id:
|
||||
aliases: []
|
||||
title: Pre-Takeoff Research
|
||||
tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- occupational
|
||||
- status/incomplete
|
||||
- type/guide
|
||||
- authorship/original
|
||||
title: Pre-Takeoff Research
|
||||
---
|
||||
# Pre-Takeoff Research
|
||||
|
||||
@@ -36,12 +36,12 @@ is subject to some debate.
|
||||
> which they must be able to articulate.
|
||||
|
||||
%%
|
||||
The limitations of Bid's authority are currently being questioned
|
||||
The limitations of Bid's authority are currently being questioned,
|
||||
%%
|
||||
|
||||
Seek to use the cheapest method,
|
||||
as determined by Senior Construction Estimator
|
||||
and Database Administrator,
|
||||
Seek to use the cheapest method
|
||||
(as determined by Senior Construction Estimator
|
||||
and Database Administrator),
|
||||
as allowed for the situation.
|
||||
|
||||
* [[wiring-method-selection]]
|
||||
@@ -51,54 +51,76 @@ as allowed for the situation.
|
||||
|
||||
## General
|
||||
|
||||
1. Read about the project specifications and construction type
|
||||
2. Locate Equipment Schedules
|
||||
Read about the project specifications and construction type:
|
||||
* Delivery Method: (Plans & Specs, Design Build, Design Assist, Preliminary Budget)
|
||||
* Deck thickness
|
||||
* Wiring methods
|
||||
* Conductor material
|
||||
|
||||
Locate:
|
||||
* Main Electrical rooms and panel locations
|
||||
|
||||
## By System
|
||||
|
||||
### Feeders
|
||||
|
||||
Read about the project specifications and construction type:
|
||||
* Deck thickness
|
||||
* Wiring methods
|
||||
* Conductor material
|
||||
* Wire terminations (set-screw acceptable or compression required?)
|
||||
* Wire terminations (mechanical acceptable or compression required?)
|
||||
|
||||
Locate:
|
||||
* Riser Diagram
|
||||
* Feeder Schedule (if present)
|
||||
* Main Electrical rooms and panel locations
|
||||
|
||||
1. Locate Unit panels and relevant keynotes
|
||||
* bus amps
|
||||
### Subfeeds
|
||||
|
||||
1. Read about the project specifications and construction type
|
||||
* Corridor Ceiling type
|
||||
|
||||
2. In the drawings, locate:
|
||||
* Unit Panel Schedules
|
||||
* bus amps
|
||||
* Unit Load Calculations
|
||||
* Subfeed schedule (if present)
|
||||
|
||||
### Units
|
||||
|
||||
2. Read about the project specifications and construction type
|
||||
* partition framing (wood or metal studs)
|
||||
* stud depth
|
||||
* wiring methods (NM or MC)
|
||||
* wiring device plates (decora or standard)
|
||||
* wiring device specs (are 15A devices allowed or minimum N5-20R)
|
||||
* equipment (20A Kitchen and bath)
|
||||
* partition framing
|
||||
* stud material (wood or metal)
|
||||
* stud depth
|
||||
* wiring methods (NM or MC)
|
||||
* wiring device plates (decora or standard)
|
||||
* wiring device specs (are 15A devices allowed or minimum N5-20R)
|
||||
* equipment (20A Kitchen and bath)
|
||||
|
||||
### Electrical
|
||||
|
||||
1. Locate Equipment Schedules
|
||||
|
||||
### Low Voltage
|
||||
|
||||
Low Voltage
|
||||
1. Locate Proposal/Scope of Work. Determine ownership and takeoff responsibility:
|
||||
* Cabling
|
||||
* Conduit & Pathways
|
||||
* Sleeving
|
||||
|
||||
2. In the drawings, locate:
|
||||
* Floor plans where LV scope is shown
|
||||
* LV Details
|
||||
|
||||
Telecom
|
||||
### Telecom
|
||||
|
||||
1. Locate MDF (aka MTR, MPOE) and IDF Rooms
|
||||
2. Service entrance conduit "Site Low Voltage Ductbank (SLVDB)"
|
||||
3. Riser throughout building
|
||||
4. Sleeving for riser
|
||||
|
||||
5. Locate Proposal/Scope of Work. Determine ownership and takeoff responsibility:
|
||||
2. Locate Proposal/Scope of Work. Determine ownership and takeoff responsibility:
|
||||
* Cabling
|
||||
* Conduit & Pathways
|
||||
* Sleeving
|
||||
6. Locate which plans the LV is taken off on
|
||||
7. Locate LV Details
|
||||
8. Read about the project specifications and construction type
|
||||
3. Locate which plans the LV is taken off on
|
||||
4. Locate LV Details
|
||||
5. Read about the project specifications and construction type
|
||||
|
||||
## Voltage Drop
|
||||
|
||||
@@ -106,21 +128,9 @@ Unless explicitly stated in the plans or specs,
|
||||
conductors are to be sized according to the relevant schedule,
|
||||
_without respect for voltage drop_.
|
||||
|
||||
### Subfeeds
|
||||
|
||||
1. Read about the project specifications and construction type
|
||||
* Delivery Method: (Plans & Specs, Design Build, Design Assist, Preliminary Budget)
|
||||
* Corridor Ceiling type
|
||||
|
||||
2. In the drawings, locate:
|
||||
* Unit Panel Schedules
|
||||
* Unit Load Calculations
|
||||
* Riser Diagram
|
||||
* Subfeed schedule (if present)
|
||||
|
||||
%%
|
||||
TODO: Create flow chart for wiring methods.
|
||||
Some cases to mention:
|
||||
* Deck thickness (minimum 3x conduit outer diameter)
|
||||
* Renovations (may not be able to run in slab)
|
||||
* Renovations (can't route in existing slabs)
|
||||
%%
|
||||
|
||||