vault backup: 2025-07-23 16:43:54
This commit is contained in:
@@ -8,33 +8,33 @@ tags: []
|
||||
## 1. Trash Chute
|
||||
|
||||
Horizontal:
|
||||
- Check if shown on power drawings as mech connection
|
||||
- If not, use 100ft length
|
||||
* Check if shown on power drawings as mech connection
|
||||
* If not, use 100ft length
|
||||
|
||||
Vertical (Riser):
|
||||
- Takeoff: `COMMON ASSEMBLIES`/`MISC ASSEMBLIES`/`TRASH CHUTE RISER CIRCUIT...`
|
||||
- Uncheck Link 'Enable Livecount'
|
||||
- Takeoff in Typical
|
||||
- Length = average floor to floor height
|
||||
* Takeoff: `COMMON ASSEMBLIES`/`MISC ASSEMBLIES`/`TRASH CHUTE RISER CIRCUIT...`
|
||||
* Uncheck Link 'Enable Livecount'
|
||||
* Takeoff in Typical
|
||||
* Length = average floor to floor height
|
||||
|
||||
## 2. CU/IP
|
||||
|
||||
- Units Condensing Unit
|
||||
- Mechanical Connection
|
||||
* Units Condensing Unit
|
||||
* Mechanical Connection
|
||||
|
||||
## 3. Slab Deck
|
||||
|
||||
Create Area Typicals for every Concrete slab floor:
|
||||
|
||||
- 'All Building'
|
||||
- 1 every level (Not Roof)
|
||||
- HD: 1 Per Section
|
||||
* 'All Building'
|
||||
* 1 every level (Not Roof)
|
||||
* HD: 1 Per Section
|
||||
|
||||
- 'All Garage'
|
||||
- 1 every level
|
||||
* 'All Garage'
|
||||
* 1 every level
|
||||
|
||||
- Takeoff: `ITEM DATABASE`/`MISC PDI PRODUCT`/`MISC MATERIAL - SLAB/DECK & FEEDER`/`MISC MATERIAL - SLAB/DECK (NAILS, PAINT, TAPE, ETC = $250)`
|
||||
- 1 Takeoff each Typical, Count = 1
|
||||
* Takeoff: `ITEM DATABASE`/`MISC PDI PRODUCT`/`MISC MATERIAL - SLAB/DECK & FEEDER`/`MISC MATERIAL - SLAB/DECK (NAILS, PAINT, TAPE, ETC = $250)`
|
||||
* 1 Takeoff each Typical, Count = 1
|
||||
|
||||
## 4. Temporary Power & Lighting
|
||||
|
||||
@@ -46,8 +46,9 @@ Phase = "Temp Power"
|
||||
System = "TPS - Temp Power Service (Site)"
|
||||
BidItem = "1 - Site"
|
||||
```
|
||||
|
||||
Hoxton Hotel (aka Nashville Hotel)
|
||||
- Takeoff: `ITEM DATABASE`/`TEMPORARY POWER`/`TEMPORARY POWER - * SERVICE`
|
||||
* Takeoff: `ITEM DATABASE`/`TEMPORARY POWER`/`TEMPORARY POWER - * SERVICE`
|
||||
|
||||
### 4.2A Temp Lighting (Building)
|
||||
|
||||
@@ -58,12 +59,12 @@ System = "TPD - Temp Power Distribution (Gag. & Bldg.)"
|
||||
BidItem = "3 - Building"
|
||||
```
|
||||
|
||||
- Takeoff: `ITEM DATABASE`/`TEMPORARY POWER`/`* - TEMPORARY LIGHTING / PWR PNL (PER BLDG AREA SFT)`
|
||||
- *Count* = Building Size = Total GSF - Garage GSF
|
||||
* Takeoff: `ITEM DATABASE`/`TEMPORARY POWER`/`* - TEMPORARY LIGHTING / PWR PNL (PER BLDG AREA SFT)`
|
||||
* _Count_ = Building Size = Total GSF - Garage GSF
|
||||
|
||||
Garden Styles:
|
||||
- Takeoff: `ITEM DATABASE`/`TEMPORARY POWER`/`TEMPORARY POWER - T POLE (EACH)`
|
||||
- *Count* = 1 per 150' per building
|
||||
* Takeoff: `ITEM DATABASE`/`TEMPORARY POWER`/`TEMPORARY POWER - T POLE (EACH)`
|
||||
* _Count_ = 1 per 150' per building
|
||||
|
||||
### 4.2B Temp Lighting (Garage)
|
||||
|
||||
@@ -74,8 +75,8 @@ System = "TPD - Temp Power Distribution (Gag. & Bldg.)"
