@@ -11,8 +11,8 @@ tags:
## Sequence
### 1. Estimate preparation
### 1. Preparation
### 2. Takeoff
### 3. Extension (Review and Checking)
### 3. Review
+2 -2
View File
@@ -33,7 +33,7 @@ and Occupant Evacuation Elevator Lobby Communications Systems.
## Sequence
### 1. Estimate preparation
### 1. Preparation
Complete [[fire-alarm]] preparation and takeoff.
@@ -61,4 +61,4 @@ Complete [[fire-alarm]] preparation and takeoff.
* Length: 15ft x per count
* Count: match Horizontal
### 3. Extension (Review and Checking)
### 3. Review
-15
View File
@@ -1,15 +0,0 @@
---
id:
aliases: []
tags:
- destiny/fleeting
- topic/automation
- topic/organization
- topic/software
- type/encyclopedia
---
# Automating Email
[Outlook Email Automation with PowerShell](https://devblogs.microsoft.com/premier-developer/outlook-email-automation-with-powershell)
[zmPSRepo/zmOutlookAutomation](https://github.com/ZaneMeyers/zmPSRepo/tree/main/zmOutlookAutomation/0.0.10)
+1
View File
@@ -2,6 +2,7 @@
id: construction-estimating-using-excel
aliases: []
tags:
- destiny/uncertain
- type/media-commentary
---
# _Construction Estimating Using Excel_
+2 -2
View File
@@ -20,7 +20,7 @@ Less common than ERRCS are "cellular DAS" systems
## Sequence
### 1. Estimate preparation
### 1. Preparation
Complete [[fire-alarm]] preparation and takeoff.
@@ -74,4 +74,4 @@ CA.28.31.21
Length for every corridor/garage
### 3. Extension (Review and Checking)
### 3. Review
+1
View File
@@ -2,6 +2,7 @@
id: electrical-estimating-methods
aliases: []
tags:
- destiny/uncertain
- type/media-commentary
---
# _Electrical Estimating Methods_
+1
View File
@@ -2,6 +2,7 @@
id: electrical-estimators-manual
aliases: []
tags:
- destiny/uncertain
- type/media-commentary
---
# _Electrical Estimators Manual_
+2 -2
View File
@@ -26,7 +26,7 @@ Wiring devices and their wall plates are a common target of [[gold-plating]].
## Sequence
### 1. Estimate preparation
### 1. Preparation
1. Read about the project specifications and construction type
2. Locate Equipment Schedules
@@ -65,6 +65,6 @@ Vertical (Riser):
* Takeoff in Typical
* Length = average floor to floor height
### 3. Extension (Review and Checking)
### 3. Review
1. Count Car chargers and location
+2 -2
View File
@@ -60,7 +60,7 @@ All feeder takeoff descriptions should be prefixed with `<parent> TO <child>`
## Sequence
### 1. Estimate preparation
### 1. Preparation
Read about the project specifications and construction type:
* Deck thickness
@@ -148,4 +148,4 @@ See [[grounding]].
See [[sleeving]].
### 3. Extension (Review and Checking)
### 3. Review
+2 -2
View File
@@ -11,7 +11,7 @@ tags:
## Sequence
### 1. Estimate preparation
### 1. Preparation
1. Initial the OneNote
2. Read about the project specifications and construction type
@@ -156,6 +156,6 @@ and Electrical
`COMMON ASSEMBLIES`/`MECHANICAL CONNECTIONS (UP TO 100A)`/.../...
### 3. Extension (Review and Checking)
### 3. Review
* Sleeving
+2 -2
View File
@@ -11,7 +11,7 @@ tags:
## Sequence
### 1. Estimate preparation
### 1. Preparation
1. Read about the project specifications and construction type
2. In drawings, locate:
@@ -25,7 +25,7 @@ See [[fixture-designations]].
1. Takeoff floor plans in order
2. Takeoff enlarged drawings
### 3. Extension (Review and Checking)
### 3. Review
1. Garage Homeruns
2. Luminaire in Amenity Areas
+2 -2
View File
@@ -13,7 +13,7 @@ tags:
## Sequence
### 1. Estimate preparation
### 1. Preparation
1. [[project-setup]]
2. [[pre-takeoff-confirmation]]
@@ -37,6 +37,6 @@ tags:
10. [[standalone-systems]]
11. [[misc-budgets]]
### 3. Extension (Review and Checking)
### 3. Review
1. [[material-pricing]]
+2 -2
View File
@@ -17,7 +17,7 @@ not especially consistent with the actual install.
## Sequence
### 1. Estimate preparation
### 1. Preparation
Locate:
* Main electric room (service entrance)
@@ -55,4 +55,4 @@ Use only where shown.
