vault backup: 2026-02-26 17:07:19

This commit is contained in:
2026-02-26 17:07:19 -05:00
parent 802377a012
commit ab1e5b8042
53 changed files with 431 additions and 46 deletions
+1 -1
View File
@@ -3,7 +3,7 @@
"hasMigratedDailyNoteSettings": true,
"hasMigratedWeeklyNoteSettings": false,
"daily": {
"folder": "",
"folder": "daily",
"template": "templates/daily.md",
"enabled": true
},
+10
View File
@@ -0,0 +1,10 @@
---
id:
aliases: []
title:
tags:
- authorship/original
- destiny/permanent
- status/not-started
- occupational/project
---
+10
View File
@@ -0,0 +1,10 @@
---
id:
aliases: []
title:
tags:
- authorship/original
- destiny/permanent
- status/not-started
- occupational/project
---
+11
View File
@@ -0,0 +1,11 @@
---
id:
aliases: []
title: 2100 Crystal Drive
tags:
- authorship/original
- destiny/permanent
- occupational/project
- status/not-started
---
# 2100 Crystal Drive
+10
View File
@@ -0,0 +1,10 @@
---
id:
aliases: []
title:
tags:
- authorship/original
- destiny/permanent
- status/not-started
- occupational/project
---
+10
View File
@@ -0,0 +1,10 @@
---
id:
aliases: []
title:
tags:
- authorship/original
- destiny/permanent
- status/not-started
- occupational/project
---
+17
View File
@@ -0,0 +1,17 @@
---
id: 2026-02-26
aliases: []
title: 2026-02-26
tags:
- authorship/original
- destiny/permanent
- status/draft
- type/periodic/daily
dg-publish: true
date-created: 2026-02-26T11:07:39-05:00
weekly: "[[2026-W09]]"
monthly: "[[2026-02]]"
quarterly: "[[2026-Q1]]"
yearly: "[[2026]]"
---
# 2026-02-26
+10
View File
@@ -0,0 +1,10 @@
---
id:
aliases: []
title:
tags:
- authorship/original
- destiny/permanent
- status/not-started
- occupational/project
---
+7 -4
View File
@@ -16,6 +16,7 @@ dg-publish: true
> Complete [[emergency-systems-research]] before beginning takeoff.
> [!info]
> This note is intended for practice specific to [[pdi-estimating]].
> See [[fire-alarm]] for information about fire alarm systems.
* `System` = "FA - Fire Alarm"
@@ -24,9 +25,11 @@ dg-publish: true
Free Air < PVC in Slab < EMT
_High Rise (Steel & slab):_ Free air in Units, use conduit elsewhere.
_High Rise (Steel & slab):_ Free air in Units, use conduit elsewhere.[^1]
_Mid Rise, High Density (Wood frame):_ Free air, conduit only where required.
[^1]: [[2026-02-26_10-06-19]]
## Backbone
Include [[sleeving-takeoff]] as necessary.
@@ -145,9 +148,11 @@ For each stairwell:
## Central Monitoring Loop
* `System` = "FAR - Fire Alarm Loop"
> [!important]
> Garden Style only.
>
> Fire Alarm Control Panels from each building will send a signal to a central location.
>
> In case of an emergency,
@@ -198,8 +203,6 @@ _Design Build (alternative method):_
> [!info]
> Refers to fire, smoke, and combination fire/smoke dampers.
In [[pdi-building-types#High Rise|high rise construction]],
usually found on every level with units.
