vault backup: 2025-10-02 07:37:00
This commit is contained in:
@@ -11,8 +11,8 @@ tags:
|
|||||||
|
|
||||||
## Sequence
|
## Sequence
|
||||||
|
|
||||||
### 1. Estimate preparation
|
### 1. Preparation
|
||||||
|
|
||||||
### 2. Takeoff
|
### 2. Takeoff
|
||||||
|
|
||||||
### 3. Extension (Review and Checking)
|
### 3. Review
|
||||||
|
|||||||
+2
-2
@@ -33,7 +33,7 @@ and Occupant Evacuation Elevator Lobby Communications Systems.
|
|||||||
|
|
||||||
## Sequence
|
## Sequence
|
||||||
|
|
||||||
### 1. Estimate preparation
|
### 1. Preparation
|
||||||
|
|
||||||
Complete [[fire-alarm]] preparation and takeoff.
|
Complete [[fire-alarm]] preparation and takeoff.
|
||||||
|
|
||||||
@@ -61,4 +61,4 @@ Complete [[fire-alarm]] preparation and takeoff.
|
|||||||
* Length: 15ft x per count
|
* Length: 15ft x per count
|
||||||
* Count: match Horizontal
|
* Count: match Horizontal
|
||||||
|
|
||||||
### 3. Extension (Review and Checking)
|
### 3. Review
|
||||||
|
|||||||
@@ -1,15 +0,0 @@
|
|||||||
---
|
|
||||||
id:
|
|
||||||
aliases: []
|
|
||||||
tags:
|
|
||||||
- destiny/fleeting
|
|
||||||
- topic/automation
|
|
||||||
- topic/organization
|
|
||||||
- topic/software
|
|
||||||
- type/encyclopedia
|
|
||||||
---
|
|
||||||
# Automating Email
|
|
||||||
|
|
||||||
[Outlook Email Automation with PowerShell](https://devblogs.microsoft.com/premier-developer/outlook-email-automation-with-powershell)
|
|
||||||
|
|
||||||
[zmPSRepo/zmOutlookAutomation](https://github.com/ZaneMeyers/zmPSRepo/tree/main/zmOutlookAutomation/0.0.10)
|
|
||||||
@@ -2,6 +2,7 @@
|
|||||||
id: construction-estimating-using-excel
|
id: construction-estimating-using-excel
|
||||||
aliases: []
|
aliases: []
|
||||||
tags:
|
tags:
|
||||||
|
- destiny/uncertain
|
||||||
- type/media-commentary
|
- type/media-commentary
|
||||||
---
|
---
|
||||||
# _Construction Estimating Using Excel_
|
# _Construction Estimating Using Excel_
|
||||||
|
|||||||
@@ -20,7 +20,7 @@ Less common than ERRCS are "cellular DAS" systems
|
|||||||
|
|
||||||
## Sequence
|
## Sequence
|
||||||
|
|
||||||
### 1. Estimate preparation
|
### 1. Preparation
|
||||||
|
|
||||||
Complete [[fire-alarm]] preparation and takeoff.
|
Complete [[fire-alarm]] preparation and takeoff.
|
||||||
|
|
||||||
@@ -74,4 +74,4 @@ CA.28.31.21
|
|||||||
|
|
||||||
Length for every corridor/garage
|
Length for every corridor/garage
|
||||||
|
|
||||||
### 3. Extension (Review and Checking)
|
### 3. Review
|
||||||
|
|||||||
@@ -2,6 +2,7 @@
|
|||||||
id: electrical-estimating-methods
|
id: electrical-estimating-methods
|
||||||
aliases: []
|
aliases: []
|
||||||
tags:
|
tags:
|
||||||
|
- destiny/uncertain
|
||||||
- type/media-commentary
|
- type/media-commentary
|
||||||
---
|
---
|
||||||
# _Electrical Estimating Methods_
|
# _Electrical Estimating Methods_
|
||||||
|
|||||||
@@ -2,6 +2,7 @@
|
|||||||
id: electrical-estimators-manual
|
id: electrical-estimators-manual
|
||||||
aliases: []
|
aliases: []
|
||||||
tags:
|
tags:
|
||||||
|
- destiny/uncertain
|
||||||
- type/media-commentary
|
- type/media-commentary
|
||||||
---
|
---
|
||||||
# _Electrical Estimators Manual_
|
# _Electrical Estimators Manual_
|
||||||
|
|||||||
+2
-2
@@ -26,7 +26,7 @@ Wiring devices and their wall plates are a common target of [[gold-plating]].
