vault backup: 2026-02-25 08:15:32
This commit is contained in:
-114
@@ -10,117 +10,3 @@ tags:
|
||||
dg-publish: true
|
||||
---
|
||||
# 2026-01-06
|
||||
|
||||
# 2026-01-06 07:47:??
|
||||
|
||||
### _Let Them Theory_ Theory
|
||||
|
||||
1. Person habitually engages in toxic behavior
|
||||
which they consciously believe to be benevolent
|
||||
|
||||
2. Person recognizes that when they stop engaging in said toxic behavior,
|
||||
others appreciate it
|
||||
|
||||
3. Person feels that they are doing a service
|
||||
by not engaging in said toxic behavior
|
||||
|
||||
# 2026-01-06 10:00:??
|
||||
|
||||
Paraphrased Teams conversation with a peer
|
||||
about [[distribution-designations#Terminations]].
|
||||
Peer's messages are in block quotes.
|
||||
|
||||
***
|
||||
|
||||
> Good morning!
|
||||
> Do you add branch terminations to panelboards?
|
||||
> If so, how does your 'distribution' section looks?
|
||||
|
||||
Morning! Yes to the first question, ? to the second
|
||||
|
||||
> As all panelboards on a job don't have the same size/# of terminations,
|
||||
> I assume you would have a plethora of same size boards in the job, with different terms.
|
||||
> How do you list them?
|
||||
|
||||
| | Designation | Status | Quantity |
|
||||
| --- | ----------------------------- | ------ | -------- |
|
||||
| 1 | Generator - 350kW, Diesel | | 1 |
|
||||
| 2 | Generator - 2000kW, Diesel | | 1 |
|
||||
| 3 | ATS - 200A | | 2 |
|
||||
| 4 | ATS - 250A | | 1 |
|
||||
| 5 | ATS - 400A | | 2 |
|
||||
| 6 | ATS - 600A | | 2 |
|
||||
| 7 | ATS - 800A | | 1 |
|
||||
| 8 | ATS - 1000A | | 1 |
|
||||
| 9 | Panelboard - 50A, 1-Section | | 1 |
|
||||
| 10 | Panelboard - 100A, 1-Section | | 18 |
|
||||
| 11 | Panelboard - 125A, 1-Section | | 26 |
|
||||
| 12 | Panelboard - 150A, 1-Section | | 2 |
|
||||
| 13 | Panelboard - 225A, 1-Section | | 11 |
|
||||
| 14 | Panelboard - 225A, 2-Section | | 5 |
|
||||
| 15 | Panelboard - 400A, 1-Section | | 2 |
|
||||
| 16 | Panelboard - 400A, 2-Section | | 3 |
|
||||
| 17 | Panelboard - 400A, 3-Section | | 5 |
|
||||
| 18 | Panelboard - 600A, 2-Section | | 1 |
|
||||
| 19 | Panelboard - 800A, 1-Section | | 1 |
|
||||
| 20 | Panelboard - 1200A, 1-Section | | 2 |
|
||||
| 21 | Panelboard - 1200A, 2-Section | | 1 |
|
||||
| 22 | Panelboard - 3000A, 1-Section | | 1 |
|
||||
| 23 | CT Cabinet | | |
|
||||
| 24 | Power Monitor | | 82 |
|
||||
| 25 | SPD/TVSS | | 2 |
|
||||
|
||||
> Ah, so you just chuck in a lot # of terms per board and call it good?
|
||||
|
||||
Essentially.
|
||||
Ben's direction was to pick a schedule
|
||||
on the upper end of terms for each size panel
|
||||
to be representative of the rest.
|
||||
At my old place I would have made a designation for each panel,
|
||||
I'm not upset to leave that behind.
|
||||
I see no reason you couldn't just make each size once
|
||||
and keep it in a temp job.
|
||||
I would, but I usually extract the schedules anyway
|
||||
so I just use the actual average.
|
||||
|
||||
> Thank you for that.
|
||||
> Joel wagged his finger at me about missing terms this morning---
|
||||
> I wanted to see how it's preferred.
|
||||
> I was told terms are captured by feeders/mech connections
|
||||
> and have never added them to panelboards.
|
||||
>
|
||||
> That would be the best way, finding the actual average.
|
||||
|
||||
The mech connection assemblies have the load side term,
|
||||
the feeder assemblies have both sides,
|
||||
the branch assemblies don't have either,
|
||||
that's why he got you, I think.
|
||||
|
||||
I don't think my way is best
|
||||
unless you already have all the circuits in a big table for other reasons.
|
||||
Lot of effort for a marginal increase in certainty above a heuristic like Ben's.
|
||||
|
||||
I'm working on a job Noah started now,
|
||||
he made certain panels separate from what I assume is the average
|
||||
and labeled them with the name of the panel.
|
||||
If I had a job where some were significantly more full than others
|
||||
I _might_ do something similar,
|
||||
but I'd probably name them
|
||||
"... 1-Section, ~25% Fill"/"... 1-Section, ~75% Fill" instead.
|
||||
But that's a lot of mental overhead.
|
||||
|
||||
# 2026-01-06 10:57:??
|
||||
|
||||
Tracking contractor growth by project square footage
|
||||
rather than contract value dollars.
|
||||
Account for market shifts and regional differences.
|
||||
|
||||
Problematic for other than new residential construction.
|
||||
Do you count site area?
|
||||
Out of contract building area for renovations?
|
||||
|
||||
Maybe the sum of in-contract building area and other areas prorated somehow.
|
||||
|
||||
Seems imminently gameable.
|
||||
See [[incentives#Perverse Incentive]]
|
||||
and [[estimating-culture#Incentives]].
|
||||
|
||||
Reference in New Issue
Block a user