vault backup: 2025-08-05 17:00:05

This commit is contained in:
2025-08-05 17:00:05 -04:00
parent b8116221b7
commit 89b1ac60b9
33 changed files with 380 additions and 1381 deletions
File diff suppressed because it is too large Load Diff
+8 -1
View File
@@ -1,6 +1,6 @@
{ {
"collapse-filter": false, "collapse-filter": false,
"search": "", "search": "-tag:#type/media -tag:#type/media-commentary",
"showTags": false, "showTags": false,
"showAttachments": false, "showAttachments": false,
"hideUnresolved": true, "hideUnresolved": true,
@@ -27,6 +27,13 @@
"a": 1, "a": 1,
"rgb": 6443744 "rgb": 6443744
} }
},
{
"query": "tag:#systems",
"color": {
"a": 1,
"rgb": 14701138
}
} }
], ],
"collapse-display": false, "collapse-display": false,
+2 -1
View File
@@ -232,7 +232,8 @@
"README.md", "README.md",
"systems.md", "systems.md",
"electrical.md", "electrical.md",
"lighting-controls.md" "lighting-controls.md",
"full-takeoff.md"
], ],
"allowOntologySuggester": true, "allowOntologySuggester": true,
"ontologySuggesterParentTrigger": "::p", "ontologySuggesterParentTrigger": "::p",
+1
View File
@@ -0,0 +1 @@
{}
+11
View File
@@ -0,0 +1,11 @@
1. RETAIL TENANT ELECTRICAL SERVICE SHALL BE DERIVED FROM TENANT METERS IN THE MAIN ELECTRICAL ROOM.
REFER TO ELECTRICAL DISTRIBUTION DIAGRAM ON SHEET E-401.
ELECTRICAL CAPACITY IS BASED ON THE FOLLOWING PROVISIONS:
1. SIX RETAIL TENANTS ANTICIPATED WITH THE FOLLOWING ELECTRICAL SERVICE.
(2)200A, (3)400A, AND (1)6OOA AT 480V/3PH.
PROVIDE THE FOLLOWING CONDUITS FOR EACH SPACE
WHICH INCLUDES SPARE CONDUIT FOR ADDITIONAL 200A METER FOR FLEXIBILITY.
2. EACH 200A SERVICE SHALL BE PROVIDED WITH (2) 2 1/2” EMPTY CONDUITS FROM MAIN ELECTRICAL ROOM TO RETAIL SPACE.
3. EACH 400A SERVICE SHALL BE PROVIDED WITH (3) 2 1/2” EMPTY CONDUITS FROM MAIN ELECTRICAL ROOM TO RETAIL SPACE.
4. EACH 600A SERVICE SHALL BE PROVIDED WITH (2) 3” AND (1) 2 1/2” EMPTY CONDUITS FROM MAIN ELECTRICAL ROOM TO RETAIL SPACE.
5. GALLERY SERVICE SHALL BE PROVIDED WITH 200A WIRING AND CONDUIT.
+48
View File
@@ -0,0 +1,48 @@
---
id:
aliases:
- area-of-rescue
- two-way-communication
tags:
- occupational
- occupational/systems/standalone-systems
---
# Area of Refuge (AoR)
## Info
> [!info] Also Known As
> * Area of Rescue
> * 2-Way Communication
## Sequence
### 1. Estimate preparation
Complete [[fire-alarm]] preparation and takeoff.
### 2. Takeoff
##### Horizontal
> Area: Same as Fire Command Room
`FIRE ALARM & DAS SYSTEMS`/`TWO WAY COMMUNICATION ASSEMBLIES`/`...`
* Length: Per drawings if shown, otherwise use longer of
* FCR to elevator lobbies
* FCR to stairwells
* Count: Number of boxes run to. Per drawings if shown, otherwise use the greater of:
* Count of elevators
* Count of stairwells
##### Vertical
> Area: "Typical - Building All Levels"
`FIRE ALARM & DAS SYSTEMS`/`TWO WAY COMMUNICATION ASSEMBLIES`/`...`
* Length: 15ft x per count
* Count: match Horizontal
### 3. Extension (Review and Checking)
+2
View File
@@ -8,6 +8,8 @@ tags:
--- ---
# Automating PDF Annotation # Automating PDF Annotation
See [[portable-tools]] for valid dependencies.