|
|||||||
|
|
||||||
## Sequence
|
## Sequence
|
||||||
|
|
||||||
### 1. Estimate preparation
|
### 1. Preparation
|
||||||
|
|
||||||
1. Read about the project specifications and construction type
|
1. Read about the project specifications and construction type
|
||||||
2. Locate Equipment Schedules
|
2. Locate Equipment Schedules
|
||||||
@@ -65,6 +65,6 @@ Vertical (Riser):
|
|||||||
* Takeoff in Typical
|
* Takeoff in Typical
|
||||||
* Length = average floor to floor height
|
* Length = average floor to floor height
|
||||||
|
|
||||||
### 3. Extension (Review and Checking)
|
### 3. Review
|
||||||
|
|
||||||
1. Count Car chargers and location
|
1. Count Car chargers and location
|
||||||
|
|||||||
+2
-2
@@ -60,7 +60,7 @@ All feeder takeoff descriptions should be prefixed with `<parent> TO <child>`
|
|||||||
|
|
||||||
## Sequence
|
## Sequence
|
||||||
|
|
||||||
### 1. Estimate preparation
|
### 1. Preparation
|
||||||
|
|
||||||
Read about the project specifications and construction type:
|
Read about the project specifications and construction type:
|
||||||
* Deck thickness
|
* Deck thickness
|
||||||
@@ -148,4 +148,4 @@ See [[grounding]].
|
|||||||
|
|
||||||
See [[sleeving]].
|
See [[sleeving]].
|
||||||
|
|
||||||
### 3. Extension (Review and Checking)
|
### 3. Review
|
||||||
|
|||||||
+2
-2
@@ -11,7 +11,7 @@ tags:
|
|||||||
|
|
||||||
## Sequence
|
## Sequence
|
||||||
|
|
||||||
### 1. Estimate preparation
|
### 1. Preparation
|
||||||
|
|
||||||
1. Initial the OneNote
|
1. Initial the OneNote
|
||||||
2. Read about the project specifications and construction type
|
2. Read about the project specifications and construction type
|
||||||
@@ -156,6 +156,6 @@ and Electrical
|
|||||||
|
|
||||||
`COMMON ASSEMBLIES`/`MECHANICAL CONNECTIONS (UP TO 100A)`/.../...
|
`COMMON ASSEMBLIES`/`MECHANICAL CONNECTIONS (UP TO 100A)`/.../...
|
||||||
|
|
||||||
### 3. Extension (Review and Checking)
|
### 3. Review
|
||||||
|
|
||||||
* Sleeving
|
* Sleeving
|
||||||
|
|||||||
+2
-2
@@ -11,7 +11,7 @@ tags:
|
|||||||
|
|
||||||
## Sequence
|
## Sequence
|
||||||
|
|
||||||
### 1. Estimate preparation
|
### 1. Preparation
|
||||||
|
|
||||||
1. Read about the project specifications and construction type
|
1. Read about the project specifications and construction type
|
||||||
2. In drawings, locate:
|
2. In drawings, locate:
|
||||||
@@ -25,7 +25,7 @@ See [[fixture-designations]].
