@@ -16,6 +16,7 @@ dg-publish: true
|
||||
> Complete [[emergency-systems-research]] before beginning takeoff.
|
||||
|
||||
> [!info]
|
||||
> This note is intended for practice specific to [[pdi-estimating]].
|
||||
> See [[fire-alarm]] for information about fire alarm systems.
|
||||
|
||||
* `System` = "FA - Fire Alarm"
|
||||
@@ -24,9 +25,11 @@ dg-publish: true
|
||||
|
||||
Free Air < PVC in Slab < EMT
|
||||
|
||||
_High Rise (Steel & slab):_ Free air in Units, use conduit elsewhere.
|
||||
_High Rise (Steel & slab):_ Free air in Units, use conduit elsewhere.[^1]
|
||||
_Mid Rise, High Density (Wood frame):_ Free air, conduit only where required.
|
||||
|
||||
[^1]: [[2026-02-26_10-06-19]]
|
||||
|
||||
## Backbone
|
||||
|
||||
Include [[sleeving-takeoff]] as necessary.
|
||||
@@ -145,9 +148,11 @@ For each stairwell:
|
||||
|
||||
## Central Monitoring Loop
|
||||
|
||||
* `System` = "FAR - Fire Alarm Loop"
|
||||
|
||||
> [!important]
|
||||
> Garden Style only.
|
||||
|
||||
>
|
||||
> Fire Alarm Control Panels from each building will send a signal to a central location.
|
||||
>
|
||||
> In case of an emergency,
|
||||
@@ -198,8 +203,6 @@ _Design Build (alternative method):_
|
||||
> [!info]
|
||||
> Refers to fire, smoke, and combination fire/smoke dampers.
|
||||
|
||||
|
||||
|
||||
In [[pdi-building-types#High Rise|high rise construction]],
|
||||
usually found on every level with units.
|
||||
|
||||
|
||||