vault backup: 2026-05-01 16:24:18

This commit is contained in:
2026-05-01 16:24:18 -04:00
parent f7c50ed0d2
commit eb30cdb79c
71 changed files with 155 additions and 135 deletions
-22
View File
@@ -20,25 +20,3 @@ For tasks describable in a single imperative, see [[small-tasks]].
These tasks are will never be complete,
so long as the notebook is in use.
### Assign Note Authorship
![[backlog.base#notes-without-authorship]]
### Assign Note Destiny
![[backlog.base#notes-without-destiny]]
### Assign Note Status
![[backlog.base#notes-without-status]]
### Cull Fleeting Notes
Handle and delete [[tags#destiny/fleeting|fleeting]] notes.
![[backlog.base#fleeting-notes]]
## One-Time Tasks
![[tasks.base#meta]]
+2 -4
View File
@@ -1,9 +1,7 @@
---
tags:
- destiny/fleeting
- topic/construction/electrical
- type/encyclopedia
title: Alternating Current
tags: []
up: "[[electricity]]"
---
# Alternating Current
+4 -4
View File
@@ -1,9 +1,8 @@
---
tags:
- destiny/fleeting
- topic/construction/electrical
- type/encyclopedia
title: Conductor Sizing
tags:
- type/encyclopedia
up: "[[electrical-construction]]"
---
# Conductor Sizing
@@ -163,6 +162,7 @@ $$
$$
1~\text{electric horsepower} \equiv 746~\text{watts}
$$
full-load current (FLC) / full-load amperes (FLA)
minimum circuit ampacity (MCA)
-2
View File
@@ -1,8 +1,6 @@
---
title: Conduit Sizing
tags:
- destiny/fleeting
- topic/construction/electrical
- type/encyclopedia
up: "[[electrical-construction]]"
---
+5 -5
View File
@@ -1,14 +1,14 @@
---
tags:
- destiny/fleeting
- topic/construction/electrical
- type/task
- topic/meta
title: Consolidate Electrical Info
tags:
- topic/meta
- type/task
up: "[[my-tasks]]"
---
# Consolidate Electrical Info
Necessitated by task [[refactor-system-scripts]].
Consolidate [[electrical-disambiguation|electrical]] info:
* Consolidate and expand on existing content
* Create an entry point for topic
-4
View File
@@ -64,7 +64,3 @@ Create and use cross-topic notes for complex thoughts:
* [[estimating-philosophy]]
* [[purpose-of-construction-estimating]]
* [[orthodox-construction-estimating]]
## Relevant Notes
![[estimating-thoughts.base#fleeting]]
+2 -1
View File
@@ -2,11 +2,12 @@
title: C#
tags:
- type/encyclopedia-entry
up: "[[computer-language]]"
---
# C\#
C\# (read "C sharp", like the [[music-theory|musical]] symbol)
is modern high-level [[programming-languages|language]]
is modern high-level [[computer-language|programming language]]
supporting [[object-oriented-programing|object-oriented]] patterns.
It is the sane man's Java.
+1 -1
View File
@@ -1,8 +1,8 @@
---
tags:
- type/encyclopedia
- topic/construction/electrical
title: Distribution Equipment
up: "[[electrical-construction]]"
---
# Distribution Equipment
+1 -1
View File
@@ -51,7 +51,7 @@ even where serving Amenity spaces.
Clubline Raceway, also called CRG Raceway,
is a glorified cable management trough.
It is not a [[nfpa-70_376_metal-wireways|wireway]],
It is not a [[nfpa-70_376|wireway]],
so conductors must be run in a [[nfpa-70_national-electric-code#Chapter 3 Wiring Methods and Materials|Chapter 3]] wiring method.