|
|||||||
1. Takeoff floor plans in order
|
1. Takeoff floor plans in order
|
||||||
2. Takeoff enlarged drawings
|
2. Takeoff enlarged drawings
|
||||||
|
|
||||||
### 3. Extension (Review and Checking)
|
### 3. Review
|
||||||
|
|
||||||
1. Garage Homeruns
|
1. Garage Homeruns
|
||||||
2. Luminaire in Amenity Areas
|
2. Luminaire in Amenity Areas
|
||||||
|
|||||||
+2
-2
@@ -13,7 +13,7 @@ tags:
|
|||||||
|
|
||||||
## Sequence
|
## Sequence
|
||||||
|
|
||||||
### 1. Estimate preparation
|
### 1. Preparation
|
||||||
|
|
||||||
1. [[project-setup]]
|
1. [[project-setup]]
|
||||||
2. [[pre-takeoff-confirmation]]
|
2. [[pre-takeoff-confirmation]]
|
||||||
@@ -37,6 +37,6 @@ tags:
|
|||||||
10. [[standalone-systems]]
|
10. [[standalone-systems]]
|
||||||
11. [[misc-budgets]]
|
11. [[misc-budgets]]
|
||||||
|
|
||||||
### 3. Extension (Review and Checking)
|
### 3. Review
|
||||||
|
|
||||||
1. [[material-pricing]]
|
1. [[material-pricing]]
|
||||||
|
|||||||
+2
-2
@@ -17,7 +17,7 @@ not especially consistent with the actual install.
|
|||||||
|
|
||||||
## Sequence
|
## Sequence
|
||||||
|
|
||||||
### 1. Estimate preparation
|
### 1. Preparation
|
||||||
|
|
||||||
Locate:
|
Locate:
|
||||||
* Main electric room (service entrance)
|
* Main electric room (service entrance)
|
||||||
@@ -55,4 +55,4 @@ Use only where shown.
|
|||||||
|
|
||||||
`COMMON ASSEMBLIES`/`GROUNDING`/`TELE/DATA GND BRIDGE, ..., W/ COVER & (60') #6 THHN GREEN`
|
`COMMON ASSEMBLIES`/`GROUNDING`/`TELE/DATA GND BRIDGE, ..., W/ COVER & (60') #6 THHN GREEN`
|
||||||
|
|
||||||
### 3. Extension (Review and Checking)
|
### 3. Review
|
||||||
|
|||||||
+2
-2
@@ -32,7 +32,7 @@ how many devices (if any)
|
|||||||
|
|
||||||
## Sequence
|
## Sequence
|
||||||
|
|
||||||
### 1. Estimate preparation
|
### 1. Preparation
|
||||||
|
|
||||||
1. Locate Proposal/Scope of Work. Determine ownership and takeoff responsibility:
|
1. Locate Proposal/Scope of Work. Determine ownership and takeoff responsibility:
|
||||||
* Cabling
|
* Cabling
|
||||||
@@ -49,6 +49,6 @@ how many devices (if any)
|
|||||||
1. Takeoff devices as shown throughout the building
|
1. Takeoff devices as shown throughout the building
|
||||||
2. Takeoff riser conduit as needed
|
2. Takeoff riser conduit as needed
|
||||||
|
|
||||||
### 3. Extension (Review and Checking)
|
### 3. Review
|
||||||
|
|
||||||
1. Sleeving for riser
|
1. Sleeving for riser
|
||||||
|
|||||||
@@ -1,32 +0,0 @@
|
|||||||
---
|
|
||||||
id:
|
|
||||||
aliases: []
|
|
||||||
tags:
|
|
||||||
- destiny/fleeting
|
|
||||||
- topic/automation
|
|
||||||
- topic/software
|
|
||||||
- type/idea
|
|
||||||
---
|
|
||||||
# Markdown Formatter CLI
|
|
||||||
|
|
||||||
create a custom markdown formatter to implement desired features.
|
|
||||||
|
|
||||||
## Character Substitution
|
|
||||||
|
|
||||||
* em dashes to `--`
|
|
||||||
* curved quotes to straight
|
|
||||||
|
|
||||||
## Semantic Line Breaks
|
|
||||||
|
|
||||||
Join inappropriately split clauses.
