vault backup: 2026-01-12 16:34:31
This commit is contained in:
+1
-1
@@ -13,7 +13,7 @@
|
||||
"globalFilter": "TODO",
|
||||
"removeGlobalFilter": true,
|
||||
"taskFormat": "tasksPluginEmoji",
|
||||
"setCreatedDate": false,
|
||||
"setCreatedDate": true,
|
||||
"setDoneDate": true,
|
||||
"setCancelledDate": true,
|
||||
"autoSuggestInEditor": true,
|
||||
|
||||
+84
-2
@@ -1,7 +1,7 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
title: "2026-01-12"
|
||||
title: 2026-01-12
|
||||
tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
@@ -28,4 +28,86 @@ Drawings show 2 separate duplex receptacles for dishwasher and disposal
|
||||
Takeoff used `DW & DISPOSAL DUAL CIR - ...`,
|
||||
which includes only one receptacle.
|
||||
|
||||
According to Joel this takeoff is correct for the scenario.
|
||||
According to Joel this takeoff is correct for the scenario.
|
||||
|
||||
## 2026-01-12 12:23
|
||||
|
||||
Travelling with Brian Smarslok and Joel Jansen on [[2026-01-15]]
|
||||
to visit [[#Woodbury Heights|an awarded project]] in New Jersey.
|
||||
Flying from TPA to PHL, departure @ 7:00AM.
|
||||
We'll be meeting with the developer, [Greystar](https://www.greystar.com/).
|
||||
|
||||
### Woodbury Heights
|
||||
|
||||
```yaml
|
||||
project-name: GSC Ltd. Woodbury Heights (aka Academy Pointe)
|
||||
sector: Residential
|
||||
market-type: Apartment
|
||||
bldg-type: Garden
|
||||
construction-method: Wood Frame
|
||||
construction-type: V
|
||||
unit-wiring-method: Romex
|
||||
code-data: NEC2020
|
||||
mech-system: Split Dx
|
||||
buildings: 9
|
||||
floors: 3
|
||||
units: 234
|
||||
gross-area: 266,272
|
||||
area-by-type:
|
||||
- exterior-amenity: 12,306
|
||||
- interior-amenity: 5,031
|
||||
- garage: 3,788
|
||||
- saleable: 223,172
|
||||
division: MA 1
|
||||
geographic-region: Northeast
|
||||
metro-area: New York-Newark-Jersey City, NY-NJ-PA
|
||||
municipality-or-ahj: City of Woodbury
|
||||
power-company: PSE&G
|
||||
stakeholders:
|
||||
- developer: Greystar (HQ - Charleston, SC)
|
||||
architect: LS3P Associates Ltd
|
||||
electrical-engineer: Hurst Engineering
|
||||
contract-value: 2,305,000.00
|
||||
start-date: 2025-05-01
|
||||
end-date: 2026-08-26
|
||||
duration: 11 months
|
||||
```
|
||||
|
||||
#### GP Variance
|
||||
|
||||
"GP%" is **margin** (see [[markup-vs-margin]]).
|
||||
|
||||
The job appears to be doing poorly, at current GP variance of -$299,356.
|
||||
|
||||
About $93,000.00 profit on a $2,391,378 job (~3% margin, down from 16.4% as bid).
|
||||
|
||||
Intend to ask Joel what was missed if he knows,
|
||||
and more generally if he has a strategy for figuring out,
|
||||
between BPM, The Hub, and however many other places we can look.
|
||||
|
||||
I doubt very seriously that mismanagement
|
||||
can be blamed for any significant portion of variance that extreme.
|
||||
|
||||
## 2026-01-12 13:02
|
||||
|
||||
**Dry utilities:** utilities other than "wet" utilities (water, sewer, stormwater),
|
||||
namely power, data, and natural gas.
|
||||
|
||||
## 2026-01-12 13:02
|
||||
|
||||
Joel attributes the [[#GP Variance|apparent variance]] to
|
||||
1. missed Polaris lugs for feeders for one building,
|
||||
2. insufficient budget for equipment rental, and
|
||||
3. upfront costs already paid (construction is 50% complete).