|
||||
BidItem = "3 - Building"
|
||||
```
|
||||
|
||||
- Takeoff: `ITEM DATABASE`/`TEMPORARY POWER`/`* - TEMPORARY LIGHTING / PWR PNL (PER BLDG AREA SFT)`
|
||||
- *Count* = Garage SF
|
||||
* Takeoff: `ITEM DATABASE`/`TEMPORARY POWER`/`* - TEMPORARY LIGHTING / PWR PNL (PER BLDG AREA SFT)`
|
||||
* _Count_ = Garage SF
|
||||
|
||||
## 5. Irrigation pumps
|
||||
|
||||
@@ -86,5 +87,5 @@ System = `MISC - Site Miscellaneous`
|
||||
BidItem = "1 - Site"
|
||||
```
|
||||
|
||||
- (3) 3Phase 30A 200' Mech. Con.
|
||||
- Append to name: "Irrigation Pump - "
|
||||
* (3) 3Phase 30A 200' Mech. Con.
|
||||
* Append to name: "Irrigation Pump - "
|
||||
|
||||
@@ -1,6 +1,44 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags: []
|
||||
---
|
||||
# Feeders
|
||||
|
||||
* Use 15ft adders for site runs
|
||||
(primaries, secondaries, etc.),
|
||||
as opposed to standard 10ft adder,
|
||||
to account for variability.
|
||||
|
||||
## Cable Support
|
||||
|
||||
> [!quote] 300.19 Supporting Conductors in Vertical Raceways.
|
||||
> **(A) Spacing Intervals -- Maximum.**
|
||||
> Conductors in vertical raceways shall be supported
|
||||
> if the vertical rise exceeds the values in Table 300.19(A).
|
||||
> At least one support method shall be provided for each conductor
|
||||
> at the top of the vertical raceway or as close to the top as practical.
|
||||
> Intermediate supports shall be provided
|
||||
> as necessary to limit supported conductor lengths
|
||||
> to not greater than those values specified in Table 300.19(A).
|
||||
|
||||
> [!cite] Table 300.19(A) Spacings for Conductor Supports
|
||||
>
|
||||
> | Conductor Size | Aluminum or Copper-Clad Aluminum | Copper |
|
||||
> | -------------------------------- | --------------------------------:| ------:|
|
||||
> | 18 AWG through 8 AWG | 100ft | 100ft |
|
||||
> | 6 AWG through 1/0 AWG | 200ft | 100ft |
|
||||
> | 2/0 AWG through 4/0 AWG | 180ft | 80ft |
|
||||
> | Over 4/0 AWG through 350 kcmil | 135ft | 60ft |
|
||||
> | Over 350 kcmil through 500 kcmil | 120ft | 50ft |
|
||||
> | Over 500 kcmil through 750 kcmil | 95ft | 40ft |
|
||||
> | Over 750 kcmil | 85ft | 35ft |
|
||||
|
||||
## Sleeving
|
||||
|
||||
Provide sleeves for all feeder conduits passing through floors.
|
||||
|
||||
* ID.31 Hilti
|
||||
* P = Plastic => Concrete
|
||||
* M = Metal => Wood Frame
|
||||
* Round 1" to 2"
|
||||
|
||||
@@ -1,3 +1,8 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags: []
|
||||
---
|
||||
# Lighting Controls
|
||||
|
||||
## Information
|
||||
@@ -16,7 +21,7 @@ By PDI convention, lighting controls are generally "Electrical", not "Lighting".
|
||||
|
||||
> [!info] "Local Control" as a PDI proposal qualification
|
||||
> The term "local control only" is sometimes used to indicate
|
||||
> no consideration for *any* lighting control beyond standard devices,
|
||||
> no consideration for _any_ lighting control beyond standard devices,
|
||||
> (with `$D`'s being the triac type)
|
||||
> however, this phrasing is ambiguous and non-universal.