|
|
||||||
|
|
||||||
Always split on certain syntax:
|
|
||||||
* full stop
|
|
||||||
|
|
||||||
Conditionally split in other cases
|
|
||||||
to prevent column overflow
|
|
||||||
|
|
||||||
```
|
|
||||||
(?<=\.) (?=.{30,})
|
|
||||||
(?<=,) (?=.{30,})
|
|
||||||
```
|
|
||||||
+2
-2
@@ -37,8 +37,8 @@ PDI pricing takes precedence where available.
|
|||||||
|
|
||||||
## Sequence
|
## Sequence
|
||||||
|
|
||||||
### 1. Estimate preparation
|
### 1. Preparation
|
||||||
|
|
||||||
### 2. Takeoff
|
### 2. Takeoff
|
||||||
|
|
||||||
### 3. Extension (Review and Checking)
|
### 3. Review
|
||||||
|
|||||||
@@ -4,6 +4,7 @@ aliases: []
|
|||||||
tags:
|
tags:
|
||||||
- topic/electrical
|
- topic/electrical
|
||||||
- topic/estimating
|
- topic/estimating
|
||||||
|
- destiny/uncertain
|
||||||
- type/media-commentary
|
- type/media-commentary
|
||||||
---
|
---
|
||||||
# _Mike Holt's Illustrated Guide to Electrical Estimating_
|
# _Mike Holt's Illustrated Guide to Electrical Estimating_
|
||||||
|
|||||||
+7
-1
@@ -9,6 +9,12 @@ tags:
|
|||||||
|
|
||||||
## Info
|
## Info
|
||||||
|
|
||||||
|
## Sequence
|
||||||
|
|
||||||
|
### 1. Preparation
|
||||||
|
|
||||||
|
### 2. Takeoff
|
||||||
|
|
||||||
Provide sleeves for all feeder conduits passing through floors.
|
Provide sleeves for all feeder conduits passing through floors.
|
||||||
|
|
||||||
`ITEM DATABASE`/`HILTI`/`CAST-IN DEVICE CP 680-...`
|
`ITEM DATABASE`/`HILTI`/`CAST-IN DEVICE CP 680-...`
|
||||||
@@ -16,4 +22,4 @@ Provide sleeves for all feeder conduits passing through floors.
|
|||||||
* Concrete => P (Plastic - Combustible)
|
* Concrete => P (Plastic - Combustible)
|
||||||
* Wood Framed => M (Metal - Non-Combustible)
|
* Wood Framed => M (Metal - Non-Combustible)
|
||||||
|
|
||||||
## Sequence
|
### 3. Review
|
||||||
|
|||||||
@@ -11,7 +11,7 @@ tags:
|
|||||||
|
|
||||||
## Sequence
|
## Sequence
|
||||||
|
|
||||||
### 1. Estimate preparation
|
### 1. Preparation
|
||||||
|
|
||||||
### 2. Takeoff
|
### 2. Takeoff
|
||||||
|
|
||||||
@@ -19,4 +19,4 @@ tags:
|
|||||||
2. [[area-of-refuge]]
|
2. [[area-of-refuge]]
|
||||||
3. [[lightning-protection]]
|
3. [[lightning-protection]]
|
||||||
|
|
||||||
### 3. Extension (Review and Checking)
|
### 3. Review
|
||||||
|
|||||||
+2
-2
@@ -9,7 +9,7 @@ tags:
|
|||||||
|
|
||||||
## Sequence
|
## Sequence
|
||||||
|
|
||||||
### 1. Estimate preparation
|
### 1. Preparation
|
||||||
|
|
||||||
1. Read about the project specifications and construction type
|
1. Read about the project specifications and construction type
|
||||||
* Delivery Method: (Plans & Specs, Design Build, Design Assist, Preliminary Budget)
|
* Delivery Method: (Plans & Specs, Design Build, Design Assist, Preliminary Budget)
|
||||||
@@ -80,6 +80,6 @@ Only for PVC subfeeds where we own voltage drop.