Count receptacles normally,
+3
View File
@@ -5,3 +5,6 @@ tags:
up: "[[conest-projects]]"
---
# Elliot St. Hotel
Elliott St. Hotel (fka 88 Elliott Street)
88 ELLIOTT ST SW, ATLANTA, GA 30313
+1 -1
View File
@@ -1,8 +1,8 @@
---
tags:
- topic/construction/electrical
- type/encyclopedia
title: Emergency Communications Systems (ECS)
up: "[[electrical-construction]]"
---
# Emergency Communications Systems (ECS)
+2 -3
View File
@@ -1,8 +1,7 @@
---
tags:
- topic/construction/electrical
- type/guide
title: Fire Alarm
tags: []
up: "[[electrical-construction]]"
---
# Fire Alarm
+3 -6
View File
@@ -1,11 +1,8 @@
---
tags:
- authorship/original
- destiny/permanent
- status/incomplete
- topic/construction/electrical
- type/encyclopedia
title: Fire Resistive Wiring Methods
tags:
- type/encyclopedia
up: "[[electrical-construction]]"
---
# Fire Resistive Wiring Methods
+6
View File
@@ -13,6 +13,12 @@ See also [[lighting-controls-takeoff]] and [[electrical-takeoff#Lighting Homerun
[[fixture-designations]]
## Emergency Fixtures
It is not usually necessary to count emergency fixtures separately.[^1]
[^1]: [[2025-11-18_16-33-00]]
## Garage
### Fixtures
+2 -6
View File
@@ -1,11 +1,7 @@
---
title: Gold Plating
tags:
- status/complete
- topic/construction
- topic/construction/electrical
- topic/risk
- type/encyclopedia-entry
tags: []
up: "[[construction]]"
---
# Gold Plating
+11
View File
@@ -0,0 +1,11 @@
---
title: Heterodox Construction Estimating
tags: []
---
# Heterodox Construction Estimating
**Heterodox construction estimating**
refers to unpopular or unconventional methods of [[construction-estimating]].
As [[heterodoxy]],
such methods are defined by their variance from [[orthodox-construction-estimating]].
+8 -8
View File
@@ -17,20 +17,20 @@ up: "[[conest-projects]]"
* [x] [[feeders-takeoff]]
* [x] [[subfeeds-takeoff]]
* [ ] [[switchgear-takeoff]]
* [ ] Lighting Inverters
* [x] [[switchgear-takeoff]]
* [x] Lighting Inverters
* [x] [[units-takeoff]]
* [/] [[fixtures-takeoff]]
* [ ] Site Lighting
* [/] Site Lighting
* [/] [[lighting-controls-takeoff]]
* [/] [[electrical-takeoff]]
* [ ] Residential level 04 lighting inverter(s?) power
* [ ] Trash chute power
* [x] Residential level 04 lighting inverter(s?) power
* [x] [[electrical-takeoff#Trash Chute]]
* [ ] [[electrical-takeoff#Unit Condensing Units]]
* [-] Unit CU control wiring, conduit
* [ ] EV Chargers
* [/] [[lighting-controls-takeoff]]
* [?] Lighting controls in corridors
* [/] EV Chargers
* [x] [[lighting-controls-takeoff]]
* [x] Lighting controls in corridors
* [ ] [[telecom-takeoff]]
* [ ] Homeruns
* [ ] [[low-voltage-takeoff]]
-2
View File
@@ -1,7 +1,5 @@
---
tags:
- destiny/uncertain
- topic/construction/electrical
- type/encyclopedia
title: HVAC Calculations
up: "[[electrical-construction]]"
+1 -1
View File
@@ -4,7 +4,7 @@ aliases:
tags:
- authorship/other
- exclude-from-word-count
- topic/construction/electrical
- topic/construction
- type/media/reference
title: SECTION 403---HIGH-RISE BUILDINGS
---
+1 -1
View File
@@ -2,7 +2,7 @@
tags:
- authorship/other
- exclude-from-word-count
- topic/construction/electrical
- topic/construction
- type/media/reference
title: SECTION 918---EMERGENCY RESPONDER COMMUNICATION COVERAGE
---
+1 -1
View File
@@ -5,7 +5,7 @@ title: SECTION 1009---ACCESSIBLE MEANS OF EGRESS
tags:
- authorship/other
- exclude-from-word-count
- topic/construction/electrical
- topic/construction
- type/media/reference
---
# SECTION 1009---ACCESSIBLE MEANS OF EGRESS
+1 -1
View File
@@ -5,7 +5,7 @@ title: SECTION 510---EMERGENCY RESPONDER RADIO COVERAGE
tags:
- authorship/other
- exclude-from-word-count
- topic/construction/electrical
- topic/construction
- type/media/reference
---
# SECTION 510---EMERGENCY RESPONDER RADIO COVERAGE
+1 -1
View File
@@ -5,7 +5,7 @@ title: SECTION 907---FIRE ALARM AND DETECTION SYSTEMS
tags:
- authorship/other
- exclude-from-word-count
- topic/construction/electrical
- topic/construction
- type/media/reference
---
# SECTION 907---FIRE ALARM AND DETECTION SYSTEMS
+2 -1
View File
@@ -8,7 +8,8 @@ tags:
# Incentives
> [!quote] Charlie Munger
> Show me the incentive and I will show you the outcome.
