Seek to use the cheapest method,
|
||||
as determined by Senior Construction Estimator
|
||||
and Database Administrator,
|
||||
as allowed for the situation.
|
||||
Determine where each wiring method can be used.
|
||||
|
||||
![[pre-takeoff-research#Requirement Precedence]]
|
||||
NM/SER < PVC < MC < EMT-SS < EMT-Comp < IMC
|
||||
|
||||
Below is an example Wiring Method Selection
|
||||
for a [[ibc-construction-types#5-Over-1 Construction|podium]] construction.
|
||||
|
||||
> [!example]
|
||||
> Wire Material:
|
||||
> * Less than 100A: CU
|
||||
> * 100A and larger: AL
|
||||
>
|
||||
> Outdoors:
|
||||
> * Above-ground: EMT-Comp
|
||||
> * Underground: PVC w/ Rigid Elbows
|
||||
>
|
||||
> Levels 1-2 (Type IA):
|
||||
> * Concealed: MC
|
||||
> * Exposed to Structure:
|
||||
> * Up to 2"C: PVC In-Slab
|
||||
> * 2-1/2"C and larger: EMT-SS OH
|
||||
>
|
||||
> Levels 3-5 (Type IIIA):
|
||||
> * Concealed: NM/SER
|
||||
> * Exposed to Structure: PVC OH
|
||||
|
||||
## Slab Thickness
|
||||
|
||||
Conduits may not be routed through slabs of thickness
|
||||
less than 3 times the outer diameter of the conduit.
|
||||
|
||||
| Conduit Size | Minimum Slab Thickness (in) |
|
||||
| ------------:| ---------------------------:|
|
||||
| 1/2" | 3.0 |
|
||||
| 3/4" | 3.5 |
|
||||
| 1" | 4.0 |
|
||||
| 1-1/4" | 5.0 |
|
||||
| 1-1/2" | 6.0 |
|
||||
| 2" | 7.5 |
|
||||
| 3" | 9.0 |
|
||||
| 2-1/2" | 10.5 |
|
||||
| 3-1/2" | 12.0 |
|
||||
| 4" | 13.5 |
|
||||
| 5" | 17.0 |
|
||||
| 6" | 20.0 |
|
||||
|
||||
## By Finish
|
||||
|
||||
Cable type raceways (MC, NM, SE)
|
||||
may only be used where they will be concealed from view.
|
||||
|
||||
Exception:
|
||||
Temporary provisions for unfinished spaces (e.g. core and shell retail)
|
||||
|
||||
## By Construction Type
|
||||
|
||||
Nonmetallic-sheathed cables (NM/SER)
|
||||
are not permissible in Non-Combustible (Type I, II) constructions.
|
||||
|
||||
See [[ibc-construction-types]] for more info.
|
||||
|
||||
### Construction Types I, II
|
||||
|
||||
Nonmetallic-sheathed cables (NM, SE, etc.)
|
||||
are not fire code permissible in these types.
|
||||
|
||||
PVC < MC < EMT < IMC < RMC
|
||||
|
||||
### Construction Types III, IV, V
|
||||
|
||||
NM/SE < PVC < EMT < IMC < RMC
|
||||
|
||||
## By Wiring Method
|
||||
|
||||
### Electrical Metallic Tubing (EMT)
|
||||
|
||||