`COMMON ASSEMBLIES`/`GROUNDING`/`TELE/DATA GND BRIDGE, ..., W/ COVER & (60') #6 THHN GREEN`
### 3. Extension (Review and Checking)
### 3. Review
+2 -2
View File
@@ -32,7 +32,7 @@ how many devices (if any)
## Sequence
### 1. Estimate preparation
### 1. Preparation
1. Locate Proposal/Scope of Work. Determine ownership and takeoff responsibility:
* Cabling
@@ -49,6 +49,6 @@ how many devices (if any)
1. Takeoff devices as shown throughout the building
2. Takeoff riser conduit as needed
### 3. Extension (Review and Checking)
### 3. Review
1. Sleeving for riser
-32
View File
@@ -1,32 +0,0 @@
---
id:
aliases: []
tags:
- destiny/fleeting
- topic/automation
- topic/software
- type/idea
---
# Markdown Formatter CLI
create a custom markdown formatter to implement desired features.
## Character Substitution
* em dashes to `--`
* curved quotes to straight
## Semantic Line Breaks
Join inappropriately split clauses.
Always split on certain syntax:
* full stop
Conditionally split in other cases
to prevent column overflow
```
(?<=\.) (?=.{30,})
(?<=,) (?=.{30,})
```
+2 -2
View File
@@ -37,8 +37,8 @@ PDI pricing takes precedence where available.
## Sequence
### 1. Estimate preparation
### 1. Preparation
### 2. Takeoff
### 3. Extension (Review and Checking)
### 3. Review
@@ -4,6 +4,7 @@ aliases: []
tags:
- topic/electrical
- topic/estimating
- destiny/uncertain
- type/media-commentary
---
# _Mike Holt's Illustrated Guide to Electrical Estimating_
+7 -1
View File
@@ -9,6 +9,12 @@ tags:
## Info
## Sequence
### 1. Preparation
### 2. Takeoff
Provide sleeves for all feeder conduits passing through floors.
`ITEM DATABASE`/`HILTI`/`CAST-IN DEVICE CP 680-...`
@@ -16,4 +22,4 @@ Provide sleeves for all feeder conduits passing through floors.
* Concrete => P (Plastic - Combustible)
* Wood Framed => M (Metal - Non-Combustible)
## Sequence
### 3. Review
+2 -2
View File
@@ -11,7 +11,7 @@ tags:
## Sequence
### 1. Estimate preparation
### 1. Preparation
### 2. Takeoff
@@ -19,4 +19,4 @@ tags:
2. [[area-of-refuge]]
3. [[lightning-protection]]
### 3. Extension (Review and Checking)
### 3. Review
+2 -2
View File
@@ -9,7 +9,7 @@ tags:
## Sequence
### 1. Estimate preparation
### 1. Preparation
1. Read about the project specifications and construction type
* Delivery Method: (Plans & Specs, Design Build, Design Assist, Preliminary Budget)
@@ -80,6 +80,6 @@ Only for PVC subfeeds where we own voltage drop.
`ITEM DATABASE`/`DISTRIBUTION`/`BUDGET ITEMS $ & LBR`/`METER CENTER WIRE TROUGH ($400/E)`
### 3. Extension (Review and Checking)
### 3. Review
1. Use the extension tab to determine the Correct Quantity
+2 -2
View File
@@ -33,7 +33,7 @@ Performance Areas, and Similar Locations**
## Sequence
### 1. Estimate preparation
### 1. Preparation
1. Initial the OneNote
2. In the drawings, locate:
@@ -122,7 +122,7 @@ Use 1200A MTS/ATS, and add:
Adjust Factor 1 for meter stacks, delete zeroed items.
### 3. Extension (Review and Checking)
### 3. Review
1. Generator
* Ensure takeoff is in the generator Area and System breakdowns
+2 -2
View File
@@ -17,7 +17,7 @@ Not to be confused with [[low-voltage]].
## Sequence
### 1. Estimate preparation
### 1. Preparation
#### Riser
@@ -141,6 +141,6 @@ CA.27.8.6/7
CA.22.7
* Parts: 2 Boxes, EMT Stub, 1 J-hook/per 6'
### 3. Extension (Review and Checking)
### 3. Review
1. Sleeving
+1
View File
@@ -2,6 +2,7 @@
id: the-failure-of-risk-management
aliases: []
tags:
- destiny/uncertain
- type/media-commentary
---
# _The Failure of Risk Management_
+2 -2
View File
@@ -39,7 +39,7 @@ tags:
## Sequence
### 1. Estimate preparation
### 1. Preparation
1. Locate Unit panels and relevant keynotes
* bus amps
@@ -148,6 +148,6 @@ For ADA units:
==use free air devices==
### 3. Extension (Review and Checking)
### 3. Review
1. Scroll through with Area selected and make sure there is takeoff for each unit type