> Show me the incentive
> and I will show you the outcome.
> [!cite] Goodhart's Law
> When a measure becomes a target,
+1 -1
View File
@@ -1,8 +1,8 @@
---
title: Lighting Controls
tags:
- topic/construction/electrical
- type/encyclopedia
up: "[[electrical-construction]]"
---
# Lighting Controls
+1 -1
View File
@@ -1,8 +1,8 @@
---
tags:
- topic/construction/electrical
- type/encyclopedia
title: Lightning Protection
up: "[[electrical-construction]]"
---
# Lightning Protection
+1 -1
View File
@@ -1,8 +1,8 @@
---
tags:
- topic/construction/electrical
- type/encyclopedia
title: Low Voltage Systems
up: "[[electrical-construction]]"
---
# Low Voltage Systems
+1 -1
View File
@@ -1,8 +1,8 @@
---
title: Luminaire Types
tags:
- topic/construction/electrical
- type/encyclopedia
up: "[[electrical-construction]]"
---
# Luminaire Types
-1
View File
@@ -1,7 +1,6 @@
---
title: Medium Voltage
tags:
- topic/construction/electrical
- type/encyclopedia-entry
up: "[[electrical-construction]]"
---
+1
View File
@@ -5,6 +5,7 @@ tags:
- status/draft
- topic/writing
- type/encyclopedia-entry
up: "[[my-interests]]"
---
# Favorite Quotes
+1
View File
@@ -3,6 +3,7 @@ title: Homelab
tags:
- topic/hobbies/homelab
- type/minutes
up: "[[my-interests]]"
---
# Homelab
+2 -3
View File
@@ -4,12 +4,11 @@ tags:
- destiny/permanent/entry-point
- status/draft
- type/directory
up: "[[zane-meyers]]"
---
# Personal Tasks
# My Tasks
This note collects my personal tasks and goals.
For tasks relevant to the organization of [[this-notebook]],
see [[TODO]].
![[tasks.base#personal]]
+5
View File
@@ -0,0 +1,5 @@
---
title: Article 376 Metal Wireways
tags: []
---
# Article 376 Metal Wireways
+1 -1
View File
@@ -66,7 +66,7 @@ title: "NFPA 70: National Electric Code"
* [[nfpa-70_370_cablebus|370 Cablebus]]
* [[nfpa-70_372|372 Cellular Concrete Floor Raceways]]
* [[nfpa-70_374|374 Cellular Metal Floor Raceways]]
* [[nfpa-70_376_metal-wireways|376 Metal Wireways]]
* [[nfpa-70_376|376 Metal Wireways]]
* [[nfpa-70_378|378 Nonmetallic Wireways]]
* [[nfpa-70_380|380 Multioutlet Assembly]]
* [[nfpa-70_382|382 Nonmetallic Extensions]]
-2
View File
@@ -1,8 +1,6 @@
---
title: Ohm's Law
tags:
- destiny/fleeting
- topic/construction/electrical
- type/encyclopedia-entry
up: "[[electricity]]"
---
+5
View File
@@ -0,0 +1,5 @@
---
title: Organization
tags: []
---
# Organization
+7 -8
View File
@@ -10,8 +10,8 @@ title: Traditional Estimating Methods
Also "single-point estimation"
as opposed to the standard three-point.
"Traditional estimating methods"
as referenced frequently in [[this-notebook]]
"[[orthodoxy|Orthodox]] estimating methods"
as referenced in [[this-notebook]]
are those [[construction-estimating]] methods that produce:
* an _exhaustive_ and _specific_ bill of material
@@ -21,14 +21,13 @@ Such methods lack the ability to intelligently express [[uncertainty]].
### Limitations of Orthodox Methods
Traditional estimating methods,
sometimes referred to as "Detailed Takeoff",
seek to detail all constituent subcosts,
including 100% itemized pricing by way of a _material extension_,
A hallmark of orthodox estimating methods is "Detailed Takeoff",
which seeks to [[estimate-decomposition|decompose]]
an estimate to _all_ its constituent subcosts,
including 100% itemized pricing by way of a **material extension**,
a complete list of all material included in the price.