|
||||
> Confirm with the bid team on what must be included.
|
||||
|
||||
@@ -1,3 +1,8 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags: []
|
||||
---
|
||||
# Lighting (Fixtures)
|
||||
|
||||
## Info
|
||||
@@ -22,6 +27,7 @@
|
||||
Use empty designations to separate phases.
|
||||
|
||||
> [!example]
|
||||
>
|
||||
> ```
|
||||
> *** Hotel Units ***
|
||||
> HU - Surface (MC) LV 20ft
|
||||
@@ -39,43 +45,43 @@ Use empty designations to separate phases.
|
||||
> | Fixture Type | Labor |
|
||||
> | ------------ | -------------- |
|
||||
> | Paddle Fan | 1.5 hrs/ea |
|
||||
> | Pendant | 1-4 hrs/ea[^1] |
|
||||
> | Pendant | 1-4 hrs/ea[^6] |
|
||||
> | Strip/Cove | 0.083 hrs/ft |
|
||||
> | Site Poles | 1.5 hrs/ea |
|
||||
> | Festoon | 2 hrs/ea |
|
||||
> | All Others | 1 hrs/ea |
|
||||
>
|
||||
> [^1]: Determine exact labor from fixture and size.
|
||||
> [^6]: Determine exact labor from fixture and size.
|
||||
|
||||
#### Fixture Branch Length
|
||||
|
||||
> | Case | Standard Length |
|
||||
> | ------------- | --------------- |
|
||||
> | Site/Courtyard | 50ft[^1] |
|
||||
> | Site/Courtyard | 50ft[^6] |
|
||||
> | Garage | 50ft |
|
||||
> | BOH | 40ft |
|
||||
> | Corridors | 40ft |
|
||||
> | Interior Amenity | 40ft[^2] |
|
||||
> | Interior Amenity | 40ft[^7] |
|
||||
> | Office/Retail | 50ft |
|
||||
> | Exterior Amenity | 50ft |
|
||||
> | Units | 20ft |
|
||||
>
|
||||
> [^1]: Locate the panel and come up with avg. length
|
||||
> [^6]: Locate the panel and come up with avg. length
|
||||
>
|
||||
> [^2]: See fixture types below for special cases.
|
||||
> [^7]: See fixture types below for special cases.
|
||||
|
||||
#### Fixture Branch Wire size
|
||||
|
||||
> | Case | Wire Size |
|
||||
> | -------------- | --------- |
|
||||
> | Site/Courtyard | #10[^1] |
|
||||
> | Site/Courtyard | #10[^6] |
|
||||
> | Garage | #10 |
|
||||
> | NM Cable | #14[^2] |
|
||||
> | NM Cable | #14[^7] |
|
||||
> | All Others | #12 |
|
||||
>
|
||||
> [^1]: Refer to panel schedules or Site Pole Detail for Site Pole wire size
|
||||
>
|
||||
> [^2]: Kitchen and bathroom fixtures shall be #12 (NOT #14) on wood frame (NM) projects.
|
||||
> [^6]: Refer to panel schedules or Site Pole Detail for Site Pole wire size
|
||||
>
|
||||
> [^7]: Kitchen and bathroom fixtures shall be #12 (NOT #14) on wood frame (NM) projects.
