vault backup: 2026-03-03 12:26:29

This commit is contained in:
2026-03-03 12:26:30 -05:00
parent 22ee554d0e
commit ccd51d7685
7 changed files with 26 additions and 40 deletions
+1 -1
View File
@@ -19,7 +19,7 @@ from Ace to PDI estimating.
At a high level,
it's that our process is built on _instrumental_ methods,
but that it is frequently judged from a _realist_ perspective.
See [[realism-vs-instrumentalism]].
See [[heuristics#Realism vs. Instrumentalism]].
There may be a more accurate way to state this.
[[2025-11-10_11-14-00]] may be an example of a similar issue,
+1 -1
View File
@@ -34,4 +34,4 @@ because otherwise it would be necessary to have double the assemblies,
or to expect estimators to substitute each size of wire
everywhere bare was necessary.
See [[realism-vs-instrumentalism]].
See [[heuristics#Realism vs. Instrumentalism]].
+1 -1
View File
@@ -17,7 +17,7 @@ which were based on conflicting direction
received from other estimators and seniors,
were made _without_ reason.
See [[realism-vs-instrumentalism]].
See [[heuristics#Realism vs. Instrumentalism]].
The peer's senior is looking for a _realist_ objection to his methods,
which an estimator without field experience (which the senior has)
+1 -1
View File
@@ -49,7 +49,7 @@ yearly: "[[2026]]"
> in other than [[units-takeoff|Units]].
I expressed that,
from a [[realism-vs-instrumentalism|realist]] perspective,
from a [[heuristics#Realism vs. Instrumentalism|realist]] perspective,
the `... DEVICES WITH WIRE - PVC` assemblies
are unsuitable for use in drop ceilings
since they don't provide a flex whip and box.