title: Pre-Takeoff Research
|
||||
---
|
||||
# Pre-Takeoff Research
|
||||
|
||||
## Requirement Precedence
|
||||
<!--
|
||||
This note should be arranged chronologically:
|
||||
-->
|
||||
|
||||
In case of conflict:
|
||||
|
||||
Requirements of the plans and specs
|
||||
are superseded by the terms of our proposal,
|
||||
which are superseded by specific direction from the bid team.
|
||||
> [!important] Requirement Precedence
|
||||
> In case of conflict:
|
||||
> Requirements of the plans and specs
|
||||
> are superseded by the terms of our proposal,
|
||||
> which are superseded by specific direction from the bid team.
|
||||
|
||||
<!--
|
||||
Where NEC, IBC, and other applicable codes fall in this hierarchy
|
||||
is subject to some debate.
|
||||
-->
|
||||
|
||||
## Wiring Method Selection
|
||||
Seek to use the cheapest method,
|
||||
as determined by Senior Construction Estimator
|
||||
and Database Administrator,
|
||||
as allowed for the situation.
|
||||
|
||||
See [[wiring-method-selection]].
|
||||
* [[wiring-method-selection]]
|
||||
* [[wiring-device-research]]
|
||||
|
||||
## Voltage Drop
|
||||
|
||||
@@ -33,46 +40,26 @@ Unless explicitly stated in the plans or specs,
|
||||
conductors are to be sized according to the relevant schedule,
|
||||
_without respect for voltage drop_.
|
||||
|
||||
### Feeders and Unit Subfeeds
|
||||
### Subfeeds
|
||||
|
||||
<!-- TODO: -->
|
||||
1. Read about the project specifications and construction type
|
||||
* Delivery Method: (Plans & Specs, Design Build, Design Assist, Preliminary Budget)
|
||||
* Corridor Ceiling type
|
||||
|
||||
### Branch Circuits
|
||||
2. In the drawings, locate:
|
||||
* Unit Panel Schedules
|
||||
* Unit Load Calculations
|
||||
* Riser Diagram
|
||||
* Subfeed schedule (if present)
|
||||
|
||||
If voltage drop is to be considered in takeoff,
|
||||
Use the table provided in the drawings.
|
||||
If no table is provided, use the following:
|
||||
<!--
|
||||
TODO: Create flow chart for wiring methods.
|
||||
Some cases to mention:
|
||||
* Deck thickness (minimum 3x conduit outer diameter)
|
||||
* Renovations (may not be able to run in slab)
|
||||
-->
|
||||
|
||||
| Wire Size | Max Length |
|
||||
| ---------:| ----------:|
|
||||
| #12 | 100ft |
|
||||
| #10 | 200ft |
|
||||
| #8 | >200ft |
|
||||
|
||||
## Wiring Device Selection
|
||||
|
||||
Wiring devices and their wall plates are a common target of [[gold-plating]].
|
||||
|
||||
* Device grade: commercial < specification
|
||||
* Minimum rating for general-use receptacles: N5-15R < N5-20R
|
||||
* Device form-factor: Duplex/toggle < Decora
|
||||
* Device cover plate material: Plastic < nylon < aluminum < stainless steel
|
||||
* Device cover plate size: standard < mid-size < oversize "jumbo"
|
||||
* Device cover plate attachment: Standard < screwless
|
||||
* Floor box material: Steel < cast iron
|
||||
* Floor box cover plate material: plastic < brass < aluminum
|
||||
|
||||
> [!info] Search Terms Relevant to Wiring Device Selection
|
||||
> * "Decora"
|
||||
|
||||
> [!info] Example Specs Relevant to Wiring Device Selection[^1]
|
||||
> * 26XXXX - Wiring Devices
|
||||
> * 26XXXX - Boxes And Covers For Electrical Systems
|
||||
> * 26XXXX - Lighting Control Devices
|
||||
> * 26XXXX - Network Lighting Controls
|
||||
|
||||
[^1]: Specification section titles and scope may vary greatly between projects.
|
||||
The examples provided are not an exhaustive list.
|
||||
|
||||
## Emergency Systems
|
||||
|
||||
|
||||