Files
zmVault/timestamped/2026-01-08_13-33-34.md
T

959 B

id, aliases, title, tags, dg-publish
id aliases title tags dg-publish
type/timestamped
true

2026-01-08 13:33:34

2100 Crystal Drive Takeoff Review

Generators

[!failure] Generators were erroneously broken down in switchgear.

switchgear-takeoff#Generator

Switchgear

Switchgear cost comp "\EgnyteDrive\Shared\Estimating\11 Bid Estimating Spreadsheets\Switchgear Pricing Tool Version 2 (2.02.2024) (Template) - Copy.xls"

Includes

  • submetering
  • coordination study

Composite Cleanup

1 day per week


\text{Average Weeks Per Month} =

It occurs to me I don't know all the rules of our calendar Gregorian calendar - Wikipedia

Temp Power

$10,000 per heavy-equipment#Swing Stage Scaffolding

temp-power-takeoff

Unit Typicals

I asked Joel about using unit typicals as described in 2025-12-19_10-44-01. He stated that would be acceptable.