vault backup: 2025-07-24 16:44:33
This commit is contained in:
Vendored
+2
-1
@@ -7,5 +7,6 @@
|
||||
"dataview",
|
||||
"obsidian-linter",
|
||||
"templater-obsidian",
|
||||
"obsidian-style-settings"
|
||||
"obsidian-style-settings",
|
||||
"obsidian-tagfolder"
|
||||
]
|
||||
Vendored
+18
-3
@@ -3,10 +3,25 @@
|
||||
"search": "",
|
||||
"showTags": false,
|
||||
"showAttachments": false,
|
||||
"hideUnresolved": false,
|
||||
"hideUnresolved": true,
|
||||
"showOrphans": true,
|
||||
"collapse-color-groups": false,
|
||||
"colorGroups": [],
|
||||
"colorGroups": [
|
||||
{
|
||||
"query": "tag:#systems ",
|
||||
"color": {
|
||||
"a": 1,
|
||||
"rgb": 14701138
|
||||
}
|
||||
},
|
||||
{
|
||||
"query": "tag:#meta",
|
||||
"color": {
|
||||
"a": 1,
|
||||
"rgb": 14725458
|
||||
}
|
||||
}
|
||||
],
|
||||
"collapse-display": false,
|
||||
"showArrow": false,
|
||||
"textFadeMultiplier": 0,
|
||||
@@ -17,6 +32,6 @@
|
||||
"repelStrength": 10,
|
||||
"linkStrength": 1,
|
||||
"linkDistance": 250,
|
||||
"scale": 0.6135434814060166,
|
||||
"scale": 0.6135434814060167,
|
||||
"close": false
|
||||
}
|
||||
+35882
File diff suppressed because one or more lines are too long
+10
@@ -0,0 +1,10 @@
|
||||
{
|
||||
"id": "breadcrumbs",
|
||||
"name": "Breadcrumbs",
|
||||
"version": "3.6.11",
|
||||
"minAppVersion": "0.15.2",
|
||||
"description": "Visualise & navigate your vault's structure",
|
||||
"author": "SkepticMystic",
|
||||
"authorUrl": "https://github.com/SkepticMystic/breadcrumbs",
|
||||
"isDesktopOnly": false
|
||||
}
|
||||
+113
@@ -0,0 +1,113 @@
|
||||
.BC-trail {
|
||||
border: 1px solid var(--background-modifier-border);
|
||||
border-radius: 5px;
|
||||
padding: 5px;
|
||||
margin-bottom: 5px !important;
|
||||
}
|
||||
|
||||
/* completely hides the trail when "no path found message" is left empty and no path is found */
|
||||
.BC-trail:empty {
|
||||
display: none;
|
||||
}
|
||||
|
||||
.BC-matrix-square li {
|
||||
text-align: left;
|
||||
}
|
||||
|
||||
/* ensure empty headers not leaving an element */
|
||||
.BC-Matrix .BC-Matrix-square .BC-Matrix-header:empty {
|
||||
display: none;
|
||||
}
|
||||
|
||||
.internal-link.BC-Link {
|
||||
color: var(--text-accent);
|
||||
}
|
||||
|
||||
.internal-link.BC-Link:hover {
|
||||
color: var(--text-accent-hover, var(--text-accent));
|
||||
}
|
||||
|
||||
.vis-view-options > * {
|
||||
padding: 5px;
|
||||
}
|
||||
|
||||
/* Source: https://svelte.dev/repl/3153faf7584d40bd8ddebecf39f24ac1?version=3.41.0 */
|
||||
[data-tooltip] {
|
||||
position: relative;
|
||||
/* z-index: 2; */
|
||||
/* display: block; */
|
||||
}
|
||||
|
||||
[data-tooltip]:before,
|
||||
[data-tooltip]:after {
|
||||
visibility: hidden;
|
||||
opacity: 0;
|
||||
pointer-events: none;
|
||||
transition: 0.2s ease-out;
|
||||
transform: translate(-50%, 5px);
|
||||
}
|
||||
|
||||
[data-tooltip]:before {
|
||||
position: absolute;
|
||||
top: 80%;
|
||||
/* bottom: 100%; */
|
||||
left: 50%;
|
||||
margin-bottom: 5px;
|
||||
padding: 7px;
|
||||
width: fit-content;
|
||||
height: fit-content;
|
||||
min-width: 200px;
|
||||
min-height: 200px;
|
||||
-webkit-border-radius: 3px;
|
||||
-moz-border-radius: 3px;
|
||||
border-radius: 3px;
|
||||
background-color: var(--background-primary);
|
||||
color: var(--text-normal);
|
||||
content: attr(data-tooltip);
|
||||
text-align: center;
|
||||
font-size: var(--font-medium);
|
||||
line-height: 1.2;
|
||||
transition: 0.2s ease-out;
|
||||
white-space: pre-line;
|
||||
z-index: 100;
|
||||
}
|
||||
|
||||
/* [data-tooltip]:after {
|
||||
position: absolute;
|
||||
top: 80%;
|
||||
left: 50%;
|
||||
width: 0;
|
||||
border-top: 5px solid #000;
|
||||
border-top: 5px solid hsla(0, 0%, 20%, 0.9);
|
||||
border-right: 5px solid transparent;
|
||||
border-left: 5px solid transparent;
|
||||
background-color: red;
|
||||
content: " ";
|
||||
font-size: 0;
|
||||
line-height: 0;
|
||||
} */
|
||||
|
||||
[data-tooltip]:hover:before,
|
||||
[data-tooltip]:hover:after {
|
||||
visibility: visible;
|
||||
opacity: 1;
|
||||
transform: translate(-50%, 0);
|
||||
}
|
||||
[data-tooltip="false"]:hover:before,
|
||||
[data-tooltip="false"]:hover:after {
|
||||
visibility: hidden;
|
||||
opacity: 0;
|
||||
}
|
||||
|
||||
.thread-dir-templates .setting-item-control {
|
||||
display: flex;
|
||||
flex-direction: column;
|
||||
}
|
||||
|
||||
.juggl-hide {
|
||||
display: none;
|
||||
}
|
||||
|
||||
[data-type="BC-matrix"] div.view-content {
|
||||
overflow: hidden !important;
|
||||
}
|
||||
+45
@@ -0,0 +1,45 @@
|
||||
{
|
||||
"displayMethod": "NAME",
|
||||
"alwaysOpen": true,
|
||||
"ignoreDocTags": "",
|
||||
"ignoreTags": "",
|
||||
"hideOnRootTags": "",
|
||||
"sortType": "DISPNAME_ASC",
|
||||
"sortExactFirst": false,
|
||||
"sortTypeTag": "NAME_ASC",
|
||||
"expandLimit": 0,
|
||||
"disableNestedTags": false,
|
||||
"hideItems": "NONE",
|
||||
"ignoreFolders": "",
|
||||
"targetFolders": "",
|
||||
"scanDelay": 250,
|
||||
"useTitle": false,
|
||||
"reduceNestedParent": true,
|
||||
"frontmatterKey": "title",
|
||||
"useTagInfo": false,
|
||||
"tagInfo": "pininfo.md",
|
||||
"mergeRedundantCombination": false,
|
||||
"useVirtualTag": false,
|
||||
"useFrontmatterTagsForNewNotes": false,
|
||||
"doNotSimplifyTags": false,
|
||||
"overrideTagClicking": false,
|
||||
"useMultiPaneList": false,
|
||||
"archiveTags": "",
|
||||
"disableNarrowingDown": true,
|
||||
"expandUntaggedToRoot": false,
|
||||
"disableDragging": false,
|
||||
"linkConfig": {
|
||||
"incoming": {
|
||||
"enabled": true,
|
||||
"key": ""
|
||||
},
|
||||
"outgoing": {
|
||||
"enabled": true,
|
||||
"key": ""
|
||||
}
|
||||
},
|
||||
"linkShowOnlyFDR": true,
|
||||
"linkCombineOtherTree": true,
|
||||
"showListIn": "",
|
||||
"displayFolderAsTag": false
|
||||
}
|
||||
+5746
File diff suppressed because it is too large
Load Diff
@@ -0,0 +1,10 @@
|
||||
{
|
||||
"id": "obsidian-tagfolder",
|
||||
"name": "TagFolder",
|
||||
"version": "0.18.11",
|
||||
"minAppVersion": "0.12.0",
|
||||
"description": "Show tags as folder",
|
||||
"author": "vorotamoroz",
|
||||
"authorUrl": "https://github.com/vrtmrz",
|
||||
"isDesktopOnly": false
|
||||
}
|
||||
+139
@@ -0,0 +1,139 @@
|
||||
.workspace-leaf-content[data-type="tagfolder-view"]>.view-content,
|
||||
.workspace-leaf-content[data-type="tagfolder-view-list"]>.view-content {
|
||||
padding: 0;
|
||||
height: 100%;
|
||||
overflow: unset;
|
||||
}
|
||||
|
||||
.override-input {
|
||||
flex-direction: column-reverse;
|
||||
}
|
||||
|
||||
.tagfolder-tag::before {
|
||||
all: inherit;
|
||||
color: inherit;
|
||||
font: inherit;
|
||||
}
|
||||
|
||||
.tagfolder-tag.tag-tag::before {
|
||||
margin-left: 0px;
|
||||
margin-right: 0px;
|
||||
}
|
||||
|
||||
.tagfolder-tag.tag-tag span.tf-tag-each:empty {
|
||||
display: none;
|
||||
}
|
||||
|
||||
.tagfolder-tag.tag-tag.tf-tag span.tf-tag-each:first-child:not(:empty):before {
|
||||
content: "#";
|
||||
margin-left: 0.3em;
|
||||
}
|
||||
|
||||
.tagfolder-tag.tag-tag.tf-link span.tf-tag-each:first-child:not(:empty):before {
|
||||
content: "";
|
||||
margin-left: 0.3em;
|
||||
}
|
||||
|
||||
.tagfolder-tag.tag-tag.tf-link.link-cross span.tf-tag-each:first-child:not(:empty):before {
|
||||
content: "⇔ ";
|
||||
margin-left: 0.3em;
|
||||
}
|
||||
|
||||
.tagfolder-tag.tag-tag.tf-link.link-forward span.tf-tag-each:first-child:not(:empty):before {
|
||||
content: "⇒ ";
|
||||
margin-left: 0.3em;
|
||||
}
|
||||
|
||||
.tagfolder-tag.tag-tag.tf-link.link-reverse span.tf-tag-each:first-child:not(:empty):before {
|
||||
content: "⇐ ";
|
||||
margin-left: 0.3em;
|
||||
}
|
||||
|
||||
.tagfolder-tag.tag-tag span.tf-tag-each::before {
|
||||
content: "→ ";
|
||||
margin-left: 0;
|
||||
margin-right: 0;
|
||||
}
|
||||
|
||||
|
||||
.tf-taglist {
|
||||
white-space: nowrap;
|
||||
text-overflow: ellipsis;
|
||||
overflow: hidden;
|
||||
display: inline-block;
|
||||
flex-shrink: 100;
|
||||
margin-left: auto;
|
||||
text-align: right;
|
||||
}
|
||||
|
||||
.tf-taglist:not(:empty) {
|
||||
min-width: 3em;
|
||||
}
|
||||
|
||||
.tf-taglist .tf-tag {
|
||||
background-color: var(--background-secondary-alt);
|
||||
border-radius: 4px;
|
||||
padding: 2px 4px;
|
||||
margin-left: 4px;
|
||||
color: var(--nav-item-color);
|
||||
}
|
||||
|
||||
.nav-folder-title:hover .tagfolder-quantity,
|
||||
.nav-file-title:hover .tf-taglist {
|
||||
color: var(--text-on-accent);
|
||||
}
|
||||
|
||||
.nav-folder-title:hover .tagfolder-quantity span,
|
||||
.nav-file-title:hover .tf-taglist span.tf-tag {
|
||||
color: var(--text-on-accent);
|
||||
background-color: var(--interactive-accent-hover);
|
||||
}
|
||||
|
||||
|
||||
.lsl-f {
|
||||
flex-direction: row;
|
||||
display: flex;
|
||||
flex-grow: 1;
|
||||
overflow: hidden;
|
||||
flex-shrink: 1;
|
||||
}
|
||||
|
||||
.lsl-f:not(:last-child) {
|
||||
min-width: 3em;
|
||||
}
|
||||
|
||||
.lsl-f:empty::before {
|
||||
content: "...";
|
||||
}
|
||||
|
||||
.tagfolder-titletagname {
|
||||
flex-grow: 1;
|
||||
text-overflow: ellipsis;
|
||||
white-space: nowrap;
|
||||
overflow: hidden;
|
||||
}
|
||||
|
||||
.tagfolder-quantity span {
|
||||
background-color: var(--background-secondary-alt);
|
||||
color: var(--nav-item-color);
|
||||
border-radius: 4px;
|
||||
padding: 2px 4px;
|
||||
}
|
||||
|
||||
.tagfolder-quantity {
|
||||
width: 3em;
|
||||
text-align: right;
|
||||
cursor: pointer;
|
||||
margin-left: auto;
|
||||
}
|
||||
|
||||
.tag-folder-title {
|
||||
max-width: 100%;
|
||||
}
|
||||
|
||||
.tree-item.nav-folder.updating {
|
||||
background: linear-gradient(135deg, var(--interactive-accent-hover) 0%, var(--interactive-accent-hover) 50%, rgba(0, 0, 0, 0) 50%, rgba(0, 0, 0, 0) 100%);
|
||||
background-repeat: no-repeat;
|
||||
background-position: 0 0;
|
||||
background-size: 10px 10px;
|
||||
}
|
||||
+2
-1
@@ -1,7 +1,8 @@
|
||||
---
|
||||
id: 2025-07-18_estimating-isnt-engineering
|
||||
aliases: []
|
||||
tags: []
|
||||
tags:
|
||||
- anecdote
|
||||
---
|
||||
# Estimating Isn't Engineering
|
||||
|
||||
+2
-1
@@ -1,7 +1,8 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags: []
|
||||
tags:
|
||||
- media
|
||||
---
|
||||
# 314.28 Pull and Junction Boxes and Conduit Bodies.
|
||||
|
||||
@@ -1,3 +1,10 @@
|
||||
---
|
||||
id:
|
||||
aliases:
|
||||
- home
|
||||
tags:
|
||||
- meta
|
||||
---
|
||||
# zmVault
|
||||
|
||||
This obsidian vault collects my thoughts on my most developed [[supertopics|supertopic]],
|
||||
@@ -5,12 +12,14 @@ which I would call "[[construction-estimating]]",
|
||||
but that includes fields far more disparate
|
||||
than my peers would traditionally consider relevant.
|
||||
|
||||
See [[this-notebook]].
|
||||
|
||||
## Purpose
|
||||
|
||||
I want to be involved construction estimating for the rest of my working life.
|
||||
Current discourse on the subject is self-similar and sanitized.
|
||||
I'd like to be known as an innovator in [[estimating-philosophy]],
|
||||
and for solving some of its [[open-problems]].
|
||||
and for solving some of its [[open-problems-in-estimating]].
|
||||
|
||||
## Contents
|
||||
|
||||
|
||||
@@ -0,0 +1,49 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags:
|
||||
- guide
|
||||
---
|
||||
# Accubid Setup
|
||||
|
||||
## Sequence
|
||||
|
||||
### Create LiveCount Project
|
||||
|
||||
1. In [Trimble Connect](https://web.connect.trimble.com),
|
||||
find the project "CONEST TEMPLATE",
|
||||
open its context menu,
|
||||
then click "Use as template for a new project".
|
||||
|
||||
2. Ensure all checkboxes are checked,
|
||||
then click `Next`.
|
||||
|
||||
3. Name with format "{Project Name} - ConEst".
|
||||
|
||||
Refresh the page and open the newly created project.
|
||||
|
||||
### Upload Drawings to LiveCount
|
||||
|
||||
```
|
||||
# Extract drawings to ".\Trimble Connect (Plans)"
|
||||
```
|
||||
|
||||
Upload extracted drawings to LiveCount
|
||||
|
||||
### Create Accubid Job
|
||||
|
||||
> [!important]
|
||||
> The LiveCount project must be created **before** creating the Accubid job.
|
||||
|
||||
* Create a new Accubid job:
|
||||
Path: "\\EgnyteDrive\Shared\Trimble\Accubid\Bid\{Project Name} - ConEst.es16"
|
||||
|
||||
### Add Drawings to Accubid Job
|
||||
|
||||
* In the LiveCount window, find `Document Manager` > `Select Existing Project`.
|
||||
Add all previously uploaded drawings.
|
||||
|
||||
### Setup Breakdowns
|
||||
|
||||
> [!important]
|
||||
> Do not copy Systems from WBS Accubid Setup.
|
||||
@@ -1,7 +1,9 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags: []
|
||||
tags:
|
||||
- automation
|
||||
- software
|
||||
---
|
||||
# Assembly Objects
|
||||
|
||||
@@ -1,3 +1,10 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags:
|
||||
- professional
|
||||
- automation
|
||||
---
|
||||
# Award Analysis
|
||||
|
||||
BPM > Reports > Awards
|
||||
@@ -1,3 +1,9 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags:
|
||||
- estimating
|
||||
---
|
||||
# Construction Estimating
|
||||
|
||||
Construction estimating is a subset of cost estimation.
|
||||
@@ -16,7 +22,7 @@ which would take far longer than allotted for bid,
|
||||
> For some owners, money is no object,
|
||||
> and standardization is far more important
|
||||
> than any potential construction savings.
|
||||
>
|
||||
>
|
||||
> These owners can be expected to decline every [[value-engineering]] option offered
|
||||
> (see [[gold-plating]]).
|
||||
|
||||
|
||||
@@ -0,0 +1,47 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags:
|
||||
- guide
|
||||
---
|
||||
# Design Build Budget
|
||||
|
||||
## Sequence
|
||||
|
||||
### 2. Takeoff
|
||||
|
||||
#### Misc Budgets
|
||||
|
||||
From [[misc-budgets]], takeoff:
|
||||
|
||||
* Temporary Power & Lighting
|
||||
* Irrigation
|
||||
|
||||
#### Feeders
|
||||
|
||||
##### Primaries & Secondaries
|
||||
|
||||
See [[feeders]].
|
||||
|
||||
##### Feeders
|
||||
|
||||
Budget per Unit Count. Compare to Bid Sheet.
|
||||
|
||||
Alternate method as described by Joel:
|
||||
Takeoff unit risers normally
|
||||
with length * 1.5 to cover house panel feeders.
|
||||
|
||||
#### Switchgear
|
||||
|
||||
Budget per Unit Count. Compare to Bid Sheet.
|
||||
|
||||
##### Generator
|
||||
|
||||
See [[switchgear#Generator]].
|
||||
|
||||
#### Subfeeds
|
||||
|
||||
Budget per Unit Count. Compare to Bid Sheet.
|
||||
|
||||
Alternate method as described by Joel:
|
||||
Takeoff per [[subfeeds]], use average for length.
|
||||
@@ -0,0 +1,59 @@
|
||||
---
|
||||
id: electrical
|
||||
aliases: []
|
||||
tags:
|
||||
- systems/electrical
|
||||
---
|
||||
# Electrical
|
||||
|
||||
## Sequence
|
||||
|
||||
### 1. Estimate preparation
|
||||
|
||||
2. Read about the project specifications and construction type
|
||||
3. Locate Equipment Schedules
|
||||
|
||||
4. Device specs (Decora or Standard)
|
||||
|
||||
### 2. Takeoff
|
||||
|
||||
1. Takeoff all equipment that is not #12
|
||||
2. Go by Drawing in chronological order
|
||||
3. Takeoff Enlarged Drawings
|
||||
4. Do final checklist in electrical takeoff notes
|
||||
|
||||
> [!tip]
|
||||
> It is sometimes easier to rebuild a designation than to modify it.
|
||||
> For designations with existing takeoffs, Right-Click > `Empty Designation`.
|
||||
> The build process can then be completed anew.
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
|
||||
1. Count Car chargers and location
|
||||
|
||||
## Takeoff
|
||||
|
||||
### Lighting Control
|
||||
|
||||
By PDI convention, [[lighting-controls]] are generally "Electrical", not "Lighting".
|
||||
|
||||
### Receptacles
|
||||
|
||||
### Mechanical Connections
|
||||
|
||||
#### CU/IP
|
||||
|
||||
* Units Condensing Unit
|
||||
* Mechanical Connection
|
||||
|
||||
#### Trash Chute
|
||||
|
||||
Horizontal:
|
||||
* Check if shown on power drawings as mech connection
|
||||
* If not, use 100ft length
|
||||
|
||||
Vertical (Riser):
|
||||
* Takeoff: `COMMON ASSEMBLIES`/`MISC ASSEMBLIES`/`TRASH CHUTE RISER CIRCUIT...`
|
||||
* Uncheck Link 'Enable Livecount'
|
||||
* Takeoff in Typical
|
||||
* Length = average floor to floor height
|
||||
@@ -1,3 +1,9 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags:
|
||||
- estimating
|
||||
---
|
||||
# Estimating Detail
|
||||
|
||||
In [[construction-estimating]], the acceptable level of detail of an estimate is a contentious subject.
|
||||
@@ -15,7 +21,7 @@ A commonality of both is the implication that more time ought to be preferred,
|
||||
when the reality is that when considering larger organizational factors (strategy),
|
||||
ideal estimate certainty is likely far lower than most expect.
|
||||
|
||||
The *correct* correct answer involves optimizing for these factors:
|
||||
The _correct_ correct answer involves optimizing for these factors:
|
||||
* value of increased bid certainty
|
||||
* value of increased estimate volume
|
||||
%%
|
||||
|
||||
@@ -0,0 +1,34 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags:
|
||||
- guide
|
||||
- professional
|
||||
next: project-setup
|
||||
---
|
||||
# Estimating Workflow
|
||||
|
||||
## Sequence
|
||||
|
||||
### 1. Estimate preparation
|
||||
|
||||
[[project-setup]]
|
||||
|
||||
### 2. Takeoff
|
||||
|
||||
#### Stage 1
|
||||
|
||||
1. [[feeders]]
|
||||
2. [[subfeeds]]
|
||||
3. [[switchgear]]
|
||||
|
||||
#### Stage 2
|
||||
|
||||
4. [[units]]
|
||||
5. [[fixtures]]
|
||||
6. [[electrical]]
|
||||
7. [[low-voltage]]
|
||||
8. [[lightning-protection]]
|
||||
9. [[misc-budgets]]
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
@@ -1,7 +1,9 @@
|
||||
---
|
||||
id: excel-macros
|
||||
aliases: []
|
||||
tags: []
|
||||
tags:
|
||||
- software
|
||||
- guide
|
||||
---
|
||||
# Excel Macros
|
||||
|
||||
@@ -28,7 +30,7 @@ Developer > Code > Record Macro
|
||||
Set `Store macro in:` to `Personal Macro Workbook`
|
||||
and click `OK`, then `Stop Recording`.
