@@ -21,7 +21,7 @@ Such methods lack the ability to intelligently express [[uncertainty]].
|
|||||||
|
|
||||||
### Limitations of Orthodox Methods
|
### Limitations of Orthodox Methods
|
||||||
|
|
||||||
A hallmark of orthodox estimating methods is "Detailed Takeoff",
|
A hallmark of orthodox estimating methods is "detailed takeoff",
|
||||||
which seeks to [[estimate-decomposition|decompose]]
|
which seeks to [[estimate-decomposition|decompose]]
|
||||||
an estimate to _all_ its constituent subcosts,
|
an estimate to _all_ its constituent subcosts,
|
||||||
including 100% itemized pricing by way of a **material extension**,
|
including 100% itemized pricing by way of a **material extension**,
|
||||||
|
|||||||
@@ -0,0 +1,70 @@
|
|||||||
|
---
|
||||||
|
id: 2026-05-01T20:37:29-0400
|
||||||
|
title: 2026-05-01 20:37:29
|
||||||
|
tags: []
|
||||||
|
daily: "[[2026-05-01]]"
|
||||||
|
---
|
||||||
|
# 2026-05-01 20:37:29
|
||||||
|
|
||||||
|
Earlier [[2026-05-01|today]]
|
||||||
|
while editing [[orthodox-construction-estimating]]
|
||||||
|
my frustration with the term "detailed takeoff" was reignited
|
||||||
|
and I searched in vain for the term describing its type:
|
||||||
|
|
||||||
|
> a name which presupposes some quality of the subject
|
||||||
|
> which is not inherent to it.[^1]
|
||||||
|
|
||||||
|
[^1]: "Detailed takeoff" is more a victim of the common positive connotation of "detailed",
|
||||||
|
which seems to exist for all adjectives synonymous in the same context like "precise".
|
||||||
|
The common connotation is what's frustrating, I suppose.
|
||||||
|
Surely everyone has seen the comparison of the targets
|
||||||
|
and knows that precision says nothing meaningful about performance.
|
||||||
|
|
||||||
|
My search came up empty,
|
||||||
|
which didn't surprise me,
|
||||||
|
I've never cured a case of [lethologica](https://en.wikipedia.org/wiki/Tip_of_the_tongue)
|
||||||
|
with Google or LLM's.
|
||||||
|
(but I keep trying)
|
||||||
|
|
||||||
|
Later I found the answer in [[merrow_2022_contract-strategies]]:
|
||||||
|
Merrow regrets the relevance implied
|
||||||
|
by the [_value-laden_](https://en.wiktionary.org/wiki/value-laden) term
|
||||||
|
[[statistical-significance]].
|
||||||
|
|
||||||
|
***
|
||||||
|
|
||||||
|
It is said often
|
||||||
|
that [[construction-estimating]] in some or all part art,
|
||||||
|
not wholly science.
|
||||||
|
This attitude is a coping mechanism
|
||||||
|
excusing our acceptance of a deeply flawed status quo,
|
||||||
|
and our unwillingness to look for answers
|
||||||
|
to questions that our methods have begged for decades.
|
||||||
|
|
||||||
|
Due to obstacles discussed in [[kahneman_2011_thinking]]
|
||||||
|
repeated in [[hubbard_2020_failure]],
|
||||||
|
construction estimating as a profession
|
||||||
|
suffers from poor conditions for natural improvement of [[estimator-calibration]],
|
||||||
|
namely delayed and uninformative feedback.
|
||||||
|
As a consequence,
|
||||||
|
decisions are made on [[gut-feel]] at best,
|
||||||
|
and superstition at worst.
|
||||||
|
The suitability of estimating methods
|
||||||
|
is judged based on [value](https://en.wikipedia.org/wiki/Value_(ethics))[^2]
|
||||||
|
and [aesthetic](https://en.wikipedia.org/wiki/Aesthetics).
|
||||||
|
rather than [empirical evidence](https://en.wikipedia.org/wiki/Empirical_evidence).
|
||||||
|
|
||||||
|
[^2]: [Value judgment](https://en.wikipedia.org/wiki/Value_judgment)
|
||||||
|
|
||||||
|
***
|
||||||
|
|
||||||
|
What makes a good estimator
|
||||||
|
(besides their ability to click all the little circles on a drawing)
|
||||||
|
is their judgement, the quality of their assumptions.
|
||||||
|
Herein lies the paradox of [[orthodox-construction-estimating]]:
|
||||||
|
_assumptions are only necessitated by its incompatibility with [[uncertainty]]._
|
||||||
|
|
||||||
|
***
|
||||||
|
|
||||||
|
Construction estimating is pure science,
|
||||||
|
acceptability is the art.
|
||||||