For clarity and contrast to [[risk-oriented-estimating]],
which does not require itemized pricing,
because "detailed takeoff"
I'll refer to these methods as "item-oriented estimating".
By popular belief,
-1
View File
@@ -1,6 +1,5 @@
---
tags:
- topic/construction/electrical
- type/encyclopedia
title: Outlets
up: "[[electrical-construction]]"
+1 -1
View File
@@ -68,7 +68,7 @@ There is no standard format for these matrices.
## Setup WBS
> See [[earned-value-management]]
> See [[pdi-wbs]]
```pwsh
Set-Location "\\EgnyteDrive\Shared\Estimating\19 WBS Agreement GP"
+2
View File
@@ -9,6 +9,8 @@ tags:
---
# PDI WBS
> See [[earned-value-management]].
## CBOM Accubid Export
In master [[accubid|Accubid]] file,
+10
View File
@@ -0,0 +1,10 @@
---
id: 2026-05-01
title: 2026-05-01
tags: []
weekly: "[[2026w18]]"
monthly: "[[2026-05]]"
quarterly: "[[2026q2]]"
previous: "[[2026-04-30]]"
---
# 2026-05-01
+5
View File
@@ -0,0 +1,5 @@
---
title: Psychology
tags: []
---
# Psychology
+1 -1
View File
@@ -2,7 +2,7 @@
title: Python
tags:
- type/encyclopedia-entry
- up: "[[programming-languages]]"
- up: "[[computer-language]]"
---
# Python
-2
View File
@@ -1,8 +1,6 @@
---
title: Raceway Terms
tags:
- destiny/fleeting
- topic/construction/electrical
- type/encyclopedia
up: "[[electrical-construction]]"
---
+1
View File
@@ -3,6 +3,7 @@ title: Regular Expressions
tags:
- topic/software
- type/encyclopedia-entry
up: "[[computer-language]]"
---
# Regular Expressions
-2
View File
@@ -2,8 +2,6 @@
title: Secure Facilities
tags:
- authorship/other-for-now
- topic/construction
- topic/construction/electrical
- type/encyclopedia-entry
up: "[[construction]]"
---
+1
View File
@@ -7,6 +7,7 @@ tags:
authors:
- David A. Snyder, PE
year: 2020
up: "[[electrical-construction]]"
---
# Voltage Drop Calculations
+1 -1
View File
@@ -35,4 +35,4 @@ and estimation
It's not engineering to budget for the most likely case.
Estimators need not know _why_ there tends to be ~~example~~,
they need need only have basis for applying that generalization to another project.
they need only have basis for applying that generalization to another project.
+1 -1
View File
@@ -12,7 +12,7 @@ daily: "[[2025-10-31]]"
_Friday Evening_
This morning as I was leaving for work I saw a massive congregation
of all the walky water birds I love so much. A hundred and more, milling about
of all the walky water [[birds]] I love so much. A hundred and more, milling about
in-the early sunrise. The banks were covered in ibises picking at the grass
around the feet of egrets standing proudly and spaced just so. A dozen anhingas
splashed messily in the center of the pond while a lone stork looked on with
+2 -2
View File
@@ -13,8 +13,8 @@ _Saturday Morning_
Somehow I've already let an hour get away from me.
Today I need to do some cleaning: a load of laundry and leftover dishes
at least. I'll do those after I finish this note, plus some pushups, before
I shower and change to go visit the birds across the street. Later I'll need
to go to the store for more sliced almonds and coconut oil so I can make gran­ola
I shower and change to go visit the [[birds]] across the street. Later I'll need
to go to the store for more sliced almonds and coconut oil so I can make [[gran­ola]]
for tomorrow's breakfast. I'll go to Walmart so I can get a new mattress
protector, too. Copy paper, a 3-hole punch and a small binder would also be
nice for my typewriter journaling.
+1 -1
View File
@@ -12,4 +12,4 @@ _Saturday Morning_
I wasted more time doomscrolling after my last note, but I did manage
to do the laundry, dishes, and pushups. Now I need to shower and dress in time
to see the birds.
to see the [[birds]].