|
||||
|
||||
## 3.
|
||||
## 3.
|
||||
|
||||
```menu
|
||||
Developer > Visual Basic
|
||||
@@ -66,4 +68,3 @@ End Sub
|
||||
|
||||
Use `Ctrl+S` or the save icon to save the edits
|
||||
then close the Visual Basic window.
|
||||
|
||||
@@ -1,13 +1,20 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags:
|
||||
- automation
|
||||
- professional
|
||||
---
|
||||
# Feeder Verification Automation
|
||||
|
||||
> * Filter by Feeders system in Takeoff
|
||||
> * Highlight everything and copy into excel
|
||||
> * Erase the everything except the description, length, and count
|
||||
> * Make a note of any typicals
|
||||
> * Redo the same process but with USF, Primaries, and Secondaries
|
||||
> * Redo the same process but with USF, Primaries, and Secondaries
|
||||
> * Save as and rename to NAME - Feeder Verification in the PSN folder
|
||||
|
||||
Breakdown selection is straightforward.
|
||||
|
||||
To select all takeoffs:
|
||||
Get top left corner of pane, offset down and right.
|
||||
Get top left corner of pane, offset down and right.
|
||||
@@ -1,16 +1,55 @@
|
||||
---
|
||||
id:
|
||||
id: feeders
|
||||
aliases: []
|
||||
tags: []
|
||||
tags:
|
||||
- systems/feeders
|
||||
---
|
||||
# Feeders
|
||||
|
||||
* Use 15ft adders for site runs
|
||||
(primaries, secondaries, etc.),
|
||||
as opposed to standard 10ft adder,
|
||||
to account for variability.
|
||||
## Info
|
||||
|
||||
## Cable Support
|
||||
## Sequence
|
||||
|
||||
### 1. Estimate preparation
|
||||
|
||||
Read about the project specifications and construction type:
|
||||
* Delivery Method (Plans & Specs, Design Build, Design Assist, Preliminary Budget)
|
||||
* Deck thickness
|
||||
* Wiring method
|
||||
* Conductor material (Aluminum/Copper)
|
||||
|
||||
Locate:
|
||||
* Riser Diagram
|
||||
* Feeder Schedule (if present)
|
||||
* Main Electrical rooms and panel locations
|
||||
* Routing (if present)
|
||||
|
||||
### 2. Takeoff
|
||||
|
||||
* Choose a starting point on the riser
|
||||
* Determine wire & Conduit makeup (3Ph/1Ph, AL/CU, Conduit)
|
||||
* Measure off the length of the feed _ADDERS_
|
||||
* Square corners, use corridors if possible
|
||||
|
||||
> [!important]
|
||||
> All takeoffs in Systems with names including "site"
|
||||
> should be in "Site" Area, Phase, and Bid Item breakdowns.
|
||||
|
||||
> [!important]
|
||||
> Use 15ft adders for site runs
|
||||
> (primaries, secondaries, etc.),
|
||||
> as opposed to standard 10ft adder,
|
||||
> to account for variability.
|
||||
|
||||
#### Primaries
|
||||
|
||||
#### Secondaries
|
||||
|
||||
#### Feeders
|
||||
|
||||
#### Bus Duct
|
||||
|
||||
#### Cable Support
|
||||
|
||||
> [!quote] 300.19 Supporting Conductors in Vertical Raceways.
|
||||
> **(A) Spacing Intervals -- Maximum.**
|
||||
@@ -34,7 +73,7 @@ tags: []
|
||||
> | Over 500 kcmil through 750 kcmil | 95ft | 40ft |
|
||||
> | Over 750 kcmil | 85ft | 35ft |
|
||||
|
||||
## Sleeving
|
||||
#### Sleeving
|
||||
|
||||
Provide sleeves for all feeder conduits passing through floors.
|
||||
|
||||
@@ -42,3 +81,5 @@ Provide sleeves for all feeder conduits passing through floors.
|
||||
* P = Plastic => Concrete
|
||||
* M = Metal => Wood Frame
|
||||
* Round 1" to 2"
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
+224
@@ -0,0 +1,224 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags:
|
||||
- systems/fire-alarm
|
||||
---
|
||||
# Fire Alarm
|
||||
|
||||
## Sequence
|
||||
|
||||
### 1. Estimate preparation
|
||||
|
||||
1. Initial the OneNote
|
||||
2. Read about the project specifications and construction type
|
||||
3. Find Fire Alarm plans (if present)
|
||||
4. Locate the following rooms:
|
||||
* Fire Command Center (FCC)
|
||||
* Generator Room
|
||||
* Fire Pump Room
|
||||
* Elevator Control Rooms
|
||||
* Elevator Shafts
|
||||
* Stairwells
|
||||
|
||||
### 2. Takeoff
|
||||
|
||||
#### Riser
|
||||
|
||||
##### Fire Command Center
|
||||
|
||||
{Building Type} Head End CA.30.23.X
|
||||
|
||||
##### Generator Room
|
||||
|
||||
CA.30.22.2
|
||||
|
||||
##### Fire Pump Room
|
||||
|
||||
CA.30.22.4
|
||||
|
||||
##### FACR to Elevator Shafts
|
||||
|
||||
Elevator Shafts (CA.30.22.8)
|
||||
|
||||
FACR TO ELEV SHAFT 1 ½" (CA.30.22.10/11)
|
||||
|
||||
Measure Length from the most distant points of the FACR and each shaft.
|
||||
Input adder length to reach the bottom of the pit
|
||||
(Minimum 15ft adder).
|
||||
|
||||
```
|
||||
| 1 shaft | 2 shafts |
|
||||
| || +--------+ +--------+ || | || +--------+ || +--------+ || |
|
||||
| || | Elev 1 | | Elev 2 | || | || | Elev 1 | || | Elev 2 | || |
|
||||
| || +--------+ +--------+ || | || +--------+ || +--------+ || |
|
||||
| ||=======================|| | ||============||============|| |
|
||||
| | |
|
||||
```
|
||||
|
||||
##### FACR to Elevator Control Rooms
|
||||
|
||||
Elevator Control Room (CA.30.22.6)
|
||||
|
||||
FACR/FCC TO ELEV CONTROL ROOM (CA.30.22.13/14)
|
||||
|
||||
* Measure the Horizontal and Vertical Distance from the FACR to the ECR.
|
||||
* Use Typicals for the vertical riser. (Ex// 10' per floor)
|
||||
|
||||
##### FACR to Stairwells
|
||||
|
||||
FACR TO STAIRWELLS 1" PVC (CA.30.22.17)
|
||||
|
||||
* Measure from the furthest end of FACR to the furthest end of the stairwell to find length
|
||||
|
||||
* This is for the Flow/Tamper modules in the stairwells
|
||||
|
||||
##### Terminal Cabinets
|
||||
|
||||
TERMINAL CABINETS (2) 2" EMT/PVC (CA.30.26. __)
|
||||
|
||||
Horizontal:
|
||||
* Measure from the Fire Command room to all electrical rooms
|
||||
|
||||
Vertical:
|
||||
* Use 10ft Riser in Typical
|
||||
* GA or HD - 1" conduit / HR - (2) 2" conduits)
|
||||
|
||||
##### Annunciator Panels
|
||||
|
||||
* Fire Alarm Annunciator (FAA),
|
||||
* Fire Alarm Annunciator Panel (FAAP)
|
||||
|
||||
ANNUNCIATORS (CA.30.27.2/3)
|
||||
|
||||
Remote Serial Annunciator, LCD Display - PVC
|
||||
|
||||
* Measure from the Fire Command Room to FAA or Lobby
|
||||
|
||||
##### Sleeving
|
||||
|
||||
#### Devices
|
||||
|
||||
1. Takeoff floor plans in order
|
||||
2. Takeoff enlarged drawings
|
||||
|
||||
##### Smoke Detectors
|
||||
|
||||
_Design Build:_
|
||||
Count every stairwell at every level.
|
||||
|
||||
##### Pull Stations
|
||||
|
||||
_Design Build:_
|
||||
Count every stairwell at every level
|
||||
and every exterior exit.
|
||||
|
||||
##### Flow-Tamper Switches
|
||||
|
||||
No free air. if wood frame, take off as EMT.
|
||||
|
||||
_Design Build:_
|
||||
Count every stairwell at every level.
|
||||
|
||||
##### Magnetic Door Holders
|
||||
|
||||
Mech Connection - PVC AL Flex - 20 A
|
||||
|
||||
_Design Build:_
|
||||
Count every set of double doors.
|
||||
(Typical of elevator lobbies and corridors)
|
||||
|
||||
##### Speaker Strobes
|
||||
|
||||
_Design Build:_
|
||||
* Count every 75 ft,
|
||||
* measure with circles on Bluebeam
|
||||
* or divide relevant SF area by 4415
|
||||
* $\pi(\frac{75}{2})^2 \approx 4415$
|
||||
* every elevator lobby,
|
||||
* and every BOH room on the first floor and garage levels.
|
||||
|
||||
#### Fire Smoke Dampers (FSD's)
|
||||
|
||||
Take off both FA and Electrical
|
||||
* Misc Assemblies
|
||||
|
||||
#### Area of Refuge (AoR) / Two-Way
|
||||
|
||||
PROPOSAL "STAND ALONE SYSTEMS"
|
||||
|
||||
CA.31.27. 4/7
|
||||
|
||||
##### Horizontal
|
||||
|
||||
Take off once
|
||||
* Length:
|
||||
* If shown on Plans (FA/Systems/ etc.)
|
||||
* based on FCR to Elevator Lobbies & FCR to Stairwells* (Whichever is longer)
|
||||
* Count: Number of boxes run to. If not shown, use the largest count between Elev. & Strwlls.