|
|||||||
|
|
||||||
`ITEM DATABASE`/`DISTRIBUTION`/`BUDGET ITEMS $ & LBR`/`METER CENTER WIRE TROUGH ($400/E)`
|
`ITEM DATABASE`/`DISTRIBUTION`/`BUDGET ITEMS $ & LBR`/`METER CENTER WIRE TROUGH ($400/E)`
|
||||||
|
|
||||||
### 3. Extension (Review and Checking)
|
### 3. Review
|
||||||
|
|
||||||
1. Use the extension tab to determine the Correct Quantity
|
1. Use the extension tab to determine the Correct Quantity
|
||||||
|
|||||||
+2
-2
@@ -33,7 +33,7 @@ Performance Areas, and Similar Locations**
|
|||||||
|
|
||||||
## Sequence
|
## Sequence
|
||||||
|
|
||||||
### 1. Estimate preparation
|
### 1. Preparation
|
||||||
|
|
||||||
1. Initial the OneNote
|
1. Initial the OneNote
|
||||||
2. In the drawings, locate:
|
2. In the drawings, locate:
|
||||||
@@ -122,7 +122,7 @@ Use 1200A MTS/ATS, and add:
|
|||||||
|
|
||||||
Adjust Factor 1 for meter stacks, delete zeroed items.
|
Adjust Factor 1 for meter stacks, delete zeroed items.
|
||||||
|
|
||||||
### 3. Extension (Review and Checking)
|
### 3. Review
|
||||||
|
|
||||||
1. Generator
|
1. Generator
|
||||||
* Ensure takeoff is in the generator Area and System breakdowns
|
* Ensure takeoff is in the generator Area and System breakdowns
|
||||||
|
|||||||
+2
-2
@@ -17,7 +17,7 @@ Not to be confused with [[low-voltage]].
|
|||||||
|
|
||||||
## Sequence
|
## Sequence
|
||||||
|
|
||||||
### 1. Estimate preparation
|
### 1. Preparation
|
||||||
|
|
||||||
#### Riser
|
#### Riser
|
||||||
|
|
||||||
@@ -141,6 +141,6 @@ CA.27.8.6/7
|
|||||||
CA.22.7
|
CA.22.7
|
||||||
* Parts: 2 Boxes, EMT Stub, 1 J-hook/per 6'
|
* Parts: 2 Boxes, EMT Stub, 1 J-hook/per 6'
|
||||||
|
|
||||||
### 3. Extension (Review and Checking)
|
### 3. Review
|
||||||
|
|
||||||
1. Sleeving
|
1. Sleeving
|
||||||
|
|||||||
@@ -2,6 +2,7 @@
|
|||||||
id: the-failure-of-risk-management
|
id: the-failure-of-risk-management
|
||||||
aliases: []
|
aliases: []
|
||||||
tags:
|
tags:
|
||||||
|
- destiny/uncertain
|
||||||
- type/media-commentary
|
- type/media-commentary
|
||||||
---
|
---
|
||||||
# _The Failure of Risk Management_
|
# _The Failure of Risk Management_
|
||||||
|
|||||||
@@ -39,7 +39,7 @@ tags:
|
|||||||
|
|
||||||
## Sequence
|
## Sequence
|
||||||
|
|
||||||
### 1. Estimate preparation
|
### 1. Preparation
|
||||||
|
|
||||||
1. Locate Unit panels and relevant keynotes
|
1. Locate Unit panels and relevant keynotes
|
||||||
* bus amps
|
* bus amps
|
||||||
@@ -148,6 +148,6 @@ For ADA units:
|
|||||||
|
|
||||||
==use free air devices==
|
==use free air devices==
|
||||||
|
|
||||||
### 3. Extension (Review and Checking)
|
### 3. Review
|
||||||
|
|
||||||
1. Scroll through with Area selected and make sure there is takeoff for each unit type
|
1. Scroll through with Area selected and make sure there is takeoff for each unit type
|
||||||
|
|||||||
Reference in New Issue
Block a user