# Traditional Estimating Methods
|
||||
|
||||
Also "single-point estimation" as opposed to the standard three-point.
|
||||
@@ -5,7 +11,7 @@ Also "single-point estimation" as opposed to the standard three-point.
|
||||
"Traditional estimating methods" as referenced frequently in [[this notebook]]
|
||||
are those [[construction-estimating]] methods that produce:
|
||||
|
||||
* an *exhaustive* and *specific* bill of material
|
||||
* an _exhaustive_ and _specific_ bill of material
|
||||
* a single, definitive final price for each bid item
|
||||
|
||||
Such methods lack the ability to intelligently express [[uncertainty]].
|
||||
|
||||