## Sequence
|
||||
|
||||
### 1. Estimate preparation
|
||||
### 1. Preparation
|
||||
|
||||
1. Read about the project specifications and construction type
|
||||
* Delivery Method: (Plans & Specs, Design Build, Design Assist, Preliminary Budget)
|
||||
@@ -80,6 +80,6 @@ Only for PVC subfeeds where we own voltage drop.
|
||||
|
||||
`ITEM DATABASE`/`DISTRIBUTION`/`BUDGET ITEMS $ & LBR`/`METER CENTER WIRE TROUGH ($400/E)`
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
### 3. Review
|
||||
|
||||
1. Use the extension tab to determine the Correct Quantity
|
||||
|
||||