dg-publish: true
---
# 2026-01-08
# 2026-01-08 13:33:34
### 2100 Crystal Drive Takeoff Review
#### Generators
> [!failure]
> Generators were erroneously broken down in switchgear.
[[switchgear-takeoff#Generator|Generator]]
#### Switchgear
Switchgear cost comp
"\\EgnyteDrive\Shared\Estimating\11 Bid Estimating Spreadsheets\Switchgear Pricing Tool Version 2 (2.02.2024) (Template) - Copy.xls"
Includes
* submetering
* coordination study
#### Composite Cleanup
1 day per week
$$
\text{Average Weeks Per Month} =
$$
> It occurs to me I don't know all the rules of our calendar
> [Gregorian calendar - Wikipedia](https://en.wikipedia.org/wiki/Gregorian_calendar)
#### Temp Power
$10,000 per [[heavy-equipment#Swing Stage Scaffolding|swing stage]]
[[temp-power-takeoff]]
#### Unit Typicals
I asked Joel about using unit typicals as described in
[[2025-12-19#2025-12-19 10:44]].
He stated that would be acceptable.