|
||||
|
||||
##### Vertical
|
||||
|
||||
Typical on all floors
|
||||
* Length: 15ft x per count
|
||||
* Count: match Horizontal
|
||||
|
||||
#### Responder Radio / DAS
|
||||
|
||||
##### FACR to Every Elev. Shaft
|
||||
|
||||
FACR TO ELEV PIT = 2" PVC40
|
||||
CA.28.31.5
|
||||
|
||||
Match Fire Alarm takeoff Length and Count
|
||||
|
||||
##### FACR to Every Staircase
|
||||
|
||||
FACR TO STAIRWELL = 2" PVC40
|
||||
CA.28.31.8
|
||||
|
||||
Match Fire Alarm takeoff Length and Count
|
||||
|
||||
##### Stairwell Riser Every 2 Floors
|
||||
|
||||
STAIRWELL RISER EVERY 2 FLRS = 1 1/2" EMT (20') W/ 16X16X6 BOX
|
||||
CA.28.31.12
|
||||
|
||||
Create a Stairwell typical on every other floor
|
||||
|
||||
##### FACR to Electric Room
|
||||
|
||||
FACR TO 2HR-RATED RM = 2" PVC40
|
||||
CA.28.31.14
|
||||
|
||||
Match Fire Alarm takeoff Length
|
||||
|
||||
##### Electric Room Riser to Every Floor
|
||||
|
||||
2HR-RATED RM RISER TO EVERY FLR = 2" EMT (15') W/ 16X16X6 BOX
|
||||
CA.28.31.18
|
||||
|
||||
Takeoff in every Electric Room
|
||||
|
||||
##### Top 2H Rated Room To Roof
|
||||
|
||||
FACR TO ROOF = 2" EMT W/ RMC WEATHERHEAD & IMC STUB
|
||||
CA.28.31.18
|
||||
|
||||
Use 15' or Height of ceiling on last building level
|
||||
|
||||
##### Horizontal
|
||||
|
||||
CORRIDORS EMT OH = 1 1/2" EMT W/ 16X16X6 BOX EVERY 80'
|
||||
CA.28.31.23
|
||||
|
||||
CORRIDORS DECK = 1 1/2" PVC40, STUBBY, FLEX W/ 16X16X6 BOX EVERY 80'
|
||||
CA.28.31.21
|
||||
|
||||
1-1/2 through corridors w/ 16x16x6 J-Box
|
||||
|
||||
Length for every corridor/garage
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
|
||||
* Sleeving
|
||||
@@ -1,19 +1,14 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags: []
|
||||
tags:
|
||||
- systems/fixtures
|
||||
---
|
||||
# Lighting (Fixtures)
|
||||
# Fixture Designations
|
||||
|
||||
## Info
|
||||
## Naming
|
||||
|
||||
## Scope
|
||||
|
||||
### Building Designations
|
||||
|
||||
#### Naming
|
||||
|
||||
##### Format
|
||||
### Format
|
||||
|
||||
```regex
|
||||
<phase-abbr> - <assembly>(\: <subtype>)?( - <fixture-labor>)? \(<wiring-method>\)( <wm-descriptor>)* <branch-length>ft
|
||||
@@ -22,7 +17,7 @@ tags: []
|
||||
> [!example]
|
||||
> `A - Surface: Pendant - 2.0hrs (MC) LV 20ft`
|
||||
|
||||
#### Order
|
||||
## Order
|
||||
|
||||
Use empty designations to separate phases.
|
||||
|
||||
@@ -40,52 +35,42 @@ Use empty designations to separate phases.
|
||||
> CU - Surface: Wall (MC) LV 25ft
|
||||
> ```
|
||||
|
||||
#### Fixture Labor
|
||||
## Fixture Labor
|
||||
|
||||
> | Fixture Type | Labor |
|
||||
> | ------------ | -------------- |
|
||||
> | Paddle Fan | 1.5 hrs/ea |
|
||||
> | Pendant | 1-4 hrs/ea[^6] |
|
||||
> | Strip/Cove | 0.083 hrs/ft |
|
||||
> | Site Poles | 1.5 hrs/ea |
|
||||
> | Festoon | 2 hrs/ea |
|
||||
> | All Others | 1 hrs/ea |
|
||||
>
|
||||
> [^6]: Determine exact labor from fixture and size.
|
||||
| Fixture Type | Labor |
|
||||
| ------------ | -------------- |
|
||||
| Paddle Fan | 1.5 hrs/ea |
|
||||
| Pendant | 1-4 hrs/ea[^1] |
|
||||
| Strip/Cove | 0.083 hrs/ft |
|
||||
| Site Poles | 1.5 hrs/ea |
|
||||
| Festoon | 2 hrs/ea |
|
||||
| All Others | 1 hrs/ea |
|
||||
|
||||
#### Fixture Branch Length
|
||||
## Fixture Branch Length
|
||||
|
||||
> | Case | Standard Length |
|
||||
> | ------------- | --------------- |
|
||||
> | Site/Courtyard | 50ft[^6] |
|
||||
> | Garage | 50ft |
|
||||
> | BOH | 40ft |
|
||||
> | Corridors | 40ft |
|
||||
> | Interior Amenity | 40ft[^7] |
|
||||
> | Office/Retail | 50ft |
|
||||
> | Exterior Amenity | 50ft |
|
||||
> | Units | 20ft |
|
||||
>
|
||||
> [^6]: Locate the panel and come up with avg. length
|
||||
>
|
||||
> [^7]: See fixture types below for special cases.
|
||||
| Case | Standard Length |
|
||||
| ------------- | --------------- |
|
||||
| Site/Courtyard | 50ft[^1] |
|
||||
| Garage | 50ft |
|
||||
| BOH | 40ft |
|
||||
| Corridors | 40ft |
|
||||
| Interior Amenity | 40ft[^2] |
|
||||
| Office/Retail | 50ft |
|
||||
| Exterior Amenity | 50ft |
|
||||
| Units | 20ft |
|
||||
|
||||
#### Fixture Branch Wire size
|
||||
## Fixture Branch Wire size
|
||||
|
||||
> | Case | Wire Size |
|
||||
> | -------------- | --------- |
|
||||
> | Site/Courtyard | #10[^6] |
|
||||
> | Garage | #10 |
|
||||
> | NM Cable | #14[^7] |
|
||||
> | All Others | #12 |
|
||||
>
|
||||
> [^6]: Refer to panel schedules or Site Pole Detail for Site Pole wire size
|
||||
>
|
||||
> [^7]: Kitchen and bathroom fixtures shall be #12 (NOT #14) on wood frame (NM) projects.
|
||||
| Case | Wire Size |
|
||||
| -------------- | --------- |
|
||||
| Site/Courtyard | #10[^1] |
|
||||
| Garage | #10 |
|
||||
| NM Cable | #14[^2] |
|
||||
| All Others | #12 |
|
||||
|
||||
#### Garage
|
||||
## Garage
|
||||
|
||||
#### Fixtures
|
||||
## Fixtures
|
||||
|
||||
Use ENT Assembly unless spec requires otherwise.
|
||||
|
||||
@@ -99,7 +84,7 @@ If PVC, use following assemblies:
|
||||
| Ceiling | `PVC/ENT ASSEMBLIES`/`... - SLAB BOX / 45 DEG STUBBY` |
|
||||
| Wall | `PVC/ENT ASSEMBLIES`/`... - STL BOX & TILE RING / 45 DEG STUBBY/ ENT DROP` |
|
||||
|
||||
#### Homeruns
|
||||
## Homeruns
|
||||
|
||||
> `System` = "EL - Electrical"
|
||||
|
||||
@@ -107,7 +92,7 @@ Use 1 Homerun for every 3 circuits in Garage
|
||||
|
||||
Use assembly `Common Assemblies`/`Device Homeruns in Slab/Deck`
|
||||
|
||||
#### Surface Mount
|
||||
## Surface Mount
|
||||
|
||||
> [!info] Surface Mount Fixtures
|
||||
> * Wall Mount (Sconce)
|
||||
@@ -116,18 +101,18 @@ Use assembly `Common Assemblies`/`Device Homeruns in Slab/Deck`
|
||||
> * Tape
|
||||
> * Track
|
||||
|
||||
| Wiring Method | Assembly Path |
|
||||
| ---------------------------------------------------------------------------- |
|
||||
| NM Cable | `NM ASSEMBLIES`/`RND BOX BAR HNGR...` |
|
||||
| MC Cable | `MC ASSEMBLIES`/`SQ BOX, ROUND P RING & MNTG BRKT...` |
|
||||
| PVC in Ceiling | `PVC/ENT ASSEMBLIES`/`... - SLAB BOX / 45 DEG STUBBY` |
|
||||
| PVC in Wall | `PVC/ENT ASSEMBLIES`/`3/4" PVC W/ 3#12 - STL BOX/TILE RING` |
|
||||
| EMT | `EMT ASSEMBLIES`/`... - SQ BOX & ROUND P RING` |
|
||||
| Wiring Method | Assembly Path |
|
||||
| -------------- | ----------------------------------------------------------- |
|
||||
| NM Cable | `NM ASSEMBLIES`/`RND BOX BAR HNGR...` |
|
||||
| MC Cable | `MC ASSEMBLIES`/`SQ BOX, ROUND P RING & MNTG BRKT...` |
|
||||
| PVC in Ceiling | `PVC/ENT ASSEMBLIES`/`... - SLAB BOX / 45 DEG STUBBY` |
|
||||
| PVC in Wall | `PVC/ENT ASSEMBLIES`/`3/4" PVC W/ 3#12 - STL BOX/TILE RING` |
|
||||
| EMT | `EMT ASSEMBLIES`/`... - SQ BOX & ROUND P RING` |
|
||||
|
||||
> [!note]
|
||||
> Use lighting control cable assemblies in Amenity areas
|
||||
|
||||
##### Tape Lighting
|
||||
### Tape Lighting
|
||||
|
||||
Also called "cove" or "strip",
|
||||
however those terms are less specific
|
||||
@@ -156,7 +141,7 @@ A - Surface: Tape - 4.0hr (43-48ft) - MC #12 40ft
|
||||
A - Surface: Tape - 4.5hr (49-54ft) - MC #12 40ft
|
||||
```
|
||||
|
||||
#### Recessed
|
||||
## Recessed
|
||||
|
||||
> [!info] Recessed Fixtures
|
||||
> * recessed downlight
|
||||
@@ -176,7 +161,7 @@ round up to the nearest 5ft
|
||||
> [!note]
|
||||
> "HI HAT" refers to a recessed can fixture.