+2 -2
View File
@@ -10,8 +10,8 @@ daily: "[[2025-11-01]]"
# 2025-11-01 08:25:??
There were fewer than yesterday, but still a ton. There was a chill, but
I was dressed well for it. I think with exposure the birds will get used to
mg presence. I saw a bald eagle (_Haliaeetus leucocephalus_) for the first time
I was dressed well for it. I think with exposure the [[birds]] will get used to
my presence. I saw a bald eagle (_Haliaeetus leucocephalus_) for the first time
in Florida. They are ugly creatures, of both body and spirit, unlike the wood
stork (_Mycteria americana_) which is uglier of body, but pure of heart.
There was also some guy getting dumped on the phone and not taking it well.
+2 -3
View File
@@ -36,10 +36,9 @@ This analysis of 334.12(A)(2) is flawed.
Based on the [[nfpa-70_100_definitions|Article 100]] definitions
of [[nfpa-70_100_definitions#Exposed (as applied to wiring methods).|exposed]]
and [[nfpa-70_100_definitions#Dwelling, Multifamily.|dwelling]],
[[nfpa-70_334_nm-cable#334.12(A) Types NM and NMC.|334.12(A)(2)]]
can be paraphrased as follows:
334.12(A)(2) can be paraphrased as follows:
> [!cite] NEC 334.12(A)(2), pp.
> [!cite] [[nfpa-70_334_nm-cable#334.12(A) Types NM and NMC.|NEC 334.12(A)(2)]], pp.
> Types NM and NMC cable are not permitted to be installed
> in accessible spaces above suspended ceilings,
> _except in buildings containing one or more dwelling units._
+2 -2
View File
@@ -10,9 +10,9 @@ daily: "[[2025-11-11]]"
_Tuesday Morning, Before Work_
One of the most appealing aspects of estimating
One of the most appealing aspects of [[construction-estimating]]
to me is the dynamic we have with our employers.
my experience was at Ace that estimators act like,
my experience was at [[ace-electric-inc|Ace]] that estimators act like,
and are treated like good artists, like loveable
little scamps who always get into trouble, but
you keep them around because they do good work.
+2 -2
View File
@@ -9,11 +9,11 @@ daily: "[[2025-11-11]]"
---
# 2025-11-11 14:41:??
I just saw a post on a construction estimators forum
I just saw a post on a [[construction-estimating|construction estimators]] forum
from a user lamenting that their coworkers and customers
largely do not understand the difference between markup and margin.
It made me remember the micro-debates about that I would have with Dale
It made me remember the micro-debates about that I would have with [[dale-flythe|Dale]]
every time we were closing out an estimate.
This is the example I would always give
while trying to explain it to him.
+1 -1
View File
@@ -7,7 +7,7 @@ daily: "[[2025-11-13]]"
---
# 2025-11-13 08:03:??
I was thinking about recent critiques of my writing style
I was thinking about recent critiques of my [[writing]] style
and how they don't really apply to my speech,
even though I don't imagine myself approaching them differently.
+1 -1
View File
@@ -10,7 +10,7 @@ daily: "[[2025-11-13]]"
I'm still working on articulating
my main difficulty in the transition
from Ace to PDI estimating.
from [[ace-electric-inc|Ace]] to [[power-design-inc|PDI]] estimating.
At a high level,
it's that our process is built on _instrumental_ methods,
+1 -4
View File
@@ -38,10 +38,7 @@ Fire stopping budget = $25-35 per Unit.
Robotic Total Station hours: match Structural Foreman.
For contracts 5--15 million dollars:
$$
\text{Equipment Cost} \approx 1\%
$$
Equipment Cost $$\approx$$ 1% of Contract Value
Mid Atlantic: 1 trip per month
+7 -3
View File
@@ -9,6 +9,12 @@ daily: "[[2025-11-21]]"
---
# 2025-11-21 10:11:??
## "Hours Burned vs. Hours Earned"
%%
A criticism of [[earned-value-management]] in [[construction]].
%%
> [!quote] [ELECTRI's Industry Benchmarking Tool - ELECTRI International](https://www.electri.org/research-overview/electris-industry-benchmarking-tool/)
> ### Hours Burned vs. Hours Earned
>
@@ -23,7 +29,7 @@ This is a terribly problematic metric.
If a project went over its material budget
despite standard rigorous oversight
where would you first look,
construction or estimating?
operations or estimating?
In almost all cases the safer bet is estimating.
Why should labor be different?
@@ -31,6 +37,4 @@ Wherever there is budget variance
there is a persistent tendency to blame construction
before estimating.