+10
View File
@@ -0,0 +1,10 @@
---
id:
aliases: []
title:
tags:
- authorship/original
- destiny/permanent
- status/not-started
- occupational/project
---
+10
View File
@@ -0,0 +1,10 @@
---
id:
aliases: []
title:
tags:
- authorship/original
- destiny/permanent
- status/not-started
- occupational/project
---
+10
View File
@@ -0,0 +1,10 @@
---
id:
aliases: []
title:
tags:
- authorship/original
- destiny/permanent
- status/not-started
- occupational/project
---
+10
View File
@@ -0,0 +1,10 @@
---
id:
aliases: []
title:
tags:
- authorship/original
- destiny/permanent
- status/not-started
- occupational/project
---
+10
View File
@@ -0,0 +1,10 @@
---
id:
aliases: []
title:
tags:
- authorship/original
- destiny/permanent
- status/not-started
- occupational/project
---
+10
View File
@@ -0,0 +1,10 @@
---
id:
aliases: []
title:
tags:
- authorship/original
- destiny/permanent
- status/not-started
- occupational/project
---
+10
View File
@@ -0,0 +1,10 @@
---
id:
aliases: []
title:
tags:
- authorship/original
- destiny/permanent
- status/not-started
- occupational/project
---
+2 -2
View File
@@ -20,9 +20,9 @@ dg-publish: true
Takeoff: `ITEM DATABASE`/`MISC PDI PRODUCT`/`MISC MATERIAL - SLAB/DECK & FEEDER`/`MISC MATERIAL - SLAB/DECK (NAILS, PAINT, TAPE, ETC = $250)`
1. * `Area` = "Typical - Building All Levels"
1. * `Area` = "Typical - Building All Levels" (each level except roof)
* `Phase` = "Building - BOH, Storage & Common"
* **Count** = 1 each level except roof
* **Count** = 1
* _High Density:_ 1 per Section
2. * `Area` = "Typical - Garage All Levels"
+10
View File
@@ -0,0 +1,10 @@
---
id:
aliases: []
title:
tags:
- authorship/original
- destiny/permanent
- status/not-started
- occupational/project
---
+10
View File
@@ -0,0 +1,10 @@
---
id:
aliases: []
title:
tags:
- authorship/original
- destiny/permanent
- status/not-started
- occupational/project
---
+10
View File
@@ -0,0 +1,10 @@
---
id:
aliases: []
title:
tags:
- authorship/original
- destiny/permanent
- status/not-started
- occupational/project
---
+10
View File
@@ -0,0 +1,10 @@
---
id:
aliases: []
title:
tags:
- authorship/original
- destiny/permanent
- status/not-started
- occupational/project
---
+4 -4
View File
@@ -37,11 +37,11 @@ dg-publish: true
8. Go into each Sort code to find the count for each unit item
| Code | Description |
| Code | Description |
| ---- | -------------------- |
| 200 | rough |
| 300 | trim |
| 400 | rough wire and cable |
| 200 | rough |
| 300 | trim |
| 400 | rough wire and cable |
9. Some items will autofill when you fill out the "Accubid Extension Totals" table on the right
+10
View File
@@ -0,0 +1,10 @@
---
id:
aliases: []
title:
tags:
- authorship/original
- destiny/permanent
- status/not-started
- occupational/project
---
@@ -0,0 +1,10 @@
---
id:
aliases: []
title:
tags:
- authorship/original
- destiny/permanent
- status/not-started
- occupational/project
---
+5
View File
@@ -44,6 +44,11 @@ If no table is provided, use the following:
Route from meter center to unit load center.
#### Voltage Drop
Larger of the listed demand current
and 80% of the panel rating.
#### Pigtail Adaptors
[[distribution-equipment#Pigtail Adaptors|Pigtail Adaptors]]
+10
View File
@@ -0,0 +1,10 @@
---
id:
aliases: []
title:
tags:
- authorship/original
- destiny/permanent
- status/not-started
- occupational/project
---
+3 -1
View File
@@ -20,7 +20,9 @@ Count Car chargers and location
## Generator
Ensure takeoff is in the generator `Area` and `System` breakdowns
Ensure takeoff is in the generator `Area` and `System` breakdowns.[^1]
[^1]: [[switchgear-takeoff#Generator]]
Put location, quantity, and type on OneNote
+10
View File
@@ -0,0 +1,10 @@
---
id:
aliases: []
title:
tags:
- authorship/original
- destiny/permanent
- status/not-started
- occupational/project
---
+10
View File
@@ -0,0 +1,10 @@
---
id:
aliases: []
title:
tags:
- authorship/original
- destiny/permanent
- status/not-started
- occupational/project
---
+2
View File
@@ -14,6 +14,8 @@ dg-publish: true
### Belle Meade Director Review
[[belle-meade-plaza]]
#### Takeoff Review
Reviewed takeoff by system.
+1 -3
View File
@@ -20,9 +20,7 @@ but that it is frequently judged from a _realist_ perspective.
See [[realism-vs-instrumentalism]].