|
||||
|
||||
#### Undercabinet Fixtures
|
||||
## Undercabinet Fixtures
|
||||
|
||||
| Wiring Method | Assembly Path |
|
||||
| ------------- | ------------------------------------- |
|
||||
@@ -188,7 +173,7 @@ round up to the nearest 5ft
|
||||
|
||||
Use 10ft \#12/2 for MC & NM
|
||||
|
||||
#### Paddle Fans
|
||||
## Paddle Fans
|
||||
|
||||
| Wiring Method | Assembly Path |
|
||||
| ------------- | ----------------------------------------------------- |
|
||||
@@ -196,58 +181,57 @@ Use 10ft \#12/2 for MC & NM
|
||||
| MC Cable | `MC ASSEMBLIES`/`FAN RATED OCT BOX W/ BAR HNGR - ...` |
|
||||
| PVC | `PVC/ENT ASSEMBLIES`/`... - SLAB BOX / 45 DEG STUBBY` |
|
||||
|
||||
#### Stairwells & Elevators
|
||||
## Stairwells & Elevators
|
||||
|
||||
`PVC/ENT ASSEMBLIES`/`... - SLAB BOX / 45 DEG STUBBY`
|
||||
|
||||
#### Facade
|
||||
## Facade
|
||||
|
||||
> `Phase` = "Facade"
|
||||
|
||||
Length and Labor will be more than a normal fixture in BOH/Amenity
|
||||
|
||||
> | Fixture Type | Labor (hrs) |
|
||||
> | ------------ | ----------- |
|
||||
> | Non-Linear | 2 |
|
||||
> | Linear | See above |
|
||||
| Fixture Type | Labor (hrs) |
|
||||
| ------------ | ----------- |
|
||||
| Non-Linear | 2 |
|
||||
| Linear | See above |
|
||||
|
||||
> 1. `3/4" PVC W/ 3#10 - STL BOX & TILE RING / 45 DEG STUBBY/ ENT DROP`
|
||||
> * `Length per Unit` = Distance to panel
|
||||
|
||||
#### Porte Cochere (Drive up Area)
|
||||
## Porte Cochere (Drive up Area)
|
||||
|
||||
Create its own breakout in WBS, and phase in Accubid
|
||||
|
||||
> [!quote]
|
||||
> This is not technically exposed or drop ceiling, but still use PVC
|
||||
|
||||
#### FAA Lighting
|
||||
## FAA Lighting
|
||||
|
||||
> 1. `FIXTURE LABOR`/`FIXTURE LABOR 1HR`
|
||||
> 2. `FESTOON & ROOF ASSEMBLIES`/`Aircraft Warning, 3/4" Conduit GRC/PVC 2#10, 1#10G`
|
||||
|
||||
### Site & Courtyard
|
||||
## Site & Courtyard
|
||||
|
||||
#### Breakdowns
|
||||
### Breakdowns
|
||||
|
||||
> System: "FML - Site Fixtures Material & Labor"
|
||||
|
||||
#### Fixture Assemblies
|
||||
### Fixture Assemblies
|
||||
|
||||
> | Fixture Type | Assembly Path |
|
||||
> | ------------------------------------ | -------------------------------------------------------------------------------- |
|
||||
> | Step Light | `COURTYARDS & LANDSCAPE`/`STEP FIX, 3/4" CONDUIT - PVC40 - ...` |
|
||||
> | Bollard | `COURTYARDS & LANDSCAPE`/`BOLLARD, 3/4" CONDUIT - PVC40 - ...`[^6] |
|
||||
> | Up-light | `COURTYARDS & LANDSCAPE`/`PERMA POST, 3/4" CONDUIT - PVC40 - ...` |
|
||||
> | In-grade up-light | `COURTYARDS & LANDSCAPE`/`3/4" CONDUIT - PVC40, IMC Elbow, ...` |
|
||||
> | Fixtures built into cabanas/pergolas | `COURTYARDS & LANDSCAPE`/`ALUM BOX W/ FLEX FIX, 3/4" CONDUIT - PVC40 - ...` |
|
||||
> | Handrail light | `COURTYARDS & LANDSCAPE`/`ALUM BOX W/ FLEX FIX, 3/4" CONDUIT - PVC40 - ...`[^7] |
|
||||
>
|
||||
> [^6]: If we don't own concrete, delete Pre-cast bollard base from assembly
|
||||
>
|
||||
> [^7]: Per Corwin: Hand rail lights should have a rigid 90 stub up and some flex
|
||||
| Fixture Type | Assembly Path |
|
||||
| ------------------------------------ | -------------------------------------------------------------------------------- |
|
||||
| Step Light | `COURTYARDS & LANDSCAPE`/`STEP FIX, 3/4" CONDUIT - PVC40 - ...` |
|
||||
| Bollard | `COURTYARDS & LANDSCAPE`/`BOLLARD, 3/4" CONDUIT - PVC40 - ...`[^1] |
|
||||
| Up-light | `COURTYARDS & LANDSCAPE`/`PERMA POST, 3/4" CONDUIT - PVC40 - ...` |
|
||||
| In-grade up-light | `COURTYARDS & LANDSCAPE`/`3/4" CONDUIT - PVC40, IMC Elbow, ...` |
|
||||
| Fixtures built into cabanas/pergolas | `COURTYARDS & LANDSCAPE`/`ALUM BOX W/ FLEX FIX, 3/4" CONDUIT - PVC40 - ...` |
|
||||
| Handrail light | `COURTYARDS & LANDSCAPE`/`ALUM BOX W/ FLEX FIX, 3/4" CONDUIT - PVC40 - ...`[^2] |
|
||||
|
||||
##### Festoon Lighting
|
||||
[^1]: If we don't own concrete, delete Pre-cast bollard base from assembly
|
||||
[^2]: Per Corwin: Hand rail lights should have a rigid 90 stub up and some flex
|
||||
|
||||
### Festoon Lighting
|
||||
|
||||
> AKA "string" or "market" lights
|
||||
|
||||
@@ -256,5 +240,3 @@ Create its own breakout in WBS, and phase in Accubid
|
||||
> * `Length per Unit` = Light string length
|
||||
> 3. `COURTYARDS & LANDSCAPE`/`ALUM BOX W/ FLEX FIX, 3/4" CONDUIT - PVC40 - ...`
|
||||
> * `Length per Unit` = Distance to panel + 15ft
|
||||
|
||||
### Takeoff
|
||||
+32
@@ -0,0 +1,32 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags:
|
||||
- systems/fixtures
|
||||
---
|
||||
# Fixtures
|
||||
|
||||
## Info
|
||||
|
||||
## Sequence
|
||||
|
||||
### 1. Estimate preparation
|
||||
|
||||
1. Read about the project specifications and construction type
|
||||
2. In drawings, locate:
|
||||
* Fixture Schedule
|
||||
* Reflected Ceiling Plans
|
||||
|
||||
### 2. Takeoff
|
||||
|
||||
See [[fixture-designations]].
|
||||
|
||||
1. Takeoff floor plans in order
|
||||
2. Takeoff enlarged drawings
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
|
||||
1. Garage Homeruns
|
||||
2. Luminaire in Amenity Areas
|
||||
3. Ensure appropriate breakdowns
|
||||
* Site lighting in System =="Site Misc. Fixtures"==
|
||||
+3
-1
@@ -1,6 +1,8 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags:
|
||||
|
||||
- risk
|
||||
---
|
||||
# Gold Plating
|
||||
|
||||
|
||||
@@ -1,3 +1,9 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags:
|
||||
- risk
|
||||
---
|
||||
# Gut Feel
|
||||
|
||||
Gut feel is the sensation one acquires with subject experience
|
||||
|
||||
@@ -1,7 +1,8 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags: []
|
||||
id:
|
||||
aliases:
|
||||
tags:
|
||||
- systems/electrical
|
||||
---
|
||||
# Lighting Controls
|
||||
|
||||
@@ -17,8 +18,6 @@ All these control methods are likely to appear in drawings.
|
||||
|
||||
## Conventions
|
||||
|
||||
By PDI convention, lighting controls are generally "Electrical", not "Lighting".
|
||||
|
||||
> [!info] "Local Control" as a PDI proposal qualification
|
||||
> The term "local control only" is sometimes used to indicate
|
||||
> no consideration for _any_ lighting control beyond standard devices,
|
||||
@@ -33,4 +32,4 @@ By PDI convention, lighting controls are generally "Electrical", not "Lighting".
|
||||
#### Custom Switch Boxes
|
||||
|
||||
For switch combinations not in `COMMON ASSEMBLIES`,
|
||||
create heating [[designations]] based on the most similar.
|
||||
create heating designations based on the most similar.
|
||||
@@ -1,7 +1,8 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags: []
|
||||
tags:
|
||||
- systems/lightning-protection
|
||||
---
|
||||
# Lightning Protection
|
||||
|
||||
@@ -0,0 +1,60 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags:
|
||||
- systems/low-voltage
|
||||
---
|
||||
# Low Voltage
|
||||
|
||||
## Sequence
|
||||
|
||||
### 1. Estimate preparation
|
||||
|
||||
## Telecom - Riser
|
||||
|
||||
1. Service entrance conduit "Site Low Voltage Ductbank (SLVDB)"
|
||||
2. Riser throughout building
|
||||
3. Sleeving for riser
|
||||
|
||||
## Telecom - Devices
|
||||
|
||||
1. Locate Proposal/Scope of Work. Determine ownership and takeoff responsibility:
|
||||
* Cabling
|
||||
* Conduit & Pathways
|
||||
* Sleeving
|
||||
2. Locate which plans the LV is taken off on
|
||||
3. Locate LV Details
|
||||
4. Read about the project specifications and construction type
|
||||
5. Fill out OneNote
|
||||
|
||||
### 2. Takeoff
|
||||
|
||||
1. Takeoff devices as shown throughout the building
|
||||
2. Takeoff Conduit Riser as needed
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
|
||||
1. Sleeving
|
||||
|
||||
## Low Voltage
|
||||
|
||||
### 1. Estimate preparation
|
||||
|
||||
1. Locate Proposal/Scope of Work. Determine ownership and takeoff responsibility:
|
||||
* Cabling
|
||||
* Conduit & Pathways
|
||||
* Sleeving
|
||||
2. In the drawings, locate:
|
||||
* Floor plans where LV scope is shown
|
||||
* LV Details
|
||||
3. Read about the project specifications and construction type
|
||||
4. Fill out OneNote
|
||||
|
||||
### 2. Takeoff
|
||||
|
||||
1. Takeoff devices as shown throughout the building
|
||||
2. Takeoff riser conduit as needed
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
|
||||
1. Sleeving for riser
|
||||
@@ -1,28 +1,12 @@
|
||||
---
|
||||
id: electrical
|
||||
id:
|
||||
aliases: []
|
||||
tags: []
|
||||
tags:
|
||||
- systems
|
||||
---
|
||||
# Final SOE
|
||||
# Misc Budgets
|
||||
|
||||
## 1. Trash Chute
|
||||
|
||||
Horizontal:
|
||||
* Check if shown on power drawings as mech connection
|
||||
* If not, use 100ft length
|
||||
|
||||
Vertical (Riser):
|
||||
* Takeoff: `COMMON ASSEMBLIES`/`MISC ASSEMBLIES`/`TRASH CHUTE RISER CIRCUIT...`
|
||||
* Uncheck Link 'Enable Livecount'
|
||||
* Takeoff in Typical
|
||||
* Length = average floor to floor height
|
||||
|
||||
## 2. CU/IP
|
||||
|
||||
* Units Condensing Unit
|
||||
* Mechanical Connection
|
||||
|
||||
## 3. Slab Deck
|
||||
## Slab Deck
|
||||
|
||||
Create Area Typicals for every Concrete slab floor:
|
||||
|
||||
@@ -36,9 +20,9 @@ Create Area Typicals for every Concrete slab floor:
|
||||
* Takeoff: `ITEM DATABASE`/`MISC PDI PRODUCT`/`MISC MATERIAL - SLAB/DECK & FEEDER`/`MISC MATERIAL - SLAB/DECK (NAILS, PAINT, TAPE, ETC = $250)`
|
||||
* 1 Takeoff each Typical, Count = 1
|
||||
|
||||
## 4. Temporary Power & Lighting
|
||||
## Temporary Power & Lighting
|
||||
|
||||
### 4.1 Temp Power
|
||||
### Temp Power
|
||||
|
||||
```
|
||||
Area = "2 - Site"
|
||||
@@ -50,7 +34,7 @@ BidItem = "1 - Site"
|
||||
Hoxton Hotel (aka Nashville Hotel)
|
||||
* Takeoff: `ITEM DATABASE`/`TEMPORARY POWER`/`TEMPORARY POWER - * SERVICE`
|
||||
|
||||
### 4.2A Temp Lighting (Building)
|
||||
### Temp Lighting (Building)
|
||||
|
||||
```
|
||||
Area = "01 - Temp Power Distribution Building"
|
||||
@@ -66,7 +50,7 @@ Garden Styles:
|
||||
* Takeoff: `ITEM DATABASE`/`TEMPORARY POWER`/`TEMPORARY POWER - T POLE (EACH)`
|
||||
* _Count_ = 1 per 150' per building
|
||||
|
||||
### 4.2B Temp Lighting (Garage)
|
||||
### Temp Lighting (Garage)
|
||||
|
||||
```
|
||||
Area = "01 - Temp Power Distribution Building"
|
||||
@@ -78,7 +62,7 @@ BidItem = "3 - Building"
|
||||
* Takeoff: `ITEM DATABASE`/`TEMPORARY POWER`/`* - TEMPORARY LIGHTING / PWR PNL (PER BLDG AREA SFT)`
|
||||
* _Count_ = Garage SF
|
||||
|
||||
## 5. Irrigation pumps
|
||||
## Irrigation pumps
|
||||
|
||||
```
|
||||
Area = "2 - Site"
|
||||
@@ -87,5 +71,5 @@ System = `MISC - Site Miscellaneous`
|
||||
BidItem = "1 - Site"
|
||||
```
|
||||
|
||||
* (3) 3Phase 30A 200' Mech. Con.