|
||||
|
||||
#### Garage
|
||||
|
||||
@@ -110,13 +116,13 @@ Use assembly `Common Assemblies`/`Device Homeruns in Slab/Deck`
|
||||
> * Tape
|
||||
> * Track
|
||||
|
||||
| Wiring Method | Assembly Path |
|
||||
| Wiring Method | Assembly Path |
|
||||
| ---------------------------------------------------------------------------- |
|
||||
| NM Cable | `NM ASSEMBLIES`/`RND BOX BAR HNGR...` |
|
||||
| MC Cable | `MC ASSEMBLIES`/`SQ BOX, ROUND P RING & MNTG BRKT...` |
|
||||
| PVC in Ceiling | `PVC/ENT ASSEMBLIES`/`... - SLAB BOX / 45 DEG STUBBY` |
|
||||
| PVC in Wall | `PVC/ENT ASSEMBLIES`/`3/4" PVC W/ 3#12 - STL BOX/TILE RING` |
|
||||
| EMT | `EMT ASSEMBLIES`/`... - SQ BOX & ROUND P RING` |
|
||||
| NM Cable | `NM ASSEMBLIES`/`RND BOX BAR HNGR...` |
|
||||
| MC Cable | `MC ASSEMBLIES`/`SQ BOX, ROUND P RING & MNTG BRKT...` |
|
||||
| PVC in Ceiling | `PVC/ENT ASSEMBLIES`/`... - SLAB BOX / 45 DEG STUBBY` |
|
||||
| PVC in Wall | `PVC/ENT ASSEMBLIES`/`3/4" PVC W/ 3#12 - STL BOX/TILE RING` |
|
||||
| EMT | `EMT ASSEMBLIES`/`... - SQ BOX & ROUND P RING` |
|
||||
|
||||
> [!note]
|
||||
> Use lighting control cable assemblies in Amenity areas
|
||||
@@ -206,7 +212,7 @@ Length and Labor will be more than a normal fixture in BOH/Amenity
|
||||
> | Linear | See above |
|
||||
|
||||
> 1. `3/4" PVC W/ 3#10 - STL BOX & TILE RING / 45 DEG STUBBY/ ENT DROP`
|
||||
> * `Length per Unit` = Distance to panel
|
||||
> * `Length per Unit` = Distance to panel
|
||||
|
||||
#### Porte Cochere (Drive up Area)
|
||||
|
||||
@@ -231,15 +237,15 @@ Create its own breakout in WBS, and phase in Accubid
|
||||
> | Fixture Type | Assembly Path |
|
||||
> | ------------------------------------ | -------------------------------------------------------------------------------- |
|
||||
> | Step Light | `COURTYARDS & LANDSCAPE`/`STEP FIX, 3/4" CONDUIT - PVC40 - ...` |
|
||||
> | Bollard | `COURTYARDS & LANDSCAPE`/`BOLLARD, 3/4" CONDUIT - PVC40 - ...`[^1] |
|
||||
> | Bollard | `COURTYARDS & LANDSCAPE`/`BOLLARD, 3/4" CONDUIT - PVC40 - ...`[^6] |
|
||||
> | Up-light | `COURTYARDS & LANDSCAPE`/`PERMA POST, 3/4" CONDUIT - PVC40 - ...` |
|
||||
> | In-grade up-light | `COURTYARDS & LANDSCAPE`/`3/4" CONDUIT - PVC40, IMC Elbow, ...` |
|
||||
> | Fixtures built into cabanas/pergolas | `COURTYARDS & LANDSCAPE`/`ALUM BOX W/ FLEX FIX, 3/4" CONDUIT - PVC40 - ...` |
|
||||
> | Handrail light | `COURTYARDS & LANDSCAPE`/`ALUM BOX W/ FLEX FIX, 3/4" CONDUIT - PVC40 - ...`[^2] |
|
||||
> | Handrail light | `COURTYARDS & LANDSCAPE`/`ALUM BOX W/ FLEX FIX, 3/4" CONDUIT - PVC40 - ...`[^7] |
|
||||
>
|
||||
> [^1]: If we don't own concrete, delete Pre-cast bollard base from assembly
|
||||
> [^6]: If we don't own concrete, delete Pre-cast bollard base from assembly
|
||||
>
|
||||
> [^2]: Per Corwin: Hand rail lights should have a rigid 90 stub up and some flex
|
||||
> [^7]: Per Corwin: Hand rail lights should have a rigid 90 stub up and some flex
