical
|
||||
- topic/estimating
|
||||
- destiny/uncertain
|
||||
- type/media-commentary
|
||||
---
|
||||
# _Mike Holt's Illustrated Guide to Electrical Estimating_
|
||||
|
||||
+7
-1
@@ -9,6 +9,12 @@ tags:
|
||||
|
||||
## Info
|
||||
|
||||
## Sequence
|
||||
|
||||
### 1. Preparation
|
||||
|
||||
### 2. Takeoff
|
||||
|
||||
Provide sleeves for all feeder conduits passing through floors.
|
||||
|
||||
`ITEM DATABASE`/`HILTI`/`CAST-IN DEVICE CP 680-...`
|
||||
@@ -16,4 +22,4 @@ Provide sleeves for all feeder conduits passing through floors.
|
||||
* Concrete => P (Plastic - Combustible)
|
||||
* Wood Framed => M (Metal - Non-Combustible)
|
||||
|
||||
## Sequence
|
||||
### 3. Review
|
||||
|
||||
@@ -11,7 +11,7 @@ tags:
|
||||
|
||||
## Sequence
|
||||
|
||||
### 1. Estimate preparation
|
||||
### 1. Preparation
|
||||
|
||||
### 2. Takeoff
|
||||
|
||||
@@ -19,4 +19,4 @@ tags:
|
||||
2. [[area-of-refuge]]
|
||||
3. [[lightning-protection]]
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
### 3. Review
|
||||
|
||||
+2
-2
@@ -9,7 +9,7 @@ tags:
|
||||
|
||||
## Sequence
|
||||
|
||||
### 1. Estimate preparation
|
||||
### 1. Preparation
|
||||
|
||||
1. Read about the project specifications and construction type
|
||||
* Delivery Method: (Plans & Specs, Design Build, Design Assist, Preliminary Budget)
|
||||
@@ -80,6 +80,6 @@ Only for PVC subfeeds where we own voltage drop.
|
||||
|
||||
`ITEM DATABASE`/`DISTRIBUTION`/`BUDGET ITEMS $ & LBR`/`METER CENTER WIRE TROUGH ($400/E)`
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
### 3. Review
|
||||
|
||||
1. Use the extension tab to determine the Correct Quantity
|
||||
|
||||
+2
-2
@@ -33,7 +33,7 @@ Performance Areas, and Similar Locations**
|
||||
|
||||
## Sequence
|
||||
|
||||
### 1. Estimate preparation
|
||||
### 1. Preparation
|
||||
|
||||
1. Initial the OneNote
|
||||
2. In the drawings, locate:
|
||||
@@ -122,7 +122,7 @@ Use 1200A MTS/ATS, and add:
|
||||
|
||||
Adjust Factor 1 for meter stacks, delete zeroed items.
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
### 3. Review
|
||||
|
||||
1. Generator
|
||||
* Ensure takeoff is in the generator Area and System breakdowns
|
||||
|
||||
+2
-2
@@ -17,7 +17,7 @@ Not to be confused with [[low-voltage]].
|
||||
|
||||
## Sequence
|
||||
|
||||
### 1. Estimate preparation
|
||||
### 1. Preparation
|
||||
|
||||
#### Riser
|
||||
|
||||
@@ -141,6 +141,6 @@ CA.27.8.6/7
|
||||
CA.22.7
|
||||
* Parts: 2 Boxes, EMT Stub, 1 J-hook/per 6'
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
### 3. Review
|
||||
|
||||
1. Sleeving
|
||||
|
||||
@@ -2,6 +2,7 @@
|
||||
id: the-failure-of-risk-management
|
||||
aliases: []
|
||||
tags:
|
||||
- destiny/uncertain
|
||||
- type/media-commentary
|
||||
---
|
||||
# _The Failure of Risk Management_
|
||||
|
||||
@@ -39,7 +39,7 @@ tags:
|
||||
|
||||
## Sequence
|
||||
|
||||
### 1. Estimate preparation
|
||||
### 1. Preparation
|
||||
|
||||
1. Locate Unit panels and relevant keynotes
|
||||
* bus amps
|
||||
@@ -148,6 +148,6 @@ For ADA units:
|
||||
|
||||
==use free air devices==
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
### 3. Review
|
||||
|
||||
1. Scroll through with Area selected and make sure there is takeoff for each unit type
|
||||
|
||||
Reference in New Issue
Block a user