|
||||
* (3) 3Phase 30A 200' Mech. Con. EMT Carflex
|
||||
* Append to name: "Irrigation Pump - "
|
||||
@@ -1,3 +1,9 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags:
|
||||
- risk
|
||||
---
|
||||
# Monte Carlo Methods
|
||||
|
||||
> [!quote]
|
||||
|
||||
@@ -1,5 +1,9 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags:
|
||||
- automation
|
||||
- professional
|
||||
- software
|
||||
---
|
||||
# Necessary Automation
|
||||
@@ -73,4 +77,4 @@ Sublime is a friendly option for non-technical users.
|
||||
|
||||
```
|
||||
3#12 #12G 3/4"C
|
||||
```
|
||||
```
|
||||
@@ -1,14 +0,0 @@
|
||||
---
|
||||
id: abbreviations
|
||||
aliases:
|
||||
tags:
|
||||
---
|
||||
# Abbreviations
|
||||
|
||||
## Americans with Disabilities Act (ADA)
|
||||
|
||||
* hearing impaired (HI or H.I.)
|
||||
* mobility features (MF or M.F.)
|
||||
* accessible (Acc.)
|
||||
* usually refers to mobility features.
|
||||
|
||||
@@ -1,7 +0,0 @@
|
||||
# General Reprogramming
|
||||
|
||||
## "WBS"
|
||||
|
||||
What is called a "WBS" is not one and is not intended to be.
|
||||
It is a macro monolith excel document
|
||||
used to extend or replace Accubid's default closeout.
|
||||
@@ -1,82 +0,0 @@
|
||||
---
|
||||
id: breakdowns
|
||||
aliases: []
|
||||
tags: []
|
||||
---
|
||||
# Breakdowns
|
||||
|
||||
Managing breakdowns is the most time consuming part of takeoff.
|
||||
Assembly selection is comparatively quick compared to Anywhere.
|
||||
|
||||
## Site
|
||||
|
||||
Area: "2 - Site"
|
||||
Phase: "Site"
|
||||
|
||||
## Garage
|
||||
|
||||
### General
|
||||
|
||||
Area: "XX - Level P1 Garage"
|
||||
Phase: "Garage"
|
||||
|
||||
### Stairwells
|
||||
|
||||
Area: "S - Stairwells Garage"
|
||||
Phase: "Garage"
|
||||
|
||||
## Building
|
||||
|
||||
### General
|
||||
|
||||
Area: "XX - Level XX Building"
|
||||
Phase: "Building - BOH, Storage & Common"
|
||||
|
||||
### Corridors
|
||||
|
||||
Area: "XX - Level XX Building"
|
||||
Phase: "Building - Corridors"
|
||||
|
||||
### Stairwells
|
||||
|
||||
Area: "S - Stairwells Building"
|
||||
Phase: "Building - BOH, Storage & Common"
|
||||
|
||||
### Rentable
|
||||
|
||||
#### Residential
|
||||
|
||||
Area: "XX - Level XX Building"
|
||||
Phase: "Unit Residential"
|
||||
|
||||
#### Hotel
|
||||
|
||||
Area: "XX - Level XX Building"
|
||||
Phase: "Unit Key"
|
||||
|
||||
### Interior Amenity
|
||||
|
||||
#### General
|
||||
|
||||
Area: "XX - Level XX Amenity Building"
|
||||
Phase: "Interior Amenity"
|
||||
|
||||
#### Kitchen
|
||||
|
||||
Area: "XX - Level XX Kitchen Building"
|
||||
Phase: "Kitchen"
|
||||
|
||||
#### Retail
|
||||
|
||||
Area: "XX - Level XX Retail Building"
|
||||
Phase: "Retail"
|
||||
|
||||
#### Ballroom
|
||||
|
||||
Area: "XX - Level XX Ballroom Building"
|
||||
Phase: "Ballrooms"
|
||||
|
||||
### Exterior Amenity
|
||||
|
||||
Area: "XX - Level XX Exterior Amenity Building"
|
||||
Phase: "Exterior Amenity (Courtyards, Pool Decks)"
|
||||
@@ -1,15 +0,0 @@
|
||||
---
|
||||
id: designations
|
||||
aliases: []
|
||||
tags: []
|
||||
---
|
||||
# Designations
|
||||
|
||||
## Building Designations
|
||||
|
||||
## Modifying Designations
|
||||
|
||||
> [!tip]
|
||||
> It is generally easier to rebuild a designation than to modify it.
|
||||
> For designations with existing takeoffs, Right-Click > `Empty Designation`.
|
||||
> The build process can then be completed anew.
|
||||
@@ -1,69 +0,0 @@
|
||||
# Project Setup
|
||||
|
||||
## Create Project Folder
|
||||
|
||||
```pwsh
|
||||
# Copy template folder to
|
||||
Set-Location "\\EgnyteDrive\Shared\Estimating\7 ConEst Team\Projects\ConEst 2025\"
|
||||
Copy-Item ".\z.Template Folder\" ".\$region\$projectName"
|
||||
```
|
||||
|
||||
## Download Project Documents
|
||||
|
||||
```
|
||||
Set-Location ".\$region\$projectName"
|
||||
# Download docs from BPM to ".\3. Plans & Spec's"
|
||||
# TODO: Automate
|
||||
|
||||
# copying from "\\EgnyteDrive\Shared\Estimating\$region\00 Open Bids\$projectName"
|
||||
# may be more practical
|
||||
```
|
||||
|
||||
## Create Unit Matrix
|
||||
|
||||
See Architecturals
|
||||
|
||||
## Create Area Breakout
|
||||
|
||||
`SF Calcs.xlsx`
|
||||
|
||||
## Create Blank WBS
|
||||
|
||||
```pwsh
|
||||
Set-Location "\\EgnyteDrive\Shared\Estimating\19 WBS Agreement GP"
|
||||
Copy-Item ".\1. Wizard Template - WBS\MEP Wizard v3.111.4 (7-21-2025)(Summary Adjustments).xlsm" \
|
||||
".\2. Blank Project WBS\2025\$projectName WBS $date.xlsm"
|
||||
```
|
||||
|
||||
## Create LiveCount Project
|
||||
|
||||
- In [Trimble Connect](https://web.connect.trimble.com),
|
||||
find the project "CONEST TEMPLATE",
|
||||
open its context menu,
|
||||
then click "Use as template for a new project".
|
||||
- Ensure all checkboxes are checked,
|
||||
then click `Next`.
|
||||
- Name with format "{Project Name} - ConEst".
|
||||
|
||||
Refresh the page and open the newly created project.
|
||||
|
||||
## Upload Drawings to LiveCount
|
||||
|
||||
```
|
||||
# Extract drawings to ".\Trimble Connect (Plans)"
|
||||
```
|
||||
|
||||
Upload extracted drawings to LiveCount
|
||||
|
||||
## Create Accubid Job
|
||||
|
||||
> [!important]
|
||||
> The LiveCount project must be created **before** creating the Accubid job.
|
||||
|
||||
- Create a new Accubid job:
|
||||
Path: "\\EgnyteDrive\Shared\Trimble\Accubid\Bid\{Project Name} - ConEst.es16"
|
||||
|
||||
## Add Drawings to Accubid Job
|
||||
|
||||
- In the LiveCount window, find `Document Manager` > `Select Existing Project`.
|
||||
Add all previously uploaded drawings.
|
||||
@@ -1,287 +0,0 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags: []
|
||||
---
|
||||
# Sequence
|
||||
|
||||
## Electrical
|
||||
|
||||
### 1. Estimate preparation
|
||||
|
||||
2. Read about the project specifications and construction type
|
||||
3. Locate Equipment Schedules
|
||||
|
||||
4. Device specs (Decora or Standard)
|
||||
|
||||
### 2. Takeoff
|
||||
|
||||
1. Takeoff all equipment that is not #12
|
||||
2. Go by Drawing in chronological order
|
||||
3. Takeoff Enlarged Drawings
|
||||
4. Do final checklist in electrical takeoff notes
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
|
||||
1. Count Car chargers and location
|
||||
|
||||
## Feeders
|
||||
|
||||
### 1. Estimate preparation
|
||||
|
||||
Read about the project specifications and construction type
|
||||
|
||||
* Delivery Method: (Plans & Specs, Design Build, Design Assist, Preliminary Budget)
|
||||
* Deck thickness
|
||||
* Wiring method
|
||||
* Conductor material (Aluminum/Copper)
|
||||
|
||||
Locate:
|
||||
* Riser Diagram
|
||||
* Feeder Schedule (if present)
|
||||
* Main Electrical rooms and panel locations
|
||||
* Routing (if present)
|
||||
|
||||
### 2. Takeoff
|
||||
|
||||
* Choose a starting point on the riser
|
||||
* Determine wire & Conduit makeup (3Ph/1Ph, AL/CU, Conduit)
|
||||
* Measure off the length of the feed _ADDERS_
|
||||
* Square corners, use corridors if possible
|
||||
|
||||
Bus Duct
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
|
||||
## Fire Alarm - Riser
|
||||
|
||||
### 1. Estimate preparation
|
||||
|
||||
1. Initial the OneNote
|
||||
2. Find Fire Alarm plans (If Applicable)
|
||||
3. Locate Fire Command Center (FCC)
|
||||
|
||||
### 2. Takeoff
|
||||
|
||||
1. Use the FA Riser Script
|
||||
2. Takeoff Devices
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
|
||||
1. Sleeving for riser?
|
||||
2. Are Two-Way/DAS Included?
|
||||
|
||||
## Fire Alarm - Devices
|
||||
|
||||
### 1. Estimate preparation
|
||||
|
||||
2. Read about the project specifications and construction type
|
||||
3. Find FA drawings or where they are shown
|
||||
|
||||
### 2. Takeoff
|
||||
|
||||
1. Takeoff floor plans in order
|
||||
2. Takeoff enlarged drawings
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
|
||||
8. Fire Smoke Dampers (FSD's) FA or electrical?
|
||||
9. Sleeving?
|
||||
|
||||
## Lighting
|
||||
|
||||
### 1. Estimate preparation
|
||||
|
||||
1. Read about the project specifications and construction type
|
||||
2. In drawings, locate:
|
||||
* Fixture Schedule
|
||||
* Reflected Ceiling Plans
|
||||
|
||||
### 2. Takeoff
|
||||
|
||||
1. Takeoff floor plans in order
|
||||
2. Takeoff enlarged drawings
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
|
||||
1. Garage Homeruns
|
||||
2. Luminaire in Amenity Areas
|
||||
3. Ensure appropriate breakdowns
|
||||
* Site lighting in System =="Site Misc. Fixtures"==
|
||||
|
||||
## Units
|
||||
|
||||
### 1. Estimate preparation
|
||||
|
||||
1. Locate Unit panels and relevant keynotes
|
||||
* Bus amps
|
||||
|
||||
2. Read about the project specifications and construction type
|
||||
* Wood or Metal studs
|
||||
* Wiring Method
|
||||
* NM or MC
|
||||
* Wiring device plates
|
||||
* Decora or Standard
|
||||
* Wiring device specs
|
||||
* are 15A devices allowed?