There may be a more accurate way to state this.
[[2025-11-10#2025-11-10 11 14]] may be an example of a similar issue,
[[2025-11-10_11-14-00]] may be an example of a similar issue,
where instrumental methods are presented as if they were realist,
causing confusion when the methods are,
as judged from a realist perspective, wrong.
[[2025-11-13_08-19-01]]
+14 -6
View File
@@ -1,12 +1,20 @@
## 2025-11-13 ??:??:??
---
id:
aliases: []
title: 2025-11-13 ??:??:??
tags:
- authorship/original
- destiny/permanent
- occupational
- type/timestamped
---
# 2025-11-13 ??:??:??
#occupational
### Questions for Bid Estimators
## Questions for Bid Estimators
Questions for [[pdi-estimating#Bid Estimating|PDI Bid Estimators]].
#### Exclusions
### Exclusions
When we send proposals with significant exclusions
(no lighting control, no demo, no submetering,
@@ -15,4 +23,4 @@ even when designed and shown on drawings):
Is there a conversation happening with our customers
before they receive our proposal?
Is it clear they understand what we're excluding?
Is it clear they understand what we're excluding?
+2
View File
@@ -14,6 +14,8 @@ dg-publish: true
## Elliot St. ConEst Senior Review
[[elliott-st-hotel]]
%%
Transcription of notes
taken while reviewing Elliot St. with Joel Jansen.
+2
View File
@@ -14,6 +14,8 @@ dg-publish: true
## Elliot St. WBS Prep
[[elliott-st-hotel]]
MC multi-circuit homeruns have makeup included
($\text{Length} \times 1.1$)
+1 -1
View File
@@ -9,7 +9,7 @@ dg-publish: true
---
# 2025-12-19 10:44:??
> [!quote] Art Baldwin 2025-12-19, in reference to Howard University East Towers (pp.)
> [!quote] Art Baldwin 2025-12-19, in reference to [[howard-university-east-towers]] (pp.)
> When using PVC slab box assemblies where substantial insulation
> (e.g mineral wool, spray foam) is to be applied,
> add extension rings to compensate for the thickness
+1 -1
View File
@@ -46,5 +46,5 @@ $10,000 per [[heavy-equipment#Swing Stage Scaffolding|swing stage]]
#### Unit Typicals
I asked Joel about using unit typicals as described in
[[2025-12-19#2025-12-19 10:44]].
[[2025-12-19_10-44-01]].
He stated that would be acceptable.
+1 -1
View File
@@ -8,7 +8,7 @@ dg-publish: true
---
# 2026-01-11 09:00:??
[[2026-01-09#2026-01-09 14:45]]
[[2026-01-09_14-45-00]]
[[bid-price-modeling]]
+5 -6
View File
@@ -14,9 +14,8 @@ dg-publish: true
Follow-up to [[2026-01-13#Lighting Control]]
Conversation between Joel Jansen and Christian Pereiro
regarding lighting control for 2100 Crystal Drive:
Joel: "It was sold as local."
Christian: "Yeah, but you can't do that."
> [!quote] Conversation between Joel Jansen and Christian Pereiro regarding lighting control for [[2100-crystal-drive]]:
>
> **Joel:** "It was sold as local."
>
> **Christian:** "Yeah, but you can't do that."
+1 -1
View File
@@ -8,6 +8,6 @@ dg-publish: true
---
# 2026-01-15 08:11:10
Follow-up to [[2026-01-12#2026-01-12 12:23|2026-01-12 12:23]]
Follow-up to [[2026-01-12_12-23-??|2026-01-12 12:23]]
Left Apartment at 05:30, at terminal around 06:10.
+1 -1
View File
@@ -8,5 +8,5 @@ dg-publish: true
---
# 2026-01-15 08:15:??
[[2025-11-13#2025-11-13 08:19]]
[[2025-11-13_08-19-00]]
I spoke to a peer about this yesterday.
+2 -2
View File
@@ -7,7 +7,7 @@ dg-publish: true
---
# 2026-01-19 11:57:39
Follow-up to [[2026-01-10#2026-01-10 08:42]]
Follow-up to [[2026-01-10_08-42-00]]
A **natural language parser** would be a big help
for the sort of formatting I've been doing recently.
