vault backup: 2026-02-26 17:07:19
This commit is contained in:
@@ -44,6 +44,11 @@ If no table is provided, use the following:
|
||||
|
||||
Route from meter center to unit load center.
|
||||
|
||||
#### Voltage Drop
|
||||
|
||||
Larger of the listed demand current
|
||||
and 80% of the panel rating.
|
||||
|
||||
#### Pigtail Adaptors
|
||||
|
||||
[[distribution-equipment#Pigtail Adaptors|Pigtail Adaptors]]
|
||||
|
||||
Reference in New Issue
Block a user