|
||||
* Equipment (20A Kitchen and bath)
|
||||
|
||||
3. Fill out OneNote
|
||||
|
||||
### 2. Takeoff
|
||||
|
||||
1. Kitchen and Bath
|
||||
2. General assemblies
|
||||
3. Low Voltage
|
||||
4. Lighting Control
|
||||
5. Lighting Fixtures
|
||||
|
||||
Copy paste original takeoff and adjust to changes
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
|
||||
1. Scroll through with Area selected and make sure there is takeoff for each unit type
|
||||
|
||||
## Telecom - Devices
|
||||
|
||||
### 1. Estimate preparation
|
||||
|
||||
1. Locate Proposal/Scope of Work. Determine ownership and takeoff responsibility:
|
||||
* Cabling
|
||||
* Conduit & Pathways
|
||||
* Sleeving
|
||||
2. Locate which plans the LV is taken off on
|
||||
3. Locate LV Details
|
||||
4. Read about the project specifications and construction type
|
||||
5. Fill out OneNote
|
||||
|
||||
### 2. Takeoff
|
||||
|
||||
1. Takeoff devices as shown throughout the building
|
||||
2. Takeoff Conduit Riser as needed
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
|
||||
1. Sleeving
|
||||
|
||||
## Telecom - Riser
|
||||
|
||||
1. Service entrance conduit "Site Low Voltage Ductbank (SLVDB)"
|
||||
2. Riser throughout building
|
||||
3. Sleeving for riser
|
||||
|
||||
## Subfeeds
|
||||
|
||||
### 1. Estimate preparation
|
||||
|
||||
1. Read about the project specifications and construction type
|
||||
* Delivery Method: (Plans & Specs, Design Build, Design Assist, Preliminary Budget)
|
||||
* Deck Thickness
|
||||
* Corridor Ceiling type
|
||||
|
||||
2. In the drawings, locate:
|
||||
* Unit Panel Schedules
|
||||
* Unit Load Calculations
|
||||
* Riser Diagram
|
||||
* Subfeed schedule (if present)
|
||||
|
||||
### 2. Takeoff
|
||||
|
||||
1. Determine wiring method
|
||||
|
||||
| Construction Type | Wiring Method | Subfeed Options |
|
||||
| ----------------- | ------------- | --------------- |
|
||||
| 1,2 | MC Cable | MC, PVC, EMT |
|
||||
| 3,4,5 | NM Cable | SER, EMT |
|
||||
|
||||
%%
|
||||
TODO: Create flow chart for wiring methods.
|
||||
Some cases to mention:
|
||||
* Deck thickness (minimum 3x conduit outer diameter)
|
||||
* Renovations (may not be able to run in slab)
|
||||
%%
|
||||
|
||||
2. Route subfeeds to the Meter Centers using appropriate adder lengths
|
||||
|
||||
> [!tip]
|
||||
> Identify if and where typicals can be used
|
||||
|
||||
3. Assign material to lengths and apply Voltage drop if applicable
|
||||
|
||||
4. Pigtails and Wireway Troughs if applicable
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
|
||||
1. Use the extension tab to determine the Correct Quantity
|
||||
|
||||
## Switchgear
|
||||
|
||||
### 1. Estimate preparation
|
||||
|
||||
1. Initial the OneNote
|
||||
2. In the drawings, locate:
|
||||
* Riser Diagrams
|
||||
* House Panels
|
||||
|
||||
### 2. Takeoff
|
||||
|
||||
1. Copy over the Temporary assemblies from "Ben -1"
|
||||
2. Build Items in Distribution:
|
||||
* Panelboards
|
||||
* Switchboards
|
||||
* Transfer SWs
|
||||
* Meter centers
|
||||
* Generator
|
||||
3. Takeoff Common Assemblies:
|
||||
* XFMRs
|
||||
* Disconnect Switches
|
||||
* Bus Duct
|
||||
4. Takeoff Items in Item Database:
|
||||
* Wireway (Trough/Gutter)
|
||||
5. Takeoff Temp Assemblies:
|
||||
* CT Cabinet
|
||||
* Meter
|
||||
* Fire Pump
|
||||
* Fire Pump Controller
|
||||
* SPD/TVSS
|
||||
|
||||
When building panelboards/switchboards,
|
||||
add terminations according to an example from the schedules.
|
||||
Do not include feeder terminations.
|
||||
|
||||
Items to Avoid:
|
||||
* Tap Boxes
|
||||
* Bus Duct
|
||||
* Vault Room
|
||||
* Anything FPL
|
||||
* Grounding
|
||||
* Elevator Room
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
|
||||
1. Generator
|
||||
* Ensure takeoff is in the generator Area and System breakdowns
|
||||
* Put location, quantity, and type on OneNote
|
||||
|
||||
## Low Voltage
|
||||
|
||||
### 1. Estimate preparation
|
||||
|
||||
1. Locate Proposal/Scope of Work. Determine ownership and takeoff responsibility:
|
||||
* Cabling
|
||||
* Conduit & Pathways
|
||||
* Sleeving
|
||||
2. In the drawings, locate:
|
||||
* Floor plans where LV scope is shown
|
||||
* LV Details
|
||||
3. Read about the project specifications and construction type
|
||||
4. Fill out OneNote
|
||||
|
||||
### 2. Takeoff
|
||||
|
||||
1. Takeoff devices as shown throughout the building
|
||||
2. Takeoff riser conduit as needed
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
|
||||
1. Sleeving for riser
|
||||
@@ -1,24 +0,0 @@
|
||||
# Unit Takeoff
|
||||
|
||||
"Units" includes [hotel](#hotel) and [residential](#residential) spaces.
|
||||
|
||||
> [!tip] Preparing for Unit Takeoff
|
||||
> Units generally have very little variation.
|
||||
> It is usually best to copy-paste takeoffs
|
||||
> rather than re-build them for each unit.
|
||||
|
||||
## Hotel
|
||||
|
||||
> [!info] Also Known As
|
||||
> * Guestrooms
|
||||
> * Keys
|
||||
|
||||
> [!trivia]
|
||||
> The origin of the term "key" as a synonym of "hotel room"
|
||||
> ...
|
||||
> %% TODO: %%
|
||||
|
||||
## Residential
|
||||
|
||||
> [!info] Also Known As
|
||||
> * Condos
|
||||
@@ -1,3 +1,10 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags:
|
||||
- professional
|
||||
- media
|
||||
---
|
||||
# NEW HIRE - ESTIMATOR
|
||||
|
||||
| | |
|
||||
@@ -44,5 +51,5 @@
|
||||
|
||||
## Goals
|
||||
|
||||
- Complete a full-take-off within first 6 months of start
|
||||
- Complete Accubid tabs within first year of start
|
||||
* Complete a full-take-off within first 6 months of start
|
||||
* Complete Accubid tabs within first year of start
|
||||
@@ -1,4 +1,10 @@
|
||||
# Open Problems
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags:
|
||||
- estimating
|
||||
---
|
||||
# Open Problems in Estimating
|
||||
|
||||
[[construction-estimating]] being a nascent and unstudied field,
|
||||
there are several fundamental questions of the craft
|
||||
@@ -1,3 +1,9 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags:
|
||||
- risk
|
||||
---
|
||||
# Perfect Information
|
||||
|
||||
In [[strategy]], perfect information is hypothetical information
|
||||
@@ -9,10 +15,10 @@ Expected value of perfect information (EVPI)
|
||||
is the price that one would be willing to pay
|
||||
in order to gain access to perfect information.
|
||||
|
||||
The perceived *value* of decreased uncertainty
|
||||
must be weighed against its *cost*.
|
||||
The perceived _value_ of decreased uncertainty
|
||||
must be weighed against its _cost_.
|
||||
|
||||
This concept provides the basis for the solution of one or more [[open-problems]].
|
||||
This concept provides the basis for the solution of one or more [[open-problems-in-estimating]].
|
||||
To reduce [[risk]] in [[construction-estimating]],
|
||||
an organization pays in estimator hours.
|
||||
These hours have a direct cost in salary and benefits,
|
||||
|
||||
@@ -1,5 +1,8 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags:
|
||||
- automation
|
||||
- software
|
||||
---
|
||||
# Possible Automation
|
||||
+7
-1
@@ -1,3 +1,9 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags:
|
||||
- automation
|
||||
---
|
||||
# PowerShell Document Conversion
|
||||
|
||||
PowerShell module to allow fluent conversion of "document" files,
|
||||
@@ -44,7 +50,7 @@ Run format specific linter on document.
|
||||
|
||||
## `Import-Document`
|
||||
|
||||
Return PSCustomObject with appropriate properties.
|
||||
Return PSCustomObject with appropriate properties.
|
||||
|
||||
***
|
||||
|
||||
@@ -1,3 +1,10 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags:
|
||||
- automation
|
||||
- professional
|
||||
---
|
||||
# Project Info
|
||||
|
||||
Standardize formatting and input methods for common
|
||||
@@ -21,4 +28,3 @@ To calculate regular quantities
|
||||
* conductor support
|
||||
* by area
|
||||
* temp power
|
||||
|
||||
@@ -0,0 +1,57 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags:
|
||||
- guide
|
||||
- professional
|
||||
next: setup-accubid
|
||||
---
|
||||
# Project Setup
|
||||
|
||||
## Create Project Folder
|
||||
|
||||
```pwsh
|
||||
# Copy template folder to
|
||||
Set-Location "\\EgnyteDrive\Shared\Estimating\7 ConEst Team\Projects\ConEst 2025\"
|
||||
Copy-Item ".\z.Template Folder\" ".\$region\$projectName"
|
||||
```
|
||||
|
||||
## Download Project Documents
|
||||
|
||||
```
|
||||
Set-Location ".\$region\$projectName"
|
||||
# Download docs from BPM to ".\3. Plans & Spec's"
|
||||
# TODO: Automate
|
||||
|
||||
# copying from "\\EgnyteDrive\Shared\Estimating\$region\00 Open Bids\$projectName"
|
||||
# may be more practical
|
||||
```
|
||||
|
||||
## Create Unit Matrix
|
||||
|
||||
See Architecturals
|
||||
|
||||
## Create Area Breakout
|
||||
|
||||
`SF Calcs.xlsx`
|
||||
|
||||
## Setup WBS
|
||||
|
||||
> [!info] "WBS"
|
||||
> What is called a "WBS" is not one and is not intended to be.
|
||||
> It is a macro monolith excel document
|
||||
> used to extend/replace Accubid's default closeout.
|
||||
|
||||
```pwsh
|
||||
Set-Location "\\EgnyteDrive\Shared\Estimating\19 WBS Agreement GP"
|
||||
Copy-Item ".\1. Wizard Template - WBS\MEP Wizard v3.111.4 (7-21-2025)(Summary Adjustments).xlsm" \
|
||||
".\2. Blank Project WBS\2025\$projectName WBS $date.xlsm"
|
||||
```
|
||||
|
||||
%%
|
||||
TODO: Continue WBS sequence.
|
||||
%%
|
||||
|
||||
## Setup Accubid
|
||||
|
||||
See [[accubid-setup]].