## Extract Bluebeam Markups ## Extract Bluebeam Markups
Right now I'm exporting Bluebeam markups to csv before processing, Right now I'm exporting Bluebeam markups to csv before processing,
+18
View File
@@ -0,0 +1,18 @@
---
id:
aliases: []
tags:
- occupational
- occupational/systems
---
# Blank System
## Info
## Sequence
### 1. Estimate preparation
### 2. Takeoff
### 3. Extension (Review and Checking)
+1 -1
View File
@@ -4,7 +4,7 @@ aliases: []
tags: tags:
- type/media-commentary - type/media-commentary
--- ---
# *Construction Estimating Using Excel* # _Construction Estimating Using Excel_
Construction Estimating Using Excel Construction Estimating Using Excel
(Peterson MBA PE, Steven) (Peterson MBA PE, Steven)
+30
View File
@@ -55,3 +55,33 @@ weighted by the organizational desire to win the project.
$$ $$
{E}[P]= {E}[P]=
$$ $$
## Misconceptions
### Standard Practices
In general, many things thought to be standard are quite the opposite.
* Use of square receptacle symbols
### Proposals
Proposals are not legally binding,
which is a double edged sword
for intermediate subcontractors like electrical:
* Proposals to GC's can be withdrawn for any reason
* Proposals from subcontractors can be withdrawn for any reason
This is obviously not popular practice,
however it is important to recognize
that errors aren't set in stone
until a contract is signed.
Destigmatizing proposal retraction is of critical concern for subcontractors.
See [[estimating-culture]] for more on estimate error game theory.
It's important to recognize that retracting a proposal
may upset a few people employed by the GC,
but consider how little your own opinion matters to your company's strategic decisions.
Much bigger people are involved after the proposal is accepted.
+16 -11
View File
@@ -7,30 +7,35 @@ tags:
--- ---
# Design Build Budget # Design Build Budget
## Info
Design build budgets are used when project documentation
is insufficient for [[full-takeoff]].
## Sequence ## Sequence
### 2. Takeoff ### 2. Takeoff
#### Misc Budgets #### Misc Budgets
From [[misc-budgets]], takeoff: * [[misc-budgets#Temporary Power & Lighting]]
* [[misc-budgets#Irrigation Pumps]]
* Temporary Power & Lighting
* Irrigation
#### Feeders #### Feeders
##### Primaries & Secondaries ##### Primaries & Secondaries
See [[feeders]]. * [[feeders#Primaries]]
* [[feeders#Secondaries]]
##### Feeders ##### Feeders
Budget per Unit Count. Compare to Bid Sheet. Budget per Unit Count.
Compare to Bid Sheet.
Alternate method as described by Joel: > [!info] Alternate method as described by Joel
Takeoff unit risers normally > Takeoff unit risers normally
with length * 1.5 to cover house panel feeders. > with Length * 1.5 to cover house panel feeders.
#### Switchgear #### Switchgear
@@ -44,5 +49,5 @@ See [[switchgear#Generator]].
Budget per Unit Count. Compare to Bid Sheet. Budget per Unit Count. Compare to Bid Sheet.
Alternate method as described by Joel: > [!info] Alternate method as described by Joel
Takeoff per [[subfeeds]], use average for length. > Takeoff per [[subfeeds]], use average for length.
+81
View File
@@ -0,0 +1,81 @@
---
id:
aliases:
- das
tags:
- occupational
- occupational/systems/standalone-systems
---
# Distributed Antenna Systems (DAS)
## Info
### Emergency Responder Radio Communication Systems (ERRCS)
### Cellular Systems
Less common than ERRCS are "cellular DAS" systems
## Sequence
### 1. Estimate preparation
Complete [[fire-alarm]] preparation and takeoff.
