vault backup: 2026-01-12 16:34:31

This commit is contained in:
2026-01-12 16:34:31 -05:00
parent f811d9ac91
commit 887b0e2139
9 changed files with 131 additions and 8 deletions
+1 -1
View File
@@ -13,7 +13,7 @@
"globalFilter": "TODO",
"removeGlobalFilter": true,
"taskFormat": "tasksPluginEmoji",
"setCreatedDate": false,
"setCreatedDate": true,
"setDoneDate": true,
"setCancelledDate": true,
"autoSuggestInEditor": true,
+84 -2
View File
@@ -1,7 +1,7 @@
---
id:
aliases: []
title: "2026-01-12"
title: 2026-01-12
tags:
- authorship/original
- destiny/permanent
@@ -28,4 +28,86 @@ Drawings show 2 separate duplex receptacles for dishwasher and disposal
Takeoff used `DW & DISPOSAL DUAL CIR - ...`,
which includes only one receptacle.
According to Joel this takeoff is correct for the scenario.
According to Joel this takeoff is correct for the scenario.
## 2026-01-12 12:23
Travelling with Brian Smarslok and Joel Jansen on [[2026-01-15]]
to visit [[#Woodbury Heights|an awarded project]] in New Jersey.
Flying from TPA to PHL, departure @ 7:00AM.
We'll be meeting with the developer, [Greystar](https://www.greystar.com/).
### Woodbury Heights
```yaml
project-name: GSC Ltd. Woodbury Heights (aka Academy Pointe)
sector: Residential
market-type: Apartment
bldg-type: Garden
construction-method: Wood Frame
construction-type: V
unit-wiring-method: Romex
code-data: NEC2020
mech-system: Split Dx
buildings: 9
floors: 3
units: 234
gross-area: 266,272
area-by-type:
- exterior-amenity: 12,306
- interior-amenity: 5,031
- garage: 3,788
- saleable: 223,172
division: MA 1
geographic-region: Northeast
metro-area: New York-Newark-Jersey City, NY-NJ-PA
municipality-or-ahj: City of Woodbury
power-company: PSE&G
stakeholders:
- developer: Greystar (HQ - Charleston, SC)
architect: LS3P Associates Ltd
electrical-engineer: Hurst Engineering
contract-value: 2,305,000.00
start-date: 2025-05-01
end-date: 2026-08-26
duration: 11 months
```
#### GP Variance
"GP%" is **margin** (see [[markup-vs-margin]]).
The job appears to be doing poorly, at current GP variance of -$299,356.
About $93,000.00 profit on a $2,391,378 job (~3% margin, down from 16.4% as bid).
Intend to ask Joel what was missed if he knows,
and more generally if he has a strategy for figuring out,
between BPM, The Hub, and however many other places we can look.
I doubt very seriously that mismanagement
can be blamed for any significant portion of variance that extreme.
## 2026-01-12 13:02
**Dry utilities:** utilities other than "wet" utilities (water, sewer, stormwater),
namely power, data, and natural gas.
## 2026-01-12 13:02
Joel attributes the [[#GP Variance|apparent variance]] to
1. missed Polaris lugs for feeders for one building,
2. insufficient budget for equipment rental, and
3. upfront costs already paid (construction is 50% complete).
He also said that operations accused ConEst
of providing insufficient length for subfeeds,
which he said was true,
but not to the extent accused
(only ~600ft missed total).
The award WBS shows $32,382 for equipment rental
I'm dubious of all these explanations,
but I don't have another one.
I can't find the ConEst folder or Accubid file.
+2
View File
@@ -44,6 +44,8 @@ $$
### Usable Area (USF)
This may be synonymous with Saleable Area
Usable Area is the tenant's exclusive space.
the area physically occupied and controlled by a specific tenant.
+8 -3
View File
@@ -11,6 +11,11 @@ title: Daily Notes
---
# Daily Notes
I'm experimenting with the idea of using daily notes
as a replacement for most fleeting notes,
and as a commentary heavy changelog.
Daily notes are the place for [[small-tasks]], journal entries,
and any content I must record, but don't have a _good_ place for.
It is permissible to correct typos
to a note started on a previous day.
Adding content to finish a thought
may also be permissible.
I frequently leave sentences unfinished.
+13
View File
@@ -0,0 +1,13 @@
---
id:
aliases: []
title: Personal Knowledge Management
tags:
- authorship/original
- destiny/permanent
- status/not-started
- type/media-commentary
---
# Personal Knowledge Management
PKM requires [[note-taking]],
+11
View File
@@ -12,5 +12,16 @@ tags:
* [ ] TODO: Explain appropriate use of Tasks plugin
At present [[this-notebook]] uses the [Tasks community plugin](https://publish.obsidian.md/tasks/)
for small tasks that don't warrant their own notes.
For those that do, see [[TODO]].
_Task_ (italicized) as used in this note,
refers specifically to the Task community plugin's definition.
_Tasks_ should generally be created only in [[daily-notes]].
If created in the note they reference they will want to be deleted after resolution,
which I feel defeats the purpose of the plugin.
```tasks
```
+3 -1
View File
@@ -23,7 +23,9 @@ Typical of hotels and dormitories.
Route from panel to center of the room.
If voltage drop is to be considered in takeoff,
### Voltage Drop
_If_ voltage drop is to be considered in takeoff,
Use the table provided in the drawings.
If no table is provided, use the following:
+3 -1
View File
@@ -58,6 +58,8 @@ tags:
## Generator
* [ ] TODO: Add Generator breakdowns to script
* `Area` = "01 - Generator"
* `Phase` = "Switch Gear"
* `System` = "Gen - Generator"
1. [[distribution-designations#Generators]]
+6
View File
@@ -13,6 +13,12 @@ title: Wiring Method Selection
Determine where each wiring method can be used.
> [!important]
> This note covers general, system-agnostic selection.
> For certain specific applications,
> It may be necessary to deviate from the general case.
>
## Example Wiring Method Selection
Below is an example Wiring Method Selection