@@ -16,4 +16,4 @@ for the sort of formatting I've been doing recently.
[[semantic-line-breaks]]
[[2025-10-26#2025-10-26 18:36 --- Sunday evening]]
[[2025-10-26_18-36-?? --- Sunday evening]]
+1 -1
View File
@@ -7,7 +7,7 @@ dg-publish: true
---
# 2026-01-20 10:10:??
I was reminded again of [[2025-12-04#2025-12-04 09:51]].
I was reminded again of [[2025-12-04_09-51-17]].
I added a [[small-tasks|task]] for it.
[html-calculators](https://github.com/ZaneMeyers/html-calculators)
+1 -1
View File
@@ -12,7 +12,7 @@ dg-publish: true
#### Quote
> [!quote] Joel Jansen [[2026-01-15#2026-01-15 13:27]] (pp.)
> [!quote] Joel Jansen 2026-01-15 13:27 (pp.)
> I'd rather have an accurate budget than an accurate BOM.
#### Context
+2 -2
View File
@@ -9,9 +9,9 @@ dg-publish: true
Migrated several notes from Google's Keep
[[2025-10-20#2025-10-20 ??:??]]
[[2025-10-20_01-00-00]]
[[2026-01-04#2026-01-04 ??:??]]
[[2026-01-04_00-00-00]]
[[my-resoluute-banjo]]
+38
View File
@@ -0,0 +1,38 @@
---
id: 2026-02-26T09:02:35-05:00
aliases: []
title: "2026-02-26 09:02:35"
tags:
- authorship/original
- destiny/permanent
- status/draft
- type/timestamped
dg-publish: true
date-created: 2026-02-26T09:02:35-05:00
daily: "[[2026-02-26]]"
weekly: "[[2026-W09]]"
monthly: "[[2026-02]]"
quarterly: "[[2026-Q1]]"
yearly: "[[2026]]"
---
# 2026-02-26 09:02:35
## Problematic Typical Takeoff Workflow
User is taking off scope for Zones 1--8.
User takes off all similar devices in Zone 1,
and continues takeoff through Zone 04,
before realizing that some scope for Zone 1
is typical of Zones 1--8.
User must decide between deleting the redundant takeoff in Zones 2--4
(cluttering and confusing the timeline of the audit trail)
and continuing takeoff as if the scope were not typical
(increasing time of takeoff and reducing flexibility).
The ability to reorder and permanently delete takeoff
would invalidate most concerns here,
however Accubid's solution to typical scope
(named-typicals-as-breakdowns)
is still clunky and unsuitable for large projects.
+59
View File
@@ -0,0 +1,59 @@
---
id: 2026-02-26T10:06:19-05:00
aliases: []
title: "2026-02-26 10:06:19"
tags:
- authorship/original
- destiny/permanent
- status/draft
- type/timestamped
- occupational/takeoff
dg-publish: true
date-created: 2026-02-26T10:06:19-05:00
daily: "[[2026-02-26]]"
weekly: "[[2026-W09]]"
monthly: "[[2026-02]]"
quarterly: "[[2026-Q1]]"
yearly: "[[2026]]"
---
# 2026-02-26 10:06:19
## Fire Alarm Wiring Methods
[[fire-alarm-takeoff]]
> [!quote] Zane Meyers @ 09:35 to Joel Jansen via Teams regarding [[1990-k-street]]
> From our Pre-Takeoff email:
>
> > **Fire Alarm:** Devices PVC in-slab, Risers EMT.
>
> Still PVC for Retail shell and Amenity, Building areas with dropped ceilings?
### Regarding Retail
> [!quote] Joel Jansen @ ~10:00 (pp.)
> Use EMT for Retail shell spaces.
> Sometimes Free-Air may be acceptable, but assume not.
> Seek guidance where Retail space is significant.[^1]
[^1]: See [[belle-meade-plaza]] Retail Village for example.
### Regarding Amenity, Building
> [!quote] Joel Jansen @ ~10:00 (pp.)
> Confirmed, follow Pre-Takeoff email.
>
> In general,
> for [[pdi-building-types#High Rise|High Rise]] projects,
> assume Free-Air devices will not be allowed
> in other than [[units-takeoff|Units]].