|
||||
|
||||
##### Festoon Lighting
|
||||
|
||||
@@ -247,8 +253,8 @@ Create its own breakout in WBS, and phase in Accubid
|
||||
|
||||
> 1. `FIXTURE LABOR`/`FIXTURE LABOR 2HR`
|
||||
> 2. `FESTOON & ROOF ASSEMBLIES`/`FESTOON CABLE HANGER & EYE BOLTS - LENGTH`
|
||||
> * `Length per Unit` = Light string length
|
||||
> * `Length per Unit` = Light string length
|
||||
> 3. `COURTYARDS & LANDSCAPE`/`ALUM BOX W/ FLEX FIX, 3/4" CONDUIT - PVC40 - ...`
|
||||
> * `Length per Unit` = Distance to panel + 15ft
|
||||
> * `Length per Unit` = Distance to panel + 15ft
|
||||
|
||||
### Takeoff
|
||||
|
||||
@@ -1,11 +1,16 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags: []
|
||||
---
|
||||
# Lightning Protection
|
||||
|
||||
## Info
|
||||
|
||||
Two Types:
|
||||
- Protection \$\$\$
|
||||
- Prevention \$
|
||||
- ESE (EARLY STREAMER EMISSIONS)
|
||||
* Protection \$\$\$
|
||||
* Prevention \$
|
||||
* ESE (EARLY STREAMER EMISSIONS)
|
||||
|
||||
## Estimate Scope
|
||||
|
||||
@@ -25,13 +30,13 @@ Search the quotes for direction on downlead counts, total length, and conduit si
|
||||
|
||||
If no quote is available:
|
||||
|
||||
- **Downlead locations** = building corners + additional locations
|
||||
* **Downlead locations** = building corners + additional locations
|
||||
such that downlead spacing is not greater than 100ft
|
||||
- Minimum 10 locations for High Rise
|
||||
* Minimum 10 locations for High Rise
|
||||
|
||||
- **Total downlead conduit length** = building height * downlead locations
|
||||
* **Total downlead conduit length** = building height * downlead locations
|
||||
|
||||
- **Conduit size** = 1-1/4"
|
||||
* **Conduit size** = 1-1/4"
|
||||
|
||||
### Takeoff
|
||||
|
||||
@@ -42,9 +47,9 @@ System = "LPT - Lightning Protection"
|
||||
BidItem = "3 - Building"
|
||||
```
|
||||
|
||||
- Takeoff: `COMMON ASSEMBLIES`/`PDI EMPTY CONDUIT`/`PVC ASSEMBLIES`/`* CONDUIT - PVC40`
|
||||
- **Length** = total downlead conduit length
|
||||
- **Count** = downlead locations
|
||||
* Takeoff: `COMMON ASSEMBLIES`/`PDI EMPTY CONDUIT`/`PVC ASSEMBLIES`/`* CONDUIT - PVC40`
|
||||
* **Length** = total downlead conduit length
|
||||
* **Count** = downlead locations
|
||||
|
||||
- Add item: `ITEM DATABASE`/`BOXES & CABINETS`/`JUNCTION BOXES AND INDUSTRIAL CABINETS`/
|
||||
`BOXES - HNGD CVR - PAINTED STEEL - NEMA 1`/` 6x 4x 4" BOX HNGD CVR - NEMA 1`
|
||||
* Add item: `ITEM DATABASE`/`BOXES & CABINETS`/`JUNCTION BOXES AND INDUSTRIAL CABINETS`/
|
||||
`BOXES - HNGD CVR - PAINTED STEEL - NEMA 1`/` 6x 4x 4" BOX HNGD CVR - NEMA 1`
|
||||
|
||||
@@ -58,8 +58,7 @@ Upload extracted drawings to LiveCount
|
||||
## Create Accubid Job
|
||||
|
||||
> [!important]
|
||||
> The LiveCount project must be created **before**
|
||||
> creating the Accubid job.
|
||||
> The LiveCount project must be created **before** creating the Accubid job.
