vault backup: 2026-03-03 12:26:29
This commit is contained in:
@@ -19,7 +19,7 @@ from Ace to PDI estimating.
|
||||
At a high level,
|
||||
it's that our process is built on _instrumental_ methods,
|
||||
but that it is frequently judged from a _realist_ perspective.
|
||||
See [[realism-vs-instrumentalism]].
|
||||
See [[heuristics#Realism vs. Instrumentalism]].
|
||||
|
||||
There may be a more accurate way to state this.
|
||||
[[2025-11-10_11-14-00]] may be an example of a similar issue,
|
||||
|
||||
@@ -34,4 +34,4 @@ because otherwise it would be necessary to have double the assemblies,
|
||||
or to expect estimators to substitute each size of wire
|
||||
everywhere bare was necessary.
|
||||
|
||||
See [[realism-vs-instrumentalism]].
|
||||
See [[heuristics#Realism vs. Instrumentalism]].
|
||||
|
||||
@@ -17,7 +17,7 @@ which were based on conflicting direction
|
||||
received from other estimators and seniors,
|
||||
were made _without_ reason.
|
||||
|
||||
See [[realism-vs-instrumentalism]].
|
||||
See [[heuristics#Realism vs. Instrumentalism]].
|
||||
|
||||
The peer's senior is looking for a _realist_ objection to his methods,
|
||||
which an estimator without field experience (which the senior has)
|
||||
|
||||
@@ -49,7 +49,7 @@ yearly: "[[2026]]"
|
||||
> in other than [[units-takeoff|Units]].
|
||||
|
||||
I expressed that,
|
||||
from a [[realism-vs-instrumentalism|realist]] perspective,
|
||||
from a [[heuristics#Realism vs. Instrumentalism|realist]] perspective,
|
||||
the `... DEVICES WITH WIRE - PVC` assemblies
|
||||
are unsuitable for use in drop ceilings
|
||||
since they don't provide a flex whip and box.
|
||||
|
||||
Reference in New Issue
Block a user