|
||||
|
||||
He also said that operations accused ConEst
|
||||
of providing insufficient length for subfeeds,
|
||||
which he said was true,
|
||||
but not to the extent accused
|
||||
(only ~600ft missed total).
|
||||
|
||||
The award WBS shows $32,382 for equipment rental
|
||||
|
||||
I'm dubious of all these explanations,
|
||||
but I don't have another one.
|
||||
I can't find the ConEst folder or Accubid file.
|
||||
|
||||
@@ -44,6 +44,8 @@ $$
|
||||
|
||||
### Usable Area (USF)
|
||||
|
||||
This may be synonymous with Saleable Area
|
||||
|
||||
Usable Area is the tenant's exclusive space.
|
||||
the area physically occupied and controlled by a specific tenant.
|
||||
|
||||
|
||||
+8
-3
@@ -11,6 +11,11 @@ title: Daily Notes
|
||||
---
|
||||
# Daily Notes
|
||||
|
||||
I'm experimenting with the idea of using daily notes
|
||||
as a replacement for most fleeting notes,
|
||||
and as a commentary heavy changelog.
|
||||
Daily notes are the place for [[small-tasks]], journal entries,
|
||||
and any content I must record, but don't have a _good_ place for.
|
||||
|
||||
It is permissible to correct typos
|
||||
to a note started on a previous day.
|
||||
Adding content to finish a thought
|
||||
may also be permissible.
|
||||
I frequently leave sentences unfinished.
|
||||
|
||||
@@ -0,0 +1,13 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
title: Personal Knowledge Management
|
||||
tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- status/not-started
|
||||
- type/media-commentary
|
||||
---
|
||||
# Personal Knowledge Management
|
||||
|
||||
PKM requires [[note-taking]],
|
||||
@@ -12,5 +12,16 @@ tags:
|
||||
|
||||
* [ ] TODO: Explain appropriate use of Tasks plugin
|
||||
|
||||
At present [[this-notebook]] uses the [Tasks community plugin](https://publish.obsidian.md/tasks/)
|
||||
for small tasks that don't warrant their own notes.
|
||||
For those that do, see [[TODO]].
|
||||
|
||||
_Task_ (italicized) as used in this note,
|
||||
refers specifically to the Task community plugin's definition.
|
||||
|
||||
_Tasks_ should generally be created only in [[daily-notes]].
|
||||
If created in the note they reference they will want to be deleted after resolution,
|
||||
which I feel defeats the purpose of the plugin.
|
||||
|
||||
```tasks
|
||||
```
|
||||
|
||||
+3
-1
@@ -23,7 +23,9 @@ Typical of hotels and dormitories.
|
||||
|
||||
Route from panel to center of the room.
|
||||
|
||||
If voltage drop is to be considered in takeoff,
|
||||
### Voltage Drop
|
||||
|
||||
_If_ voltage drop is to be considered in takeoff,
|
||||
Use the table provided in the drawings.
|
||||
If no table is provided, use the following:
|
||||
|
||||
|
||||
@@ -58,6 +58,8 @@ tags:
|
||||
|
||||
## Generator
|
||||
|
||||
* [ ] TODO: Add Generator breakdowns to script
|
||||
* `Area` = "01 - Generator"
|
||||
* `Phase` = "Switch Gear"
|
||||
* `System` = "Gen - Generator"
|
||||
|
||||
1. [[distribution-designations#Generators]]
|
||||
@@ -13,6 +13,12 @@ title: Wiring Method Selection
|
||||
|
||||
Determine where each wiring method can be used.
|
||||
|
||||
> [!important]
|
||||
> This note covers general, system-agnostic selection.
|
||||
> For certain specific applications,
|
||||
> It may be necessary to deviate from the general case.
|
||||
>
|
||||
|
||||
## Example Wiring Method Selection
|
||||
|
||||
Below is an example Wiring Method Selection
|
||||
|
||||
Reference in New Issue
Block a user