|
||||
|
||||
- Create a new Accubid job:
|
||||
Path: "\\EgnyteDrive\Shared\Trimble\Accubid\Bid\{Project Name} - ConEst.es16"
|
||||
|
||||
@@ -0,0 +1,287 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags: []
|
||||
---
|
||||
# Sequence
|
||||
|
||||
## Electrical
|
||||
|
||||
### 1. Estimate preparation
|
||||
|
||||
2. Read about the project specifications and construction type
|
||||
3. Locate Equipment Schedules
|
||||
|
||||
4. Device specs (Decora or Standard)
|
||||
|
||||
### 2. Takeoff
|
||||
|
||||
1. Takeoff all equipment that is not #12
|
||||
2. Go by Drawing in chronological order
|
||||
3. Takeoff Enlarged Drawings
|
||||
4. Do final checklist in electrical takeoff notes
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
|
||||
1. Count Car chargers and location
|
||||
|
||||
## Feeders
|
||||
|
||||
### 1. Estimate preparation
|
||||
|
||||
Read about the project specifications and construction type
|
||||
|
||||
* Delivery Method: (Plans & Specs, Design Build, Design Assist, Preliminary Budget)
|
||||
* Deck thickness
|
||||
* Wiring method
|
||||
* Conductor material (Aluminum/Copper)
|
||||
|
||||
Locate:
|
||||
* Riser Diagram
|
||||
* Feeder Schedule (if present)
|
||||
* Main Electrical rooms and panel locations
|
||||
* Routing (if present)
|
||||
|
||||
### 2. Takeoff
|
||||
|
||||
* Choose a starting point on the riser
|
||||
* Determine wire & Conduit makeup (3Ph/1Ph, AL/CU, Conduit)
|
||||
* Measure off the length of the feed _ADDERS_
|
||||
* Square corners, use corridors if possible
|
||||
|
||||
Bus Duct
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
|
||||
## Fire Alarm - Riser
|
||||
|
||||
### 1. Estimate preparation
|
||||
|
||||
1. Initial the OneNote
|
||||
2. Find Fire Alarm plans (If Applicable)
|
||||
3. Locate Fire Command Center (FCC)
|
||||
|
||||
### 2. Takeoff
|
||||
|
||||
1. Use the FA Riser Script
|
||||
2. Takeoff Devices
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
|
||||
1. Sleeving for riser?
|
||||
2. Are Two-Way/DAS Included?
|
||||
|
||||
## Fire Alarm - Devices
|
||||
|
||||
### 1. Estimate preparation
|
||||
|
||||
2. Read about the project specifications and construction type
|
||||
3. Find FA drawings or where they are shown
|
||||
|
||||
### 2. Takeoff
|
||||
|
||||
1. Takeoff floor plans in order
|
||||
2. Takeoff enlarged drawings
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
|
||||
8. Fire Smoke Dampers (FSD's) FA or electrical?
|
||||
9. Sleeving?
|
||||
|
||||
## Lighting
|
||||
|
||||
### 1. Estimate preparation
|
||||
|
||||
1. Read about the project specifications and construction type
|
||||
2. In drawings, locate:
|
||||
* Fixture Schedule
|
||||
* Reflected Ceiling Plans
|
||||
|
||||
### 2. Takeoff
|
||||
|
||||
1. Takeoff floor plans in order
|
||||
2. Takeoff enlarged drawings
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
|
||||
1. Garage Homeruns
|
||||
2. Luminaire in Amenity Areas
|
||||
3. Ensure appropriate breakdowns
|
||||
* Site lighting in System =="Site Misc. Fixtures"==
|
||||
|
||||
## Units
|
||||
|
||||
### 1. Estimate preparation
|
||||
|
||||
1. Locate Unit panels and relevant keynotes
|
||||
* Bus amps
|
||||
|
||||
2. Read about the project specifications and construction type
|
||||
* Wood or Metal studs
|
||||
* Wiring Method
|
||||
* NM or MC
|
||||
* Wiring device plates
|
||||
* Decora or Standard
|
||||
* Wiring device specs
|
||||
* are 15A devices allowed?
