Files
zmVault/units.md
T

1.4 KiB

id, aliases, tags
id aliases tags
systems/units

Unit Takeoff

Info

"Units" includes hotel and residential spaces.

[!tip] Preparing for Unit Takeoff Units generally have very little variation. It is usually best to copy-paste takeoffs rather than re-build them for each unit.

[!info] Americans with Disabilities Act (ADA) Terms

  • hearing impaired (HI or H.I.)
  • mobility features (MF or M.F.)
  • accessible (Acc.)
    • usually refers to mobility features.

Hotel

[!info] Also Known As

  • Guestrooms
  • Keys

[!trivia] The origin of the term "key" as a synonym of "hotel room" ... %% TODO: %%

Residential

[!info] Also Known As

  • Condos

Sequence

1. Estimate preparation

  1. Locate Unit panels and relevant keynotes

    • Bus amps
  2. Read about the project specifications and construction type

  • Wood or Metal studs
  • Wiring Method
    • NM or MC
  • Wiring device plates
    • Decora or Standard
  • Wiring device specs
    • are 15A devices allowed?
  • Equipment (20A Kitchen and bath)
  1. Fill out OneNote

2. Takeoff

  1. Kitchen and Bath
  2. General assemblies
  3. Low Voltage
  4. Lighting Control
  5. Lighting Fixtures

Copy paste original takeoff and adjust to changes

3. Extension (Review and Checking)

  1. Scroll through with Area selected and make sure there is takeoff for each unit type