vault backup: 2025-07-24 16:44:33
This commit is contained in:
+85
@@ -0,0 +1,85 @@
|
||||
---
|
||||
id: feeders
|
||||
aliases: []
|
||||
tags:
|
||||
- systems/feeders
|
||||
---
|
||||
# Feeders
|
||||
|
||||
## Info
|
||||
|
||||
## Sequence
|
||||
|
||||
### 1. Estimate preparation
|
||||
|
||||
Read about the project specifications and construction type:
|
||||
* Delivery Method (Plans & Specs, Design Build, Design Assist, Preliminary Budget)
|
||||
* Deck thickness
|
||||
* Wiring method
|
||||
* Conductor material (Aluminum/Copper)
|
||||
|
||||
Locate:
|
||||
* Riser Diagram
|
||||
* Feeder Schedule (if present)
|
||||
* Main Electrical rooms and panel locations
|
||||
* Routing (if present)
|
||||
|
||||
### 2. Takeoff
|
||||
|
||||
* Choose a starting point on the riser
|
||||
* Determine wire & Conduit makeup (3Ph/1Ph, AL/CU, Conduit)
|
||||
* Measure off the length of the feed _ADDERS_
|
||||
* Square corners, use corridors if possible
|
||||
|
||||
> [!important]
|
||||
> All takeoffs in Systems with names including "site"
|
||||
> should be in "Site" Area, Phase, and Bid Item breakdowns.
|
||||
|
||||
> [!important]
|
||||
> Use 15ft adders for site runs
|
||||
> (primaries, secondaries, etc.),
|
||||
> as opposed to standard 10ft adder,
|
||||
> to account for variability.
|
||||
|
||||
#### Primaries
|
||||
|
||||
#### Secondaries
|
||||
|
||||
#### Feeders
|
||||
|
||||
#### Bus Duct
|
||||
|
||||
#### Cable Support
|
||||
|
||||
> [!quote] 300.19 Supporting Conductors in Vertical Raceways.
|
||||
> **(A) Spacing Intervals -- Maximum.**
|
||||
> Conductors in vertical raceways shall be supported
|
||||
> if the vertical rise exceeds the values in Table 300.19(A).
|
||||
> At least one support method shall be provided for each conductor
|
||||
> at the top of the vertical raceway or as close to the top as practical.
|
||||
> Intermediate supports shall be provided
|
||||
> as necessary to limit supported conductor lengths
|
||||
> to not greater than those values specified in Table 300.19(A).
|
||||
|
||||
> [!cite] Table 300.19(A) Spacings for Conductor Supports
|
||||
>
|
||||
> | Conductor Size | Aluminum or Copper-Clad Aluminum | Copper |
|
||||
> | -------------------------------- | --------------------------------:| ------:|
|
||||
> | 18 AWG through 8 AWG | 100ft | 100ft |
|
||||
> | 6 AWG through 1/0 AWG | 200ft | 100ft |
|
||||
> | 2/0 AWG through 4/0 AWG | 180ft | 80ft |
|
||||
> | Over 4/0 AWG through 350 kcmil | 135ft | 60ft |
|
||||
> | Over 350 kcmil through 500 kcmil | 120ft | 50ft |
|
||||
> | Over 500 kcmil through 750 kcmil | 95ft | 40ft |
|
||||
> | Over 750 kcmil | 85ft | 35ft |
|
||||
|
||||
#### Sleeving
|
||||
|
||||
Provide sleeves for all feeder conduits passing through floors.
|
||||
|
||||
* ID.31 Hilti
|
||||
* P = Plastic => Concrete
|
||||
* M = Metal => Wood Frame
|
||||
* Round 1" to 2"
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
Reference in New Issue
Block a user