vault backup: 2026-03-03 17:10:26

This commit is contained in:
2026-03-03 17:10:26 -05:00
parent a62b1a701a
commit 9aef6786fc
5 changed files with 57 additions and 17 deletions
+10 -10
View File
@@ -15,6 +15,15 @@ dg-publish: true
Construction estimating is a subset of cost estimation. Construction estimating is a subset of cost estimation.
%%
## TALK
This note should be wide and shallow,
specific sub topics should be extracted and linked.
%%
## Scope ## Scope
This note is intended for: _facts_ This note is intended for: _facts_
@@ -82,13 +91,4 @@ Much bigger people are involved after the proposal is accepted.
* [[electrical-estimators-manual]] * [[electrical-estimators-manual]]
* [[electrical-estimating-methods]] * [[electrical-estimating-methods]]
* [[construction-estimating-using-excel]] * [[construction-estimating-using-excel]]
* [[mike-holts-illustrated-guide-to-electrical-estimating]] * [[holt_2023_estimating]]
%%
## TALK
This note should be wide and shallow,
specific sub topics should be extracted and linked.
%%
+2
View File
@@ -55,6 +55,8 @@ even where serving Amenity spaces.
Clubline Raceway, also called CRG Raceway, Clubline Raceway, also called CRG Raceway,
is a glorified cable management trough. is a glorified cable management trough.
It is not a [[nfpa-70_376_metal-wireways|wireway]],
so conductors must be run in a [[nfpa-70_national-electric-code#Chapter 3 Wiring Methods and Materials|Chapter 3]] wiring method.
Count receptacles normally, Count receptacles normally,
using ==surface-mount EMT assemblies==. using ==surface-mount EMT assemblies==.
+19 -6
View File
@@ -1,20 +1,34 @@
--- ---
id: id:
aliases: [] aliases: []
title: Estimate Laboring
tags: tags:
- authorship/original
- destiny/permanent - destiny/permanent
- status/incomplete - status/incomplete
- topic/automation - topic/automation
- topic/estimating - topic/estimating
- topic/software - topic/software
- type/idea - type/encyclopedia-entry
- authorship/original
title: Labor Factoring
dg-publish: true dg-publish: true
--- ---
# Labor Factoring # Estimate Laboring
In construction estimating,
**laboring** is the process of calculating the labor hours required
to install takeoff material.
## Labor Factoring
**Labor factoring** is the adjustment of base labor hours
to account for adverse or beneficial working conditions.
Labor factors are most often used to increase labor,
but decrease is also possible,
especially efficiency gains due to repetitive work.
%% %%
## TODO ## TODO
Discuss purpose and practice of labor factoring, Discuss purpose and practice of labor factoring,
@@ -81,7 +95,6 @@ can be converted to functions using regressions.
## Going Further ## Going Further
Base labor units suggest a highly functional nature, Base labor units suggest a highly functional nature,
most sensitive to weight. most sensitive to _weight_.
Greater understanding of this relationship would make practical Greater understanding of this relationship would make practical
the prediction of labor of unstudied items. the prediction of labor of unstudied items.
+3 -1
View File
@@ -12,9 +12,11 @@ tags:
A lucky fool is someone who stumbled into success A lucky fool is someone who stumbled into success
in a field where competence is normally prerequisite. in a field where competence is normally prerequisite.
%% %%
Books concerned with lucky fools: Books concerned with lucky fools:
[[hubbard_2020_failure]]
[[taleb_2001_fooled-by-randomness]] [[taleb_2001_fooled-by-randomness]]
[[kahneman_2011_thinking]] [[kahneman_2011_thinking]]
[[hubbard_2020_failure]]
%% %%
+23
View File
@@ -0,0 +1,23 @@
---
id: 2026-03-03T16:01:26-05:00
aliases: []
title: 2026-03-03 16:01:26
tags:
- authorship/original
- destiny/permanent
- status/draft
- type/timestamped
- occupational/takeoff
dg-publish: true
date-created: 2026-03-03T16:01:26-05:00
daily: "[[2026-03-03]]"
weekly: "[[2026-W10]]"
monthly: "[[2026-03]]"
quarterly: "[[2026-Q1]]"
yearly: "[[2026]]"
---
# 2026-03-03 16:01:26
## Stairwell Wiring Method Selection
[[wiring-method-selection]]