### 2. Takeoff
#### FACR to Every Elev. Shaft
FACR TO ELEV PIT = 2" PVC40
CA.28.31.5
Match Fire Alarm takeoff Length and Count
#### FACR to Every Staircase
FACR TO STAIRWELL = 2" PVC40
CA.28.31.8
Match Fire Alarm takeoff Length and Count
#### Stairwell Riser Every 2 Floors
STAIRWELL RISER EVERY 2 FLRS = 1 1/2" EMT (20') W/ 16X16X6 BOX
CA.28.31.12
Create a Stairwell typical on every other floor
#### FACR to Electric Room
FACR TO 2HR-RATED RM = 2" PVC40
CA.28.31.14
Match Fire Alarm takeoff Length
#### Electric Room Riser to Every Floor
2HR-RATED RM RISER TO EVERY FLR = 2" EMT (15') W/ 16X16X6 BOX
CA.28.31.18
Takeoff in every Electric Room
#### Top 2H Rated Room To Roof
FACR TO ROOF = 2" EMT W/ RMC WEATHERHEAD & IMC STUB
CA.28.31.18
Use 15' or Height of ceiling on last building level
#### Horizontal
CORRIDORS EMT OH = 1 1/2" EMT W/ 16X16X6 BOX EVERY 80'
CA.28.31.23
CORRIDORS DECK = 1 1/2" PVC40, STUBBY, FLEX W/ 16X16X6 BOX EVERY 80'
CA.28.31.21
1-1/2 through corridors w/ 16x16x6 J-Box
Length for every corridor/garage
### 3. Extension (Review and Checking)
+2 -1
View File
@@ -2,7 +2,8 @@
id: electrical id: electrical
aliases: [] aliases: []
tags: tags:
- systems/electrical - occupational
- occupational/systems/electrical
--- ---
# Electrical # Electrical
+4 -1
View File
@@ -1,7 +1,10 @@
--- ---
id:
aliases: []
tags: tags:
- estimating - estimating
- software - software
- type/idea
--- ---
# Estimating Ergonomics # Estimating Ergonomics
@@ -119,7 +122,7 @@ that Trimble or anybody else has.
Something that I've realized that really bothers me Something that I've realized that really bothers me
about the the traditional methods about the the traditional methods
(e.g. database-based takeoff, audit-trail-type-abstraction) (e.g. database-based takeoff, audit-trail-type-abstraction)
is the the *enforced linearity*, is the the _enforced linearity_,
which is at odds with the reality of takeoff. which is at odds with the reality of takeoff.
No matter how you slice it, No matter how you slice it,
-33
View File
@@ -1,33 +0,0 @@
---
tags:
- estimating
---
# Estimating Misconceptions
## Standard Practices
In general, many things thought to be standard are quite the opposite.
* Use of square receptacle symbols
## Proposals
Proposals are not legally binding,
which is a double edged sword
for intermediate subcontractors like electrical:
* Proposals to GC's can be withdrawn for any reason
* Proposals from subcontractors can be withdrawn for any reason
This is obviously not popular practice,
however it is important to recognize
that errors aren't set in stone
until a contract is signed.
Destigmatizing proposal retraction is of critical concern for subcontractors.
See [[estimating-culture]] for more on estimate error game theory.
It's important to recognize that retracting a proposal
may upset a few people employed by the GC,
but consider how little your own opinion matters to your company's strategic decisions.
Much bigger people are involved after the proposal is accepted.
