# Switchgear
|
||||
|
||||
## Sequence
|
||||
|
||||
### 1. Estimate preparation
|
||||
|
||||
1. Initial the OneNote
|
||||
2. In the drawings, locate:
|
||||
* Riser Diagrams
|
||||
* House Panels
|
||||
3. Copy over the Temporary assemblies from "Ben -1"
|
||||
|
||||
### 2. Takeoff
|
||||
|
||||
1. Build Items in Distribution:
|
||||
* Panelboards
|
||||
* Switchboards
|
||||
* Transfer SWs
|
||||
* Meter centers
|
||||
* Generator
|
||||
|
||||
2. Takeoff Common Assemblies:
|
||||
* XFMRs
|
||||
* Disconnect Switches
|
||||
* Bus Duct
|
||||
|
||||
3. Takeoff Items in Item Database:
|
||||
* Wireway (Trough/Gutter)
|
||||
|
||||
4. Takeoff Temp Assemblies:
|
||||
* CT Cabinet
|
||||
* Meter
|
||||
* Fire Pump
|
||||
* Fire Pump Controller
|
||||
* SPD/TVSS
|
||||
|
||||
When building panelboards/switchboards,
|
||||
add terminations according to an example from the schedules.
|
||||
**Do not include feeder terminations.**
|
||||
|
||||
Items to Avoid:
|
||||
* Tap Boxes
|
||||
* Bus Duct
|
||||
* Vault Room
|
||||
* Anything FPL
|
||||
* Grounding
|
||||
* Elevator Room
|
||||
|
||||
#### Generator
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
|
||||
1. Generator
|
||||
* Ensure takeoff is in the generator Area and System breakdowns
|
||||
* Put location, quantity, and type on OneNote
|
||||