|
||||
@@ -1,7 +1,8 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags: []
|
||||
tags:
|
||||
- terminology
|
||||
---
|
||||
# Raceway Terms
|
||||
|
||||
@@ -1,9 +1,10 @@
|
||||
---
|
||||
id: risk-oriented-estimating
|
||||
aliases: []
|
||||
tags: []
|
||||
tags:
|
||||
- estimating
|
||||
- risk
|
||||
---
|
||||
|
||||
# Risk Oriented Estimating
|
||||
|
||||
Risk-Oriented Estimating (ROE), is a methodology for [[construction-estimating]] which
|
||||
@@ -19,6 +20,7 @@ as these ultimately _increase_ risk by inflating the apparent project cost,
|
||||
increasing the probability of loss to a competitor.
|
||||
|
||||
%%
|
||||
|
||||
## Scratch
|
||||
|
||||
Bid risk may fit a [Taleb distribution](https://en.wikipedia.org/wiki/Taleb_distribution).
|
||||
@@ -42,6 +44,7 @@ given an organization's [[risk#Risk Tolerance]].
|
||||
## EVPI Takeoff
|
||||
|
||||
%%
|
||||
|
||||
## Scratch
|
||||
|
||||
Expected value of perfect information (EVPI)
|
||||
@@ -51,8 +54,8 @@ Count-based takeoff speed increases with count.
|
||||
|
||||
Optimizing the takeoff process means:
|
||||
|
||||
* *Minimizing* the need for information outside of drawings
|
||||
* *Maximizing* organizational consistency
|
||||
* _Minimizing_ the need for information outside of drawings
|
||||
* _Maximizing_ organizational consistency
|
||||
|
||||
> [!note]
|
||||
> Recent events have complicated my philosophy above.
|
||||
@@ -61,4 +64,4 @@ Optimizing the takeoff process means:
|
||||
|
||||
> [!note] Naming Conventions (Use Case vs. Description)
|
||||
> Naming by use case is intuitive for those without estimating or field experience,
|
||||
> but has the side effect that those accustomed to the names will inevitably *treat them as descriptive*.
|
||||
> but has the side effect that those accustomed to the names will inevitably _treat them as descriptive_.
|
||||
|
||||
@@ -1,3 +1,9 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags:
|
||||
- organization
|
||||
---
|
||||
# Separation of Concerns
|
||||
|
||||
Separation of concerns is a design philosophy
|
||||
|
||||
+7
-1
@@ -1,3 +1,9 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags:
|
||||
- risk
|
||||
---
|
||||
# Strategy
|
||||
|
||||
The field of strategy is concerned with the optimal solutions of problematic scenarios.
|
||||
@@ -34,4 +40,4 @@ Project cost certainty
|
||||
|
||||
#### Expected Competition
|
||||
|
||||
### Estimation Strategy
|
||||
### Estimation Strategy
|
||||
|
||||
+51
@@ -0,0 +1,51 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags:
|
||||
- systems/subfeeds
|
||||
---
|
||||
# Subfeeds
|
||||
|
||||
## Sequence
|
||||
|
||||
### 1. Estimate preparation
|
||||
|
||||
1. Read about the project specifications and construction type
|
||||
* Delivery Method: (Plans & Specs, Design Build, Design Assist, Preliminary Budget)
|
||||
* Deck Thickness
|
||||
* Corridor Ceiling type
|
||||
|
||||
2. In the drawings, locate:
|
||||
* Unit Panel Schedules
|
||||
* Unit Load Calculations
|
||||
* Riser Diagram
|
||||
* Subfeed schedule (if present)
|
||||
|
||||
### 2. Takeoff
|
||||
|
||||
1. Determine wiring method
|
||||
|
||||
| Construction Type | Wiring Method | Subfeed Options |
|
||||
| ----------------- | ------------- | --------------- |
|
||||
| 1,2 | MC Cable | MC, PVC, EMT |
|
||||
| 3,4,5 | NM Cable | SER, EMT |
|
||||
|
||||
%%
|
||||
TODO: Create flow chart for wiring methods.
|
||||
Some cases to mention:
|
||||
* Deck thickness (minimum 3x conduit outer diameter)
|
||||
* Renovations (may not be able to run in slab)
|
||||
%%
|
||||
|
||||
2. Route subfeeds to the Meter Centers using appropriate adder lengths
|
||||
|
||||
> [!tip]
|
||||
> Identify if and where typicals can be used
|
||||
|
||||
3. Assign material to lengths and apply Voltage drop if applicable
|
||||
|
||||
4. Pigtails and Wireway Troughs if applicable
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
|
||||
1. Use the extension tab to determine the Correct Quantity
|
||||
+7
-1
@@ -1,3 +1,9 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags:
|
||||
- organization
|
||||
---
|
||||
# Supertopics
|
||||
|
||||
Supertopics are a concept that I use
|
||||
@@ -5,4 +11,4 @@ to visualize and categorize my knowledge and interests.
|
||||
|
||||
They are a group of topics that,
|
||||
while they may seem disparate in a vacuum,
|
||||
are all fundamental to a greater understanding of the whole.
|
||||
are all fundamental to a greater understanding of the whole.
|
||||
|
||||
@@ -0,0 +1,61 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags:
|
||||
- systems/switchgear
|
||||
---
|
||||
# Switchgear
|
||||
|
||||
## Sequence
|
||||
|
||||
### 1. Estimate preparation
|
||||
|
||||
1. Initial the OneNote
|
||||
2. In the drawings, locate:
|
||||
* Riser Diagrams
|
||||
* House Panels
|
||||
3. Copy over the Temporary assemblies from "Ben -1"
|
||||
|
||||
### 2. Takeoff
|
||||
|
||||
1. Build Items in Distribution:
|
||||
* Panelboards
|
||||
* Switchboards
|
||||
* Transfer SWs
|
||||
* Meter centers
|
||||
* Generator
|
||||
|
||||
2. Takeoff Common Assemblies:
|
||||
* XFMRs
|
||||
* Disconnect Switches
|
||||
* Bus Duct
|
||||
|
||||
3. Takeoff Items in Item Database:
|
||||
* Wireway (Trough/Gutter)
|
||||
|
||||
4. Takeoff Temp Assemblies:
|
||||
* CT Cabinet
|
||||
* Meter
|
||||
* Fire Pump
|
||||
* Fire Pump Controller
|
||||
* SPD/TVSS
|
||||
|
||||
When building panelboards/switchboards,
|
||||
add terminations according to an example from the schedules.
|
||||
**Do not include feeder terminations.**
|
||||
|
||||
Items to Avoid:
|
||||
* Tap Boxes
|
||||
* Bus Duct
|
||||
* Vault Room
|
||||
* Anything FPL
|
||||
* Grounding
|
||||
* Elevator Room
|
||||
|
||||
#### Generator
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
|
||||
1. Generator
|
||||
* Ensure takeoff is in the generator Area and System breakdowns
|
||||
* Put location, quantity, and type on OneNote
|
||||
+17
@@ -0,0 +1,17 @@
|
||||
---
|
||||
id:
|
||||
aliases:
|
||||
- '#systems'
|
||||
tags:
|
||||
- systems
|
||||
---
|
||||
# Systems
|
||||
|
||||
* [[electrical]]
|
||||
* [[feeders]]
|
||||
* [[fire-alarm]]
|
||||
* [[fixtures]]
|
||||
* [[lightning-protection]]
|
||||
* [[low-voltage]]
|
||||
* [[subfeeds]]
|
||||
* [[units]]
|
||||
@@ -1,16 +0,0 @@
|
||||
---
|
||||
id: {{title}}
|
||||
aliases: []
|
||||
tags: [
|
||||
- system
|
||||
]
|
||||
---
|
||||
# {{title}}
|
||||
|
||||
## Info
|
||||
|
||||
## Conventions
|
||||
|
||||
## Scope
|
||||
|
||||
### Takeoff
|
||||
+1
-3
@@ -1,11 +1,9 @@
|
||||
---
|
||||
tags:
|
||||
|
||||
- meta
|
||||
---
|
||||
# This Notebook
|
||||
|
||||
#meta
|
||||
|
||||
This journal is for [[me|my]] rough ideas that I'm likely to change my opinion on
|
||||
as my understanding of them develops.
|
||||
|
||||
|
||||
@@ -1,3 +1,9 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags:
|
||||
- estimating
|
||||
---
|
||||
# Traditional Estimating Methods
|
||||
|
||||
Also "single-point estimation" as opposed to the standard three-point.
|
||||
@@ -5,7 +11,7 @@ Also "single-point estimation" as opposed to the standard three-point.
|
||||
"Traditional estimating methods" as referenced frequently in [[this notebook]]
|
||||
are those [[construction-estimating]] methods that produce:
|
||||
|
||||
* an *exhaustive* and *specific* bill of material
|
||||
* an _exhaustive_ and _specific_ bill of material
|
||||
* a single, definitive final price for each bid item
|
||||
|
||||
Such methods lack the ability to intelligently express [[uncertainty]].
|
||||
|
||||
+2
-1
@@ -1,7 +1,8 @@
|
||||
---
|
||||
id: uncertainty
|
||||
aliases: []
|
||||
tags: []
|
||||
tags:
|
||||
- risk
|
||||
---
|
||||
# Uncertainty
|
||||
|
||||
|
||||
@@ -0,0 +1,71 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags:
|
||||
- systems/units
|
||||
---
|
||||
# Unit Takeoff
|
||||
|
||||
## Info
|
||||
|
||||
"Units" includes [hotel](#hotel) and [residential](#residential) spaces.
|
||||
|
||||
> [!tip] Preparing for Unit Takeoff
|
||||
> Units generally have very little variation.
|
||||
> It is usually best to copy-paste takeoffs
|
||||
> rather than re-build them for each unit.
|
||||
|
||||
> [!info] Americans with Disabilities Act (ADA) Terms
|
||||
> * hearing impaired (HI or H.I.)
|
||||
> * mobility features (MF or M.F.)
|
||||
> * accessible (Acc.)
|
||||
> * usually refers to mobility features.
|
||||
|
||||
### Hotel
|
||||
|
||||
> [!info] Also Known As
|
||||
> * Guestrooms
|
||||
> * Keys
|
||||
|
||||
> [!trivia]
|
||||
> The origin of the term "key" as a synonym of "hotel room"
|
||||
> ...
|
||||
> %% TODO: %%
|
||||
|
||||
### Residential
|
||||
|
||||
> [!info] Also Known As
|
||||
> * Condos
|
||||
|
||||
## Sequence
|
||||
|
||||
### 1. Estimate preparation
|
||||
|
||||
1. Locate Unit panels and relevant keynotes
|
||||
* Bus amps
|
||||
|
||||
2. Read about the project specifications and construction type
|
||||
* Wood or Metal studs
|
||||
* Wiring Method
|
||||
* NM or MC
|
||||
* Wiring device plates
|
||||
* Decora or Standard
|
||||
* Wiring device specs
|
||||
* are 15A devices allowed?
|
||||
* Equipment (20A Kitchen and bath)
|
||||
|
||||
3. Fill out OneNote
|
||||
|
||||
### 2. Takeoff
|
||||
|
||||
1. Kitchen and Bath
|
||||
2. General assemblies
|
||||
3. Low Voltage
|
||||
4. Lighting Control
|
||||
5. Lighting Fixtures
|
||||
|
||||
Copy paste original takeoff and adjust to changes
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
|
||||
1. Scroll through with Area selected and make sure there is takeoff for each unit type
|
||||