|
||||
* Equipment (20A Kitchen and bath)
|
||||
|
||||
3. Fill out OneNote
|
||||
|
||||
### 2. Takeoff
|
||||
|
||||
1. Kitchen and Bath
|
||||
2. General assemblies
|
||||
3. Low Voltage
|
||||
4. Lighting Control
|
||||
5. Lighting Fixtures
|
||||
|
||||
Copy paste original takeoff and adjust to changes
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
|
||||
1. Scroll through with Area selected and make sure there is takeoff for each unit type
|
||||
|
||||
## Telecom - Devices
|
||||
|
||||
### 1. Estimate preparation
|
||||
|
||||
1. Locate Proposal/Scope of Work. Determine ownership and takeoff responsibility:
|
||||
* Cabling
|
||||
* Conduit & Pathways
|
||||
* Sleeving
|
||||
2. Locate which plans the LV is taken off on
|
||||
3. Locate LV Details
|
||||
4. Read about the project specifications and construction type
|
||||
5. Fill out OneNote
|
||||
|
||||
### 2. Takeoff
|
||||
|
||||
1. Takeoff devices as shown throughout the building
|
||||
2. Takeoff Conduit Riser as needed
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
|
||||
1. Sleeving
|
||||
|
||||
## Telecom - Riser
|
||||
|
||||
1. Service entrance conduit "Site Low Voltage Ductbank (SLVDB)"
|
||||
2. Riser throughout building
|
||||
3. Sleeving for riser
|
||||
|
||||
## Subfeeds
|
||||
|
||||
### 1. Estimate preparation
|
||||
|
||||
1. Read about the project specifications and construction type
|
||||
* Delivery Method: (Plans & Specs, Design Build, Design Assist, Preliminary Budget)
|
||||
* Deck Thickness
|
||||
* Corridor Ceiling type
|
||||
|
||||
2. In the drawings, locate:
|
||||
* Unit Panel Schedules
|
||||
* Unit Load Calculations
|
||||
* Riser Diagram
|
||||
* Subfeed schedule (if present)
|
||||
|
||||
### 2. Takeoff
|
||||
|
||||
1. Determine wiring method
|
||||
|
||||
| Construction Type | Wiring Method | Subfeed Options |
|
||||
| ----------------- | ------------- | --------------- |
|
||||
| 1,2 | MC Cable | MC, PVC, EMT |
|
||||
| 3,4,5 | NM Cable | SER, EMT |
|
||||
|
||||
%%
|
||||
TODO: Create flow chart for wiring methods.
|
||||
Some cases to mention:
|
||||
* Deck thickness (minimum 3x conduit outer diameter)
|
||||
* Renovations (may not be able to run in slab)
|
||||
%%
|
||||
|
||||
2. Route subfeeds to the Meter Centers using appropriate adder lengths
|
||||
|
||||
> [!tip]
|
||||
> Identify if and where typicals can be used
|
||||
|
||||
3. Assign material to lengths and apply Voltage drop if applicable
|
||||
|
||||
4. Pigtails and Wireway Troughs if applicable
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
|
||||
1. Use the extension tab to determine the Correct Quantity
|
||||
|
||||
## Switchgear
|
||||
|
||||
### 1. Estimate preparation
|
||||
|
||||
1. Initial the OneNote
|
||||
2. In the drawings, locate:
|
||||
* Riser Diagrams
|
||||
* House Panels
|
||||
|
||||
### 2. Takeoff
|
||||
|
||||
1. Copy over the Temporary assemblies from "Ben -1"
|
||||
2. Build Items in Distribution:
|
||||
* Panelboards
|
||||
* Switchboards
|
||||
* Transfer SWs
|
||||
* Meter centers
|
||||
* Generator
|
||||
3. Takeoff Common Assemblies:
|
||||
* XFMRs
|
||||
* Disconnect Switches
|
||||
* Bus Duct
|
||||
4. Takeoff Items in Item Database:
|
||||
* Wireway (Trough/Gutter)
|
||||
5. Takeoff Temp Assemblies:
|
||||
* CT Cabinet
|
||||
* Meter
|
||||
* Fire Pump
|
||||
* Fire Pump Controller
|
||||
* SPD/TVSS
|
||||
|
||||
When building panelboards/switchboards,
|
||||
add terminations according to an example from the schedules.
|
||||
Do not include feeder terminations.
|
||||
|
||||
Items to Avoid:
|
||||
* Tap Boxes
|
||||
* Bus Duct
|
||||
* Vault Room
|
||||
* Anything FPL
|
||||
* Grounding
|
||||
* Elevator Room
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
|
||||
1. Generator
|
||||
* Ensure takeoff is in the generator Area and System breakdowns
|
||||
* Put location, quantity, and type on OneNote
|
||||
|
||||
## Low Voltage
|
||||
|
||||
### 1. Estimate preparation
|
||||
|
||||
1. Locate Proposal/Scope of Work. Determine ownership and takeoff responsibility:
|
||||
* Cabling
|
||||
* Conduit & Pathways
|
||||
* Sleeving
|
||||
2. In the drawings, locate:
|
||||
* Floor plans where LV scope is shown
|
||||
* LV Details
|
||||
3. Read about the project specifications and construction type
|
||||
4. Fill out OneNote
|
||||
|
||||
### 2. Takeoff
|
||||
|
||||
1. Takeoff devices as shown throughout the building
|
||||
2. Takeoff riser conduit as needed
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
|
||||
1. Sleeving for riser
|
||||