+5 -1
View File
@@ -6,7 +6,9 @@ tags:
- occupational - occupational
- type/idea - type/idea
--- ---
# Feeder Verification Automation # Feeder Verification
## Sequence
> * Filter by Feeders system in Takeoff > * Filter by Feeders system in Takeoff
> * Highlight everything and copy into excel > * Highlight everything and copy into excel
@@ -15,6 +17,8 @@ tags:
> * Redo the same process but with USF, Primaries, and Secondaries > * Redo the same process but with USF, Primaries, and Secondaries
> * Save as and rename to NAME - Feeder Verification in the PSN folder > * Save as and rename to NAME - Feeder Verification in the PSN folder
## Automation
Breakdown selection is straightforward. Breakdown selection is straightforward.
To select all takeoffs: To select all takeoffs:
+34 -1
View File
@@ -2,7 +2,8 @@
id: feeders id: feeders
aliases: [] aliases: []
tags: tags:
- systems/feeders - occupational
- occupational/systems/feeders
--- ---
# Feeders # Feeders
@@ -84,4 +85,36 @@ Provide sleeves for all feeder conduits passing through floors.
* M = Metal => Wood Frame * M = Metal => Wood Frame
* Round 1" to 2" * Round 1" to 2"
#### Grounding
This is intended to cover electrical and telecom grounding.
##### System Grounding
> Area: "01 - Feeders/Risers Building"
`COMMON ASSEMBLIES`/`GROUNDING`/`GND = #3/0 & 1" CONDUIT - EMT`
* Length: Measure around the main electrical rooms to stacked
* Count: Total number of electrical rooms
`COMMON ASSEMBLIES`/`GROUNDING`/`(3) ... x 10' CU CLAD GRD ROD & 4"X12" GND BAR`
* Count: 1
##### Riser
> Area: "Typical - Building All Electrical Riser Rooms"
`COMMON ASSEMBLIES`/`GROUNDING`/`GND = #3/0 & 1" CONDUIT - EMT`
* Length: 15
* Count: 1
##### Telecom Ground Bridge
Use only where shown.
`COMMON ASSEMBLIES`/`GROUNDING`/`TELE/DATA GND BRIDGE, ..., W/ COVER & (60') #6 THHN GREEN`
### 3. Extension (Review and Checking) ### 3. Extension (Review and Checking)
+3 -78
View File
@@ -2,7 +2,8 @@
id: id:
aliases: [] aliases: []
tags: tags:
- systems/fire-alarm - occupational
- occupational/systems/fire-alarm
--- ---
# Fire Alarm # Fire Alarm
@@ -75,7 +76,7 @@ FACR TO STAIRWELLS 1" PVC (CA.30.22.17)
##### Terminal Cabinets ##### Terminal Cabinets
TERMINAL CABINETS (2) 2" EMT/PVC (CA.30.26. __) TERMINAL CABINETS (2) 2" EMT/PVC (CA.30.26.X)
Horizontal: Horizontal:
* Measure from the Fire Command room to all electrical rooms * Measure from the Fire Command room to all electrical rooms
@@ -143,82 +144,6 @@ _Design Build:_
Take off both FA and Electrical Take off both FA and Electrical
* Misc Assemblies * Misc Assemblies
#### Area of Refuge (AoR) / Two-Way
PROPOSAL "STAND ALONE SYSTEMS"
CA.31.27. 4/7
##### Horizontal
Take off once
* Length:
* If shown on Plans (FA/Systems/ etc.)
* based on FCR to Elevator Lobbies & FCR to Stairwells* (Whichever is longer)
* Count: Number of boxes run to. If not shown, use the largest count between Elev. & Strwlls.
