In [[construction-estimating]], the acceptable level of detail of an estimate is a contentious subject.
|
||||
@@ -15,7 +21,7 @@ A commonality of both is the implication that more time ought to be preferred,
|
||||
when the reality is that when considering larger organizational factors (strategy),
|
||||
ideal estimate certainty is likely far lower than most expect.
|
||||
|
||||
The *correct* correct answer involves optimizing for these factors:
|
||||
The _correct_ correct answer involves optimizing for these factors:
|
||||
* value of increased bid certainty
|
||||
* value of increased estimate volume
|
||||
%%
|
||||
|
||||