vault backup: 2025-07-25 15:43:44
This commit is contained in:
@@ -8,12 +8,7 @@ tags:
|
||||
|
||||
## Info
|
||||
|
||||
"Units" includes [hotel](#hotel) and [residential](#residential) spaces.
|
||||
|
||||
> [!tip] Preparing for Unit Takeoff
|
||||
> Units generally have very little variation.
|
||||
> It is usually best to copy-paste takeoffs
|
||||
> rather than re-build them for each unit.
|
||||
"Units" includes [[#hotel]] and [[#residential]] spaces.
|
||||
|
||||
> [!info] Americans with Disabilities Act (ADA) Terms
|
||||
> * hearing impaired (HI or H.I.)
|
||||
@@ -28,14 +23,17 @@ tags:
|
||||
> * Keys
|
||||
|
||||
> [!trivia]
|
||||
> The origin of the term "key" as a synonym of "hotel room"
|
||||
> ...
|
||||
> %% TODO: %%
|
||||
> The term "key" as a synonym of "hotel room" is a synecdoche,
|
||||
> referring to the unit's door key.
|
||||
> In the pre-digital days of hotel management,
|
||||
> one could count the rooms of a hotel
|
||||
> by the keys behind the front desk.
|
||||
|
||||
### Residential
|
||||
|
||||
> [!info] Also Known As
|
||||
> * Condos
|
||||
> * Apartments
|
||||
|
||||
## Sequence
|
||||
|
||||
@@ -46,7 +44,7 @@ tags:
|
||||
|
||||
2. Read about the project specifications and construction type
|
||||
* Wood or Metal studs
|
||||
* Wiring Method
|
||||
* wiring methods
|
||||
* NM or MC
|
||||
* Wiring device plates
|
||||
* Decora or Standard
|
||||
@@ -58,6 +56,11 @@ tags:
|
||||
|
||||
### 2. Takeoff
|
||||
|
||||
> [!tip] Preparing for Unit Takeoff
|
||||
> Units generally have very little variation.
|
||||
> It is usually best to copy-paste takeoffs
|
||||
> rather than re-build them for each unit.
|
||||
|
||||
1. Kitchen and Bath
|
||||
2. General assemblies
|
||||
3. Low Voltage
|
||||
|
||||
Reference in New Issue
Block a user