[[earned-value-management-in-construction-estimating]]
[[purpose-of-construction-estimating#The Myth of Estimate Accuracy]]
+5
View File
@@ -9,6 +9,11 @@ daily: "[[2025-11-24]]"
## Extracting PDF Panel Schedules
%%
steps to extract panel schedule data
from [[pdf]] drawings
%%
Extract relevant pages
Crop Sheet Titles
+1 -1
View File
@@ -8,7 +8,7 @@ daily: "[[2025-12-02]]"
### Set Notation Example
Let $A$ and $B$ be sets
Let $A$ and $B$ be [[set-theory|sets]]
sharing some but not all elements.
* $A \cap B \neq \varnothing$:
+5
View File
@@ -8,6 +8,11 @@ daily: "[[2025-12-02]]"
### Panel Schedule Relationship Diagram
%%
brainstorming abstractions for `Panelboard` objects,
possibly for use in custom [[construction-estimating-software]].
%%
#### Sections
A panelboard with multiple sections
+1 -1
View File
@@ -14,7 +14,7 @@ and as frameworks for general decision-making.
The idea that one could devote significant thought
into making a decision aligned with their [[personal-values]]
and fail to pick the best option to that end is intriguing to me,
more so that an accurate quantization of ones values
moreso that an accurate quantization of ones values
and that the appropriate framework could trivialize all such decisions.
Personal decision-making is often described
+4 -1
View File
@@ -8,6 +8,8 @@ daily: "[[2026-02-12]]"
---
# 2026-02-12 09:49:56
[[electrical-construction]]
### Interrupting Rating
* "short-circuit interrupting rating"
@@ -25,7 +27,8 @@ Measured in amperes, usually shown as kAIC.
[[nfpa-70_110_requirements#^10|NEC 110.10 Circuit Impedance, Short-Circuit Current Ratings, and Other Characteristics.]]
Applies to **assemblies**: distribution equipment like switchboards, panelboards, switches, etc.
Applies to **assemblies**: distribution equipment
like switchboards, panelboards, switches, etc.
Maximum current that the equipment can withstand
in a short-circuit event without damage.
+1 -1
View File
@@ -1,8 +1,8 @@
---
title: Twisted Pair Cable
tags:
- topic/construction/electrical
- type/encyclopedia-entry
up: "[[electrical-construction]]"
---
# Twisted Pair Cable
+2 -2
View File
@@ -7,7 +7,7 @@ tags:
---
# Utility
[Utility](https://en.wikipedia.org/wiki/Utility)
[**Utility**](https://en.wikipedia.org/wiki/Utility)
is a measure of a party's **satisfaction**
with a certain state of the world.
@@ -30,7 +30,7 @@ and that I've thought about
## See Also
[Sorites paradox in utility theory](https://en.wikipedia.org/wiki/Sorites_paradox#Resolutions_in_utility_theory)
[Sorites paradox resolutions in utility theory](https://en.wikipedia.org/wiki/Sorites_paradox#Resolutions_in_utility_theory)
## Normative and Descriptive Utility
+5 -1
View File
@@ -13,9 +13,13 @@ of some reduction in [[uncertainty]].
It is the amount a rational party would be willing to pay
to gain access to information prior to making a decision.
"Value" in this context could represent several concepts,
currency or [[utility]],
but usually measured in the local medium of exchange.
## Example
Suppose a decision maker has the opportunity to purchase information $I$.
Suppose a decision maker has the opportunity to purchase [[information]] $I$.
Consider these two scenarios:
1. the decision maker does not purchase the information
+1 -1
View File
@@ -1,8 +1,8 @@
---
title: Voltage Drop
tags:
- topic/construction/electrical
- type/encyclopedia-entry
up: "[[electricity]]"
---
# Voltage Drop
+1 -1
View File
@@ -2,7 +2,7 @@
title: Wishlist
tags:
- status/draft
up: "[[zane-meyers]]"
up: "[[my-things]]"
---
# Wishlist
+1 -1
View File
@@ -76,5 +76,5 @@ tend to spend it exercising or in other more reasonable activities.
I want to be involved construction estimating for the rest of my working life.
Current discourse on the subject is self-similar and sanitized.
I'd like to be known as an innovator in [[estimating-philosophy]],
I'd like to be known as an innovator in [[heterodox-construction-estimating]],
and for solving some of its open problems.