I expressed that,
from a [[realism-vs-instrumentalism|realist]] perspective,
the `... DEVICES WITH WIRE - PVC` assemblies
are unsuitable for use in drop ceilings
since they don't provide a flex whip and box.
> [!quote] Joel Jansen @ ~10:00 (pp.)
> It is understood that the assemblies are not strictly suitable,
> their use is intended to be budgetary.
+1 -1
View File
@@ -60,7 +60,7 @@ require communication systems per
> redundant with the standard takeoff described above.
> These assemblies can be ignored
> unless given specific direction otherwise.
> Confirmed by Joel Jansen 2025-12-08 in reference to 2100 Crystal Drive.
> Confirmed by Joel Jansen 2025-12-08 in reference to [[2100-crystal-drive|2100 Crystal Drive]].
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`COMMUNICATION DEVICES ...`/`...`
+1 -1
View File
@@ -100,7 +100,7 @@ Used in lieu of individual split systems.
### Dishwasher/Disposal Receptacles
> [!quote] Joel Jansen 2026-01-12 in Reference to Woodbrook (pp.)[^1]
> [!quote] Joel Jansen 2026-01-12 in Reference to [[woodbrook]] (pp.)[^1]
> Even when drawings show 2 separate duplex receptacles,
> use `DW & DISPOSAL DUAL CIR - ...`,
> which includes only one receptacle.
@@ -0,0 +1,10 @@
---
id:
aliases: []
title:
tags:
- authorship/original
- destiny/permanent
- status/not-started
- occupational/project
---
+14 -6
View File
@@ -18,7 +18,15 @@ Determine where each wiring method can be used.
> This note covers general, system-agnostic selection.
> For certain specific applications,
> It may be necessary to deviate from the general case.
>
%% TODO
Scripts by others tend to beg questions of edge cases.
It's my intent that if a rule holds in _all_ cases,
even the super special one you're thinking I didn't consider,
that I specifically say so.
If I didn't say so, and your edge case is not covered,
you should seek clarification.
%%
## Example Wiring Method Selection
@@ -116,10 +124,10 @@ may be routed through with special permission.
[[construction-methods#Post-Tensioned Slab|Post-Tensioned Slab]]
> [!cite] Joel Jansen 2025-08-15, in reference to Belle Meade Plaza (pp.)
> [!cite] Joel Jansen 2025-08-15, in reference to [[belle-meade-plaza|Belle Meade Plaza]] (pp.)
> No affect on takeoff. Routing in slab still possible.
> [!cite] Joel Jansen 2025-08-21, in reference to Belle Meade Plaza (pp.)
> [!cite] Joel Jansen 2025-08-21, in reference to [[belle-meade-plaza|Belle Meade Plaza]] (pp.)
> PT slabs do have some affect on takeoff.
> 3in conduit can not be run in an 11in PT slab.
@@ -127,7 +135,7 @@ may be routed through with special permission.
[[construction-methods#Pan Deck Slab|Pan Deck Slab]]
> [!cite] Joel Jansen 2025-08-15, in reference to Belle Meade Plaza (pp.)
> [!cite] Joel Jansen 2025-08-15, in reference to [[belle-meade-plaza|Belle Meade Plaza]] (pp.)
> Do not route in slab.
### MC Cable Overhead
@@ -167,7 +175,7 @@ but may not be acceptable.
> These are usually only mentioned in specifications
> to say that they are unacceptable.
> [!info] Edge Case: Vanderbilt Central Neighborhood Residential College
> [!info] Edge Case: [[vanderbilt-central-neighborhood-residential-college]]
>
> > [!cite] Vanderbilt Central Neighborhood Residential College - Project Specifications (pp.)
> > Fittings for Type EMT Duct Raceways:
@@ -233,4 +241,4 @@ This usually requires no change to takeoff for high-rises
since electrical riser rooms are themselves fire-rated.
* RHW-2 insulated conductors in conduit --- "Lifeline Cable"
* 2-hour rated metal clad cable --- "Vitalink"
* 2-hour rated metal clad cable --- "Vitalink"
+11
View File
@@ -0,0 +1,11 @@
---
id:
aliases: []
title: Woodbrook
tags:
- authorship/original
- destiny/permanent
- occupational/project
- status/not-started
---
# Woodbrook