##### Vertical
Typical on all floors
* Length: 15ft x per count
* Count: match Horizontal
#### Responder Radio / DAS
##### FACR to Every Elev. Shaft
FACR TO ELEV PIT = 2" PVC40
CA.28.31.5
Match Fire Alarm takeoff Length and Count
##### FACR to Every Staircase
FACR TO STAIRWELL = 2" PVC40
CA.28.31.8
Match Fire Alarm takeoff Length and Count
##### Stairwell Riser Every 2 Floors
STAIRWELL RISER EVERY 2 FLRS = 1 1/2" EMT (20') W/ 16X16X6 BOX
CA.28.31.12
Create a Stairwell typical on every other floor
##### FACR to Electric Room
FACR TO 2HR-RATED RM = 2" PVC40
CA.28.31.14
Match Fire Alarm takeoff Length
##### Electric Room Riser to Every Floor
2HR-RATED RM RISER TO EVERY FLR = 2" EMT (15') W/ 16X16X6 BOX
CA.28.31.18
Takeoff in every Electric Room
##### Top 2H Rated Room To Roof
FACR TO ROOF = 2" EMT W/ RMC WEATHERHEAD & IMC STUB
CA.28.31.18
Use 15' or Height of ceiling on last building level
##### Horizontal
CORRIDORS EMT OH = 1 1/2" EMT W/ 16X16X6 BOX EVERY 80'
CA.28.31.23
CORRIDORS DECK = 1 1/2" PVC40, STUBBY, FLEX W/ 16X16X6 BOX EVERY 80'
CA.28.31.21
1-1/2 through corridors w/ 16x16x6 J-Box
Length for every corridor/garage
### 3. Extension (Review and Checking) ### 3. Extension (Review and Checking)
* Sleeving * Sleeving
+2 -1
View File
@@ -2,7 +2,8 @@
id: id:
aliases: [] aliases: []
tags: tags:
- systems/fixtures - occupational
- occupational/systems/fixtures
--- ---
# Fixture Designations # Fixture Designations
+2 -1
View File
@@ -2,7 +2,8 @@
id: id:
aliases: [] aliases: []
tags: tags:
- systems/fixtures - occupational
- occupational/systems/fixtures
--- ---
# Fixtures # Fixtures
+4 -2
View File
@@ -7,11 +7,13 @@ tags:
--- ---
# Full Takeoff # Full Takeoff
## Info
## Sequence ## Sequence
### 1. Estimate preparation ### 1. Estimate preparation
[[project-setup]] Complete [[project-setup]].
### 2. Takeoff ### 2. Takeoff
@@ -29,7 +31,7 @@ tags:
7. [[telecom]] 7. [[telecom]]
8. [[low-voltage]] 8. [[low-voltage]]
9. [[fire-alarm]] 9. [[fire-alarm]]
10. [[lightning-protection]] 10. [[standalone-systems]]
11. [[misc-budgets]] 11. [[misc-budgets]]
### 3. Extension (Review and Checking) ### 3. Extension (Review and Checking)
+4 -1
View File
@@ -2,13 +2,16 @@
id: id:
aliases: [] aliases: []
tags: tags:
- systems/electrical - occupational
- occupational/systems/electrical
parent: [[electrical]] parent: [[electrical]]
--- ---
# Lighting Controls # Lighting Controls
## Information ## Information
### Methods
> [!info] Lighting Control Technologies > [!info] Lighting Control Technologies
> * Triac (Line voltage dim) > * Triac (Line voltage dim)
> * Analog (0-10V dim) > * Analog (0-10V dim)
+2 -1
View File
@@ -2,7 +2,8 @@
id: id:
aliases: [] aliases: []
tags: tags:
- systems/lightning-protection - occupational
- occupational/systems/lightning-protection
--- ---
# Lightning Protection # Lightning Protection
+2 -1
View File
@@ -2,7 +2,8 @@
id: id:
aliases: [] aliases: []
tags: tags:
- systems/low-voltage - occupational
- occupational/systems/low-voltage
--- ---
# Low Voltage # Low Voltage
+3 -2
View File
@@ -2,7 +2,8 @@
id: id:
aliases: [] aliases: []
tags: tags:
- systems - occupational
- occupational/systems
--- ---
# Misc Budgets # Misc Budgets
@@ -62,7 +63,7 @@ BidItem = "3 - Building"
* Takeoff: `ITEM DATABASE`/`TEMPORARY POWER`/`* - TEMPORARY LIGHTING / PWR PNL (PER BLDG AREA SFT)` * Takeoff: `ITEM DATABASE`/`TEMPORARY POWER`/`* - TEMPORARY LIGHTING / PWR PNL (PER BLDG AREA SFT)`
* _Count_ = Garage SF * _Count_ = Garage SF
## Irrigation pumps ## Irrigation Pumps
``` ```
Area = "2 - Site" Area = "2 - Site"
+9 -1
View File
@@ -15,6 +15,8 @@ as well as allow ~~common high-level actions on them.~~
> [!note] > [!note]
> Cmdlets should be written to accept multiple input files where appropriate. > Cmdlets should be written to accept multiple input files where appropriate.
See [[portable-tools]] for valid dependencies.
## `Convert-Document` ## `Convert-Document`
* pandoc * pandoc
@@ -72,4 +74,10 @@ function Import-XML {
`*.SupplierLink.xml` `*.SupplierLink.xml`
## `Unblock-Excel` ## `Unblock-Document`
Excel sheet protection
## `Where-Document`
Filter by metadata. etc.
+4
View File
@@ -73,3 +73,7 @@ will inevitably _treat them as descriptive_.
| ------------------- | ------------- | | ------------------- | ------------- |
| Hi-Hat | Daisy-Chain | | Hi-Hat | Daisy-Chain |
| Furnished By Others | Rough-In Only | | Furnished By Others | Rough-In Only |
## Going Further
[[functional-labor-factoring]]
+22
View File
@@ -0,0 +1,22 @@
---
id:
aliases: []
tags:
- occupational
- occupational/systems/standalone-systems
---
# Standalone Systems
## Info
## Sequence
### 1. Estimate preparation
### 2. Takeoff
1. [[distributed-antenna-systems]]
2. [[area-of-refuge]]
3. [[lightning-protection]]
### 3. Extension (Review and Checking)
+2 -1
View File
@@ -2,7 +2,8 @@
id: id:
aliases: [] aliases: []
tags: tags:
- systems/subfeeds - occupational
- occupational/systems/subfeeds
--- ---
# Subfeeds # Subfeeds
+5 -4
View File
@@ -2,7 +2,8 @@
id: id:
aliases: [] aliases: []
tags: tags:
- systems/switchgear - occupational
- occupational/systems/switchgear
--- ---
# Switchgear # Switchgear
@@ -72,9 +73,9 @@ Use a Distribution Panel of equal amps.
Use 1200A MTS/ATS, and add: Use 1200A MTS/ATS, and add:
- ==CA.33.14.AMPS== * ==CA.33.14.AMPS==
- Factor 1 = 3 * Factor 1 = 3
- ==Delete 1200A== * ==Delete 1200A==
#### Meter Centers #### Meter Centers
+4 -2
View File
@@ -1,12 +1,14 @@
--- ---
id: id:
aliases: aliases:
- '#systems' - '#occupational/systems'
tags: tags:
- systems - occupational/systems
--- ---
# Systems # Systems
[[blank-system]]
* [[electrical]] * [[electrical]]
* [[feeders]] * [[feeders]]
* [[fire-alarm]] * [[fire-alarm]]
+2 -1
View File
@@ -2,7 +2,8 @@
id: id:
aliases: [] aliases: []
tags: tags:
- systems/telecom - occupational
- occupational/systems/telecom
--- ---
# Telecom # Telecom
+42 -35
View File
@@ -2,7 +2,8 @@
id: id:
aliases: [] aliases: []
tags: tags:
- systems/units - occupational
- occupational/systems/units
--- ---
# Unit Takeoff # Unit Takeoff
@@ -43,44 +44,15 @@ tags:
* bus amps * bus amps
2. Read about the project specifications and construction type 2. Read about the project specifications and construction type
* wood or metal studs * partition framing (wood or metal studs)
* wiring methods * stud depth
* NM or MC * wiring methods (NM or MC)
* wiring device plates * wiring device plates (decora or standard)
* Decora or Standard * wiring device specs (are 15A devices allowed or minimum N5-20R)
* wiring device specs
* are 15A devices allowed?
* equipment (20A Kitchen and bath) * equipment (20A Kitchen and bath)
1. Fill out OneNote 1. Fill out OneNote
#### Load Centers
| Rating | Assembly |
| ------- | ---------------------------------------------------------------------------------- |
| <= 100A | `DIST PANELS & UNIT LOAD CENTERS`/`UNIT LOAD CENTERS - ...`/`... UNIT LOAD CENTER` |
| > 100A | `DIST PANELS & UNIT LOAD CENTERS`/`UNIT LOAD CENTERS - ...`/`... BREAKER PNL` |
#### Shade Control
#### "High-Lows"
`COMMON ASSEMBLIES`/`TELECOM SYSTEMS`/`UNIT DATA - TELECOM`/`HIGH-LOW - TV SCOOP 1 1/2" ENT - NO CABLE`
#### Air Sealing
* LEED Silver
* Draft Proof Box
* Mid-Atlantic jobs
`ITEM DATABASE`/`BOSES & CABINETS`/`BOXES - VAPOR`
`COMMON ASSEMBLIES`/`UNITS - MC CABLE ASSEMBLIES`/`GENERAL ASSEMBLIES - METAL STUD`/`UNIT MISC ITEMS - MC - ADJUST ACCORDINGLY`
#### Islands
`COMMON ASSEMBLIES`/`UNITS - MC CABLE ASSEMBLIES`/`1x 15A 125V TR DUP DECORA (METAL STUD) - 20' 3/4" PVC, ENT, 3#12 THHN`
### 2. Takeoff ### 2. Takeoff
> [!tip] Preparing for Unit Takeoff > [!tip] Preparing for Unit Takeoff
@@ -100,6 +72,41 @@ tags:
> and creating them new for each unit, > and creating them new for each unit,
> since the types required can vary greatly between units. > since the types required can vary greatly between units.
#### Load Centers
| Rating | Assembly |
| ------- | ---------------------------------------------------------------------------------- |
| <= 100A | `DIST PANELS & UNIT LOAD CENTERS`/`UNIT LOAD CENTERS - ...`/`... UNIT LOAD CENTER` |
| > 100A | `DIST PANELS & UNIT LOAD CENTERS`/`UNIT LOAD CENTERS - ...`/`... BREAKER PNL` |
#### Shade Control
#### "High-Lows"
`COMMON ASSEMBLIES`/`TELECOM SYSTEMS`/`UNIT DATA - TELECOM`/`HIGH-LOW - TV SCOOP 1 1/2" ENT - NO CABLE`
#### Air Sealing
* LEED Silver
* Mid-Atlantic jobs
* "Draft Proof Box"
`ITEM DATABASE`/`BOXES & CABINETS`/`BOXES - VAPOR`/`...`
`COMMON ASSEMBLIES`/`UNITS - MC CABLE ASSEMBLIES`/`GENERAL ASSEMBLIES - METAL STUD`/`UNIT MISC ITEMS - MC - ADJUST ACCORDINGLY`
#### Islands
`COMMON ASSEMBLIES`/`UNITS - MC CABLE ASSEMBLIES`/`1x 15A 125V TR DUP DECORA (METAL STUD) - 20' 3/4" PVC, ENT, 3#12 THHN`
#### Bidet Toilets, Whirlpool Baths, etc.
`COMMON ASSEMBLIES`/`MECHANICAL CONNECTIONS (UP TO 100A)`/`PVC - LT NM FLEX (CARFLEX)`/`20A 1PH MECH CONN (100') 3/4" PVC 3#12 - CARFLEX`
#### Telecom Homeruns
Included in MSDE.
### 3. Extension (Review and Checking) ### 3. Extension (Review and Checking)
1. Scroll through with Area selected and make sure there is takeoff for each unit type 1. Scroll through with Area selected and make sure there is takeoff for each unit type