vault backup: 2025-10-02 07:37:00
This commit is contained in:
+2
-2
@@ -11,7 +11,7 @@ tags:
|
||||
|
||||
## Sequence
|
||||
|
||||
### 1. Estimate preparation
|
||||
### 1. Preparation
|
||||
|
||||
1. Read about the project specifications and construction type
|
||||
2. In drawings, locate:
|
||||
@@ -25,7 +25,7 @@ See [[fixture-designations]].
|
||||
1. Takeoff floor plans in order
|
||||
2. Takeoff enlarged drawings
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
### 3. Review
|
||||
|
||||
1. Garage Homeruns
|
||||
2. Luminaire in Amenity Areas
|
||||
|
